Planning application
1 - 30 Glanrafon Llanrwst LL26 0DL
Works: New dwelling Demolition Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Demolition of 30 apartments and erection of 14 affordable dwellings with associated parking, landscaping and public open space.
As published by the council, reference 0/46652
Application record
- Reference
- 0/46652
- Type
- Full
- Status
- FINAL DECISION
- Decision
- Approved With Conditions
- Received
- 19 Aug 2019
- Validated
- 10 Sep 2019
- Decided
- 19 Feb 2020
- Ward
- Crwst (pre 05-2022), Gower (pre 05-2022)
- Parish
- Cyngor Tref Llanrwst Town Council
- Decision by
- Case Officer
- Postcode
- LL26 0DL
Timeline
Dates from the published record
-
19 Aug 2019
Received by Conwy
-
10 Sep 2019
Validated
Checked as complete and ready for consideration.
-
19 Feb 2020
Decision issued: Approved With Conditions
-
14 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
82 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Al-Karim Cae Llan Llanrwst LL26 0DH
Proposed First Floor Extension and New Balcony
Granted Full applications Extension 13 docs -
Bryn Seion 27 Station Road Llanrwst Conwy LL26 0BT
86% historically approved · decision due ~29 Oct
To crown reduce or fell one cypress in the front garden of No.27.
Awaiting decision Trees 2 docs -
1-30 Glanrafon Llanrwst LL26 0DL
Variation of condition no 15 (Highway Works/Improvements) of planning approval 0/46652 (Demolition of 30 apartments and erection of 14 affordable dwellings with associated parking, landscaping and public open space) in accordance with the alternative proposals submitted
Granted Full applications New dwelling Demolition 19 docsMajor scheme -
23 Station Road Llanrwst LL26 0BT
Refurbishment and internal alterations to existing wine shop, part replacement of rear extension, new rear external staircases leading to first floor flats and alterations to shop fronts to include new signage and awnings
Granted Full applications New dwelling Extension 21 docs -
23 Station Road Llanrwst LL26 0BT
Refurbishment and internal renovations to existing wine shop and part-retrospective application for the demolition of unsafe rear ground floor extension and proposed erection of ground floor extension and roof terrace to include solar panels with alterations to shop fronts and awnings
Granted Full applications Extension Demolition 41 docs -
23 Station Road Llanrwst LL26 0BT
Refurbishment and internal renovations to existing wine shop and part-retrospective application for the demolition of unsafe rear ground floor extension and proposed erection of ground floor extension and roof terrace to include solar panels with alterations to shop fronts and awnings
Withdrawn Full applications Extension Demolition 29 docs
Other full applications applications
In Conwy
-
0/52696 Granted
Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY
Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd
-
0/53549 Refused
2 A Mostyn Street Llandudno LL30 2PS
Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)
-
0/53528 Refused
Riviera 13 Arvon Avenue Llandudno LL30 2DY
Change of use from guest house (C1) to a single dwellinghouse (C3)
-
0/53502 Granted
15 Maes Rhun Tyn Y Groes Conwy LL32 8PA
Erection of side/rear extension, with infill, part conversion of existing garage
-
0/53550 Granted
60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP
Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.