Skip to content
PlanIndex Get alerts
Menu

Planning application

19 High Street Conwy Conwy LL32 8DE

Granted Conwy 0/45435 Full

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Proposed change of use of part of existing first floor to form extra floor area to existing ground floor business premises ( Retrospective)

As published by the council, reference 0/45435

Application record

Reference
0/45435
Type
Full
Status
FINAL DECISION
Decision
Approved With Conditions
Received
25 Jul 2018
Validated
3 Aug 2018
Decided
24 Sep 2018
Ward
Conwy
Parish
Cyngor Tref Conwy Town Council
Decision by
Case Officer
Postcode
LL32 8DE

Timeline

Dates from the published record

  1. 25 Jul 2018

    Received by Conwy

  2. 3 Aug 2018

    Validated

    Checked as complete and ready for consideration.

  3. 24 Sep 2018

    Decision issued: Approved With Conditions

  4. 30 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Rear of 19 and 21 High Street Conwy LL32 8DE

    0/48559 Submitted 17 May 2021 0m away

    Use of garden at the rear of nos 19 and 21 Vinomondo as a wine tasting garden.

    Granted Full applications 19 docs
  • 21 High Street Conwy LL32 8DE

    0/51679 Submitted 9 May 2024 6m away

    Demolition of a poor quality single storey extension and re-construction of a single storey extension to provide a larger shop floor on the ground floor. Small structural alteration works to the existing structure.

    Refused Full applications Extension Demolition 22 docs
    Small domestic
  • 9-13 High Street Conwy LL32 8DE

    0/46777 Submitted 10 Oct 2019 30m away

    Rear extension, loft conversion and internal renovations.

    Granted Full applications Extension Loft or dormer 19 docs
  • 24 High Street Conwy LL32 8DE

    0/49566 Submitted 4 Apr 2022 41m away

    To replace the existing timber shopfront in preparation for a new Clogau jewellery store.

    Granted Full applications Windows or glazing 11 docs
  • 24 High Street Conwy LL32 8DE

    0/49560 Submitted 25 Mar 2022 41m away

    New fascia sign comprising individual letters on painted timber fascia with low level halo illumination. New non-illuminated hanging sign to front elevation New letters on RH elevation of building at high level to replace existing 'Chemist' letters, comprising powder coated steel letters fixed to existing render panel.

    Granted Advertising 14 docs
  • Castle Hotel High Street Conwy LL32 8DB

    0/53050 Submitted 24 Sep 2025 48m away

    98% historically approved · decision due ~3 Feb

    New extension to rear of property. Internal alterations to link existing spaces to new extension. Alterations to W.C provisions. New Gents toilets at first floor. New openings within central hall to improve visibility between spaces. Removal of redundant external fire escape stair. Landscaping works to the rear to include new ground finishes, boundary treatments, garden structures, and planting beds, and new enclosed bin store. (Listed Building Consent)

    Awaiting decision Heritage and listed buildings Extension 32 docs

In Conwy

  • 0/52696 Granted

    Mostyn Champneys Retail Park Charlotte Road Llandudno LL30 1RY

    Variation of condition no 2 of planning approval 0/47992 (Variation of Condition 2 of Planning Permission granted under reference No. 0/42833 (Variation of Condition 1 of Planning Permission reference No. 0/38017 to allow for an extended range of goods) to allow for the sale of an extended range of comparison goods) to allow for a limited extended range of goods to be displayed and sold from unit AB thereby enabling it to be occupied by Dunelm (Soft Furnishings) Ltd

    11 Jun 2025 Full applications
  • 0/53549 Refused

    2 A Mostyn Street Llandudno LL30 2PS

    Change of use of existing use class A unit to use class A3, replacement of windows / doors and shop front (with installation of sliding hatch), installation and operation of external area comprising of table / chairs / planters, installation of external flue and ducting (to rear elevation)

    1 Jul 2026 Full applications
  • 0/53528 Refused

    Riviera 13 Arvon Avenue Llandudno LL30 2DY

    Change of use from guest house (C1) to a single dwellinghouse (C3)

    20 May 2026 Full applications
  • 0/53502 Granted

    15 Maes Rhun Tyn Y Groes Conwy LL32 8PA

    Erection of side/rear extension, with infill, part conversion of existing garage

    29 Jun 2026 Full applications
  • 0/53550 Granted

    60 Coed Coch Road Old Colwyn Colwyn Bay LL29 9UP

    Demolition of existing garage and construction of an extension and alterations to existing dwelling including removal of chimney, new windows, doors & roof and external landscaping works.

    22 Jun 2026 Full applications