Planning application
28 Oaklea Kinmel Bay Conwy LL18 5HZ
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Demolision of existing garage and erection of replacement garage
As published by the council, reference 0/43456
Application record
- Reference
- 0/43456
- Type
- Full
- Status
- Granted As published: FINAL DECISION
- Decision
- Granted As published: Approved With Conditions
- Received
- 14 Nov 2016
- Validated
- 30 Nov 2016
- Decided
- 20 Jan 2017
- Ward
- Kinmel Bay
- Parish
- Cyngor Tref Kinmel Bay & Towyn Town Council
- Decision by
- Case Officer
- Postcode
- LL18 5HZ
Timeline
Dates from the published record
-
14 Nov 2016
Received by Conwy
-
30 Nov 2016
Validated
Checked as complete and ready for consideration.
-
20 Jan 2017
Decision issued: Approved With Conditions
-
28 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Conwy granted permission on 20 January 2017, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
3 Oaklea Kinmel Bay Conwy LL18 5HZ
Proposed extension to rear of property partly retrospective
Granted Full applications Extension 14 docs -
12 Garth Clarendon Kinmel Bay Conwy LL18 5DZ
Construction of porch and garage extension
Granted Full applications Extension 10 docsSmall domestic -
Kinmel Bay Evangelical Church St Asaph Avenue Kinmel Bay LL18 5EY
84% historically approved · decision due ~14 Aug
Erection of modular portable building, internal floor area 40m2, to use as additional space for community activities.
Awaiting decision Full applications 14 docs -
6 Parc Luned Kinmel Bay LL18 5JG
Proposed second floor extension over existing single storey to create additional bedrooms
Granted Full applications Extension 22 docsSmall domestic -
Land to rear of 112 St Asaph Avenue Kinmel Bay LL18 5HA
Proposed part change of use of B8 - Storage containers to Part B1 - Light Industrial. Erection of replacement steel framed building and alterations of 2 no office buildings
Refused Full applications 21 docs -
3 Owain Glyndwr Kinmel Bay Conwy LL18 5FE
Certificate of Lawfulness for proposed conversion of the garage into a kitchen
Refused Lawful development 8 docs
Other full applications
In Conwy
-
0/53489 Granted
Bryn Hafod Llethr Gwytherin Abergele LL22 8YF
This is the resubmission of 0/52999 - Refurbishment of 3 adjoining derelict barns and conversion to ancillary family accommodation; partial demolition and rebuild of one barn on advice of structural engineer; raising a roof by 800mm to accommodate 1st floor; repointing and repair of original stonework; addition of new windows and skylights; upgrading 2 roofs finishes to slate.
-
0/53636 Granted
61 B Conway Road Colwyn Bay LL29 7LG
Variation of Condition no.2 of Planning Approval 0/52534 (PROPOSED CONVERSION OF EXISTING GARAGE/OFFICE SPACE TO ANNEX AND PROPOSAL OF A SINGLE STOREY REAR EXTENSION) to allow for changes to approved plans.
-
0/53572 Granted
Neuadd Y Plwyf Llanefydd Llanefydd Conwy LL16 5EA
Installation of a shipping container for storing equipment from the village hall
-
0/53556 Granted
Sheraton West Parade Llandudno LL30 2BD
Proposed Extensions & Alterations, and Garage Extension
-
0/53597 Granted
Welsh Assembly Government Buildings Sarn Mynach Llandudno Junction LL31 9RZ
Installation of Battery Energy Storage System (BESS) units, including associated enclosure, infrastructure and ancillary works.