Planning application
26/01052/FULL
55 Mark Lane London EC3R 7NE
Proposal
Installation of new air condenser units and new railing at the south east part of the flat roof and associated works.
As published by the council, reference 26/01052/FULL
Timeline
Dates from the published record
-
27 Jul 2026
Received by City of London
-
2 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with City of London for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/00936/FULL Awaiting decision
55 Mark Lane London EC3R 7NE
Refurishment of the entrance and principal elevation, with introduction of a new cafe use (Use Class E) in place of part of the existing loading bay, installation of a new gate to loading bay entrance and associated works.
-
26/00134/PODC Granted
47-50 Mark Lane London EC3R 5AS
Submission of the Utility Connection Requirements pursuant to Schedule 3 Paragraph 10.1 of the S106 Agreement dated 19 September 2023 (Planning Application Reference: 22/01245/FULMAJ) as amended by the Deed of Variation dated 24 March 2025 (Planning Application Reference: 24/01044/FULL).
-
26/00432/MDC Granted
47-50 Mark Lane London EC3R 5AS
Submission of details of archaeological evaluation report in accordance with the Written Scheme of Investigation pursuant to condition 10 part a & b of Planning permission 24/01044/FULL dated 25.03.2025.
-
26/00423/MDC Granted
47-50 Mark Lane London EC3R 5AS
Submission of details of Public Impact Strategy pursuant to condition 11 of Planning permission 24/01044/FULL dated 25.03.2025 wording amended via planning permission 25/01737/NMA dated 16.01.2026.
-
25/01814/MDC Granted
47-50 Mark Lane London EC3R 5AS
Submission of enlistment to the Non-Road Mobile Machinery Register pursuant to condition 24 of planning permission 22/01245/FULMAJ dated 20 September 2023, as amended by 24/01044/FULL on 25 March 2024.
-
25/01807/MDC Awaiting decision
47-50 Mark Lane London EC3R 5AS
Submission of a site survey and survey of highway and other land at the perimeter of the site indicating the proposed finished floor levels at basement and ground floor levels in relation to the existing Ordnance Datum levels of the adjoining streets and open spaces pursuant to condition 7 of planning permission 24/01044/FULL dated 25/03/2025.
Other full applications applications
In City of London
-
26/00826/FULL Granted
88 Wood Street London EC2V 7DA
Installation of a double set of doors to be formed within the existing glazed curtain wall at Level 12 roof terrace.
-
26/00797/FULL Granted
1 London Wall Place London EC2Y 5AU
Installation of three metal mechanical louvred ventilation panels at upper ground level in the Fore Street elevation of 1 London Wall Place.
-
26/00113/FULL Granted
Salters Hall Gardens St Alphage Garden London EC2
Landscaping comprising (i) replacing of soft landscaping (12sqm of lawn and 26sqm of planting bed) with 38sqm of paving; (ii) Replacement of 41sqm of gravel surface with soft landscaped area comprising high quality diverse pollinator friendly planting; (iii) Provision of 48m linear of new hedgerow.
-
26/00573/FULL Granted
International Financial Centre 25 Old Broad Street London EC2N 1HQ
Installation of a canopy to the eastern elevation of the building.
-
26/00439/FULL Granted
Wren House 15 Carter Lane London EC4V 5EY
Creation of Terraces at First and Fifth Floor Levels, Including Associated External Alterations