Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00881/LBC

47 Ludgate Hill London EC4M 7JZ

Awaiting decision City of London Listed Building Consent

Proposal

Internal works comprising the removal of the existing 'island' bar and installation of new bar along with new flooring in main bar area

As published by the council, reference 26/00881/LBC

Timeline

Dates from the published record

  1. 19 Jun 2026

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with City of London for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 25/01093/PODC Awaiting decision

    11 Pilgrim Street London EC4V 6RN

    Submission of a Cycling Promotion Plan pursuant to Schedule 3, Paragraph 7.3 of the Section 106 Agreement dated 29.07.2021 (Planning Reference 20/00870/FULL)

    6 Aug 2025 29m away
  • 20/00870/FULL Granted

    11 Pilgrim Street London EC4V 6RN

    (i) Refurbishment of the building and extension at levels 6 and 7; (ii) creation of a new plant enclosure at level 8; (iii) replacement of the office entrance; (iv) relocation of existing ground floor cafe (Class E) use and associated external alterations; (v) creation of roof terraces and associated hard and soft landscaping; (vi) provision of cycle parking and associated facilities; (vii) and other ancillary works.

    6 Nov 2020 29m away Full applications
  • 25/01420/MDC Granted

    11 Pilgrim Street London EC4V 6RN

    Submission of a post construction BREEAM assessment demonstrating that a target rating of 'Excellent' has been achieved (or such other target rating as the local planning authority may agree provided that it is satisfied all reasonable endeavours have been used to achieve an 'Excellent' rating) pursuant to condition 15 of planning permission 20/00870/FULL dated 29/07/2021.

    15 Oct 2025 29m away Conditions
  • 26/00160/FULL Awaiting decision

    Century House 5 Old Bailey London EC4M 7BA

    Works to building comprising of: (i) the removal of the existing entrance door and insertion of a new entrance door; (ii) the installation of a new entrance surround including low level uplighters; (iii) the creation of a roof terrace and associated works; (iv) the removal of louvres at roof level and the infilling with glazing and cladding; (v) the installation of lighting on the façade; (vi) and all associated works.

    2 Feb 2026 49m away Full applications
  • 26/00418/5REG Decided

    38 - 40 Ludgate Hill London EC4M 7DE

    Notification under Regulation 5 of the Electronic Communications Code (Conditions and Restrictions) Regulations 2023 (as amended) to install 2 no. antennas behind replacement louvres within the bell chamber, 1 no. GPS node to be mounted on the handrail on the north side (hidden from view) and associated ancillary development thereto.

    19 Mar 2026 55m away
  • 25/01553/LBC Awaiting decision

    79 Carter Lane London EC4V 5EP

    Retrospective replacement of an existing external timber side door within the original structural opening on the east flank wall facing Carter Court.

    10 Nov 2025 57m away Heritage and listed buildings

In City of London

  • 26/00746/LBC Granted

    Offices 4 Moorgate London EC2R 6DA

    Internal refurbishment works to communal areas of existing office building at basement and ground levels and stair and lift cores, including removal and replacement of existing glazed secondary entrance door on Moorgate; refurbishment of existing external entrances on Moorgate and King Arms Yard Entrance; installation of a condenser unit in the basement lightwell; and retrospective consent for replacement of two passenger lifts.

    21 May 2026 Heritage and listed buildings
  • 26/00490/LBC Granted

    312 Cromwell Tower Barbican London EC2Y 8NB

    Refurbishment of the existing bathroom and separate shower/WC, including replacement sanitary ware, finishes, and fittings, together with the installation of new full-height internal doors to both rooms.

    2 Apr 2026 Heritage and listed buildings
  • 26/00785/LBC Granted

    5 St Michael's Alley London EC3V 9DS

    Internal alterations at basement level of Jamaica Wine House associated with refurbishment of customer bar areas and toilets.

    29 May 2026 Heritage and listed buildings
  • 26/00621/LBC Granted

    89 Speed House Barbican London EC2Y 8AU

    Internal alterations to a fifth-floor flat within Speed House, including the partial removal of the existing non-structural outer kitchen partition wall to create open-plan between the kitchen and living room.

    28 Apr 2026 Heritage and listed buildings
  • 26/00522/LBC Granted

    The Irish Chamber 1 Guildhall Yard London EC2V 5AE

    Alterations to a Listed Building including: (i) upgrades to mechanical heating systems, (ii) upgrade to and provision of new ground floor W/C's, (iii) upgrades to electrical wiring, lighting, alarm systems, (iv) installation of L.E.D lighting to replace existing on all floor levels, (v) installation of floor boxes on Ground and First floor levels, (vi) sustainability improvements including sealant to windows (viii) installation of a replacement kitchen alongside retained existing cupboards, (ix) installation of carpet, and; (x) associated minor repairs, redecorating and removal of redundant wiring.

    13 Apr 2026 Heritage and listed buildings