Planning application
1 - 4 Great Tower Street London EC3R 5AA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of details of post Installation noise report and mounting details pursuant to condition 2 and 3 of Planning permission 25/00920/FULL dated 17.10.2025.
As published by the council, reference 26/00451/MDC
Application record
- Reference
- 26/00451/MDC
- Type
- Submission of details (Planning)
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 27 Mar 2026
- Validated
- 27 Mar 2026
- Decided
- 29 May 2026
- Ward
- Billingsgate
- Decision by
- Delegated
- Postcode
- EC3R 5AA
Timeline
Dates from the published record
-
27 Mar 2026
Received by City of London
-
29 May 2026
Decision issued: Approved
-
24 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: 25/00920/FULL (Decided)
Who's behind it
Company information only, from the register and Companies House
Carter Jonas LLP Agent
899 applications on PlanIndex · across 132 councils · 89% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordRAPCO (Nominees) Limited Applicant, registered in London
Active · incorporated 1992 · London
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
- OFFICER'S REPORT
- APPROVAL OF SUBMISSION OF DETAILS
- APPLICATIONFORMREDACTED
- PICTURE OF GREAT TOWER STREET CONDENSERS WITH MOUNTINGS INSTALLED (CONDITION 3)
- PRODUCT SPECIFICATION SHEET FOR THE MOUNTINGS (CONDITION 3)
- SOUND TEST REPORT (POST WORKS) (CONDITION 2)
- SOUND TEST REPORT (PRE WORKS) (CONDITION 2)
- COVERING LETTER - CONDITION 2 AND 3 DISCHARGE
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 29 May 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
1 Great Tower Street London EC3R 5AA
Display of internally illuminated building number letterings above entrance door to office reception measuring 0.5m high, 1.2m wide and a depth of 0.015m, displayed at a height of 3.1m above ground floor level.
Granted Advertising 8 docs -
1 Great Tower Street London EC3R 5AA
Installation of a new automated entrance door and associated vestibule to the main office entry point.
Granted Full applications 11 docs -
5 - 10 Great Tower Street London EC3R 5AA
100% historically approved · decision due ~7 Jul
Submission of discreet street lighting details pursuant to discharge of condition 26 of planning permission: 23/01254/FULMAJ dated 05.06.2024.
Awaiting decision Conditions 8 docs -
5 - 10 Great Tower Street London EC3R 5AA
99% historically approved · decision due ~5 Jun
Submission of a Local Training, Skills and Job Brokerage Strategy - End Use - pursuant to Schedule 3, Paragraph 3.5 of the S106 Agreement dated 04.06.2024, associated with planning permission 23/01254/FULMAJ
Awaiting decision 2 docs -
The Derby London City 5 - 10 Great Tower Street London EC3R 5AA
External alterations including partial demolition and erection of a roof extension with associated change of use of existing building from office use (Class E) to hotel with ancillary uses (Class C1) including; new plant at roof level; provision of cycle storage; greening and other ancillary work.
Granted Full applications Extension Demolition 140 docsMajor scheme -
5 - 10 Great Tower Street London EC3R 5AA
100% historically approved · decision due ~18 Apr
Submission of particulars and samples pursuant to partial discharge of condition 34(a) of planning permission: 23/01254/FULMAJ dated 05.06.2024.
Awaiting decision Conditions 5 docs
Other condition discharge and variation applications
In City of London
-
26/00641/MDC Granted
Development Site Salisbury Square London
Submission of Construction Local Procurement Monitoring pursuant to the partial discharge of Condition 2(B) and Court Building Details pursuant to the partial discharge of Condition 37 parts (c), (e), (f), (i), (j) and (l) of Planning Permission 20/00997/FULEIA dated 30.07.2021.
-
25/01807/MDC Granted
47-50 Mark Lane London EC3R 5AS
Submission of a site survey and survey of highway and other land at the perimeter of the site indicating the proposed finished floor levels at basement and ground floor levels in relation to the existing Ordnance Datum levels of the adjoining streets and open spaces pursuant to condition 7 of planning permission 24/01044/FULL dated 25/03/2025.
-
26/00622/MDC Granted
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of details of external facing materials pursuant to part discharge of Parts E and K and full discharge of Parts F and H of Condition 21 of planning permission 26/00244/FULL dated 24th June 2026
-
26/00048/MDC Granted
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details of the position and size of the green/blue roof(s), the type of planting and a substantial contribution of the green/blue roof(s) to biodiversity and rainwater attenuation pursuant to condition 11 of planning permission 22/00202/FULMAJ dated 23/01/2023.
-
26/00138/MDC Granted
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details generator technical report pursuant to condition 20 of Planning Permission 22/00202/FULMAJ dated 23.01.2023.