Planning application
Alban Gate 125 - 130 London Wall London EC2
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of details of Biodiverse Roofing Report pursuant to condition 3 of Planning permission 24/01367/FULL dated 30.05.2025.
As published by the council, reference 26/00395/MDC
Application record
- Reference
- 26/00395/MDC
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 18 Mar 2026
- Validated
- 18 Mar 2026
- Decided
- 16 Jul 2026
- Ward
- Bassishaw
- Decision by
- Delegated
Site history
Applications at this address on the City of London register
This site has had 13 applications since 2023: 13 approved, 0 refused.
-
25/01639/MDC Granted
Alban Gate 125 - 130 London Wall London EC2
Submission of details of external signage pursuant to condition 8 (part F in part) of planning permission 23/01115/FULL dated 21/06/2024 (partial discharge).
-
25/01623/MDC Granted
Alban Gate 125 - 130 London Wall London EC2
Submission of details of the existing Barbican Wayfinding Board at podium level and its removal prior to demolition, safe storage for the duration of building works, reinstatement and retention as part of the new feature wall at podium level in accordance with detailed specifications including fixing details pursuant to condition 12 of planning permission 23/01115/FULL dated 21/06/2024.
-
25/01572/NMA Granted
Alban Gate 125 - 130 London Wall London EC2
Non material amendments under section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission ref 23/01115/FULL (dated 21/06/2024) to amend Condition 13 (approved drawings) comprising the omission of the ground floor soffit treatment.
-
25/01152/MDC Granted
Alban Gate 125 - 130 London Wall London EC2
Submission of a Design Report (suicide prevention/lighting) pursuant to the discharge of condition 2 of planning permission 24/01367/FULL dated 30.05.2025.
-
25/00702/MDC Granted
Alban Gate 125 - 130 London Wall London EC2
Submission of details and specifications of all urban furniture, including seating, planters and refuse bins pursuant to condition 8 (part G) of planning permission 23/01115/FULL dated 21/06/2024.
-
25/00686/MDC Granted
Alban Gate 125 - 130 London Wall London EC2
Submission of details of all hard and soft landscaping to be installed, including details of a) Planting plan and schedule of species; b) Irrigation and maintenance methods; c) Planting pit size, construction, and soil; and d) Hard surface materials pursuant to condition 9 of planning permission 23/01115/FULL dated 21/06/2024.
-
24/00932/NMA Granted
Alban Gate 125 - 130 London Wall London EC2
Non material amendments under section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission ref 23/01115/FULL (dated 21/06/2024) to amend Condition 13 (approved drawings) comprising omission of new ground floor access point to escalators from reception, repositioning of entrance doors within new extension and addition of transoms to support doors, omission of extension over escalator and omission of new South facing planter.
-
24/00931/MDC Granted
Alban Gate 125 - 130 London Wall London EC2
Submission of a scheme of protective works pursuant to condition 6 of planning permission 23/01115/FULL dated 21/06/2024.
-
24/00929/MDC Granted
Alban Gate 125 - 130 London Wall London EC2
Submission of details of safe routes across the City Walkway to be provided for the duration of the works in accordance with the 'City Walkway Phasing Plan' submitted to the City Corporation pursuant to condition 5 of planning permission 23/01115/FULL dated 21/06/2024.
-
24/00837/MDC Granted
Alban Gate 125 - 130 London Wall London EC2
Submission of a Demolition and Construction Logistics Plan to manage all freight vehicle movements to and from the site during construction of the development pursuant to condition 7 of planning permission 23/01115/FULL dated 21/06/2024.
Timeline
Dates from the published record
-
18 Mar 2026
Received by City of London
-
16 Jul 2026
Decision issued: Approved
-
24 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: 24/01367/FULL (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
- APPROVAL OF SUBMISSION OF DETAILS
- BIODIVERSE ROOFING
- CONDITION 3 ? BIODIVERSE ROOFING
- APPLICATIONFORMREDACTED
- ALBAN GATE TERRACES CONDITION 3 COVER LETTER
- BIODIVERSE ROOFING REPORT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 16 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.