Planning application
Cripplegate House 1 Golden Lane London EC1Y 0RR
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of details to discharge Condition 3 (a), (b), (c), (d), (e), (f), (g), (h), (i), (j), (k), (l), (m) of Listing Building consent 22/00203/LBC dated 23.01.2023.
As published by the council, reference 26/00100/LDC
Application record
- Reference
- 26/00100/LDC
- Type
- Submission of details (LBC/CAC)
- Status
- Decided
- Decision
- Approved
- Received
- 22 Jan 2026
- Validated
- 22 Jan 2026
- Decided
- 18 Aug 2026
- Ward
- Cripplegate
- Decision by
- Delegated
- Postcode
- EC1Y 0RR
Site history
Applications at this address on the City of London register
This site has had 34 applications since 2023: 26 approved, 0 refused.
-
26/01156/PODC Awaiting decision
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of the Final Cultural Implementation Strategy and pursuant to Schedule 3 Paragraph 14.3 of the S106 Agreement dated 23 January 2023 (Planning Application Reference: 22/00202/FULMAJ).
-
26/01006/MDC Awaiting decision
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of BREEAM Details Pack pursuant to discharge of condition 10 of planning permission 22/00202/FULMAJ dated 23.01.2023.
-
26/01007/MDC Awaiting decision
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of detail pack pursuant to discharge of condition 23 of planning permission 22/00202/FULMAJ dated 23.01.2023.
-
26/00946/PODC Granted
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of the Cycling Promotion Plan and the Delivery and Servicing Management Plan and pursuant to Schedule 3 Paragraph 7.1 and 8.1 of the S106 Agreement dated 23 January 2023 (Planning Application Reference: 22/00202/FULMAJ).
-
26/00843/MDC Awaiting decision
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details of Climate Change Resilience Statement pursuant to condition 9 of Planning Permission 22/00202/FULMAJ dated 23.01.2023.
-
26/00412/MDC Awaiting decision
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details of: particulars and samples of (i) position, size and types of planting of the green roof and its method of irrigation, (ii) final urban greening factor of the scheme, (iii) irrigation, including provision for harvesting rainwater (iv) soil including details of the type and depths of soil and substrates (v) planting pit size and construction, tree guards (vi) all soft landscaping including species and contribution to enhance biodiversity, (vii) Seating (viii) paving materials (ix) maintenance plans for all proposed landscaping (x) planters, (xi) vertical greening including species and (xii) contribution to biodiversity enhancement of all landscaping pursuant to condition 37 a, b, c, d, f, g, h, i, j, k ,l, m of Planning Permission 22/00202/FULMAJ dated 23.01.2023.
-
26/00415/MDC Granted
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details of rooftop plant pursuant to condition 48 of Planning Permission ref. 22/00202/FULMAJ (as amended under S96a ref. 23/00750/NMA).
-
26/00403/LDC Granted
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details of rooftop plant pursuant to condition 6 of Listed Building Consent ref. 22/00203/LBC (as amended by S19 ref. 23/00746/LBC dated 08.09.2023) dated 23.01.2023.
-
26/00163/MDC Awaiting decision
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details of: particulars and samples (i) lighting layout (ii) functional and decorative luminaires (iii) lighting control methodology (iv) proposed operational timings and associated design (v) external, semi-external and public-facing parts of the building etc (vi) details for impact on the public realm, including typical illuminance levels pursuant to condition 34 of Planning Permission 22/00202/FULMAJ dated 23.01.2023.
-
26/00139/LDC Granted
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details of proposed art screen pursuant to condition 3(o) of Listed Building Consent 22/00203/LBC, dated 23 January 2023, as amended by 25/00824/LBC on 04 December 2025.
Timeline
Dates from the published record
-
22 Jan 2026
Received by City of London
-
24 Jul 2026
Added to PlanIndex
-
18 Aug 2026
Decision issued: Approved
Related applications
Cases linked to this one on the register
- Application: 22/00203/LBC (Decided)
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,250 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordAvasha Ltd Applicant, registered in Douglas
Registered · incorporated 2023 · Douglas
16 applications on PlanIndex · 100% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
470 documents on file for this application
- APPROVAL OF SUBMISSION OF DETAILS
- FACADE PLANTER TYPICAL DETAIL- WEST FAÇADE (LEVEL 10)
- FACADE PLANTER TYPICAL DETAIL- WEST AND NORTH FACADE
- LEVEL 04 PLANTING PLAN (SHEET 1 OF 2)
- ANDSCAPE LAYOUT- LEVEL 04
- LEVEL 02 PLANTING PLAN (SHEET 2 OF 2)
- ASFD ELEVATIONS
- VIEW 04_PHASE 2_220901_REVA
- VIEW 02_PHASE 2_220901_REVA
- VIEW 01_PHASE 2_220901
- 1GL_GRAPHICS&SIGNAGE_STAGE4_TENDERISSUE_REVISION_2.5 42
- 1GL_GRAPHICS&SIGNAGE_STAGE4_TENDERISSUE_REVISION_2.5 41
- ADVERTISEMENT CONSENT REPORT
- LEVEL 08 PLANTING PLAN (SHEET 4 OF 4)
- LEVEL 06 PLANTING PLAN (SHEET 1 OF 2)
- LANDSCAPE LAYOUT- LEVEL 06
- LEVEL 04 PLANTING PLAN (SHEET 2 OF 2)
- PROPOSED WEST ELEVATION
- PROPOSED EAST ELEVATION
- PROPOSED SOUTH ELEVATION
- LEVEL 02 PLANTING PLAN (SHEET 1 OF 2)
- LANDSCAPE LAYOUT- LEVEL 02
- PLANTER TYPICAL DETAILS - GF PUBLIC REALM (INCLUDING STRAINING WIRE TO SOUTH FAÇ
- PLANTING PLAN GF PUBLIC REALM (SHEET 3 OF 3)
- PROPOSED NORTH ELEVATION
- 1GL_GRAPHICS&SIGNAGE_STAGE4_TENDERISSUE_REVISION_2.5 46
- LANDSCAPE SPECIFICATION ? EXTERIOR
- LEVEL 12 PLANTING PLAN (SHEET 4 OF 4)
- LEVEL 08 PLANTING PLAN (SHEET 1 OF 4)
- LEVEL 06 PLANTING PLAN (SHEET 2 OF 2)
- LEVEL 12 PLANTING PLAN (SHEET 3 OF 4)
- LEVEL 12 PLANTING PLAN (SHEET 2 OF 4)
- LEVEL 12 PLANTING PLAN (SHEET 1 OF 4)
- LANDSCAPE LAYOUT- LEVEL 12
- LEVEL 10 PLANTING PLAN (SHEET 3 OF 3)
- LEVEL 10 PLANTING PLAN (SHEET 2 OF 3)
- LEVEL 10 PLANTING PLAN (SHEET 1 OF 3)
- NDSCAPE LAYOUT- LEVEL 10
- LEVEL 08 PLANTING PLAN (SHEET 3 OF 4)
- LEVEL 08 PLANTING PLAN (SHEET 2 OF 4)
- NDSCAPE LAYOUT- LEVEL 08
- BBS-511 PARTIAL FLOORPLAN L 10
- BBS-511 PARTIAL FLOORPLAN L 08
- PARTIAL PLAN, SECTION & ELEVATION
- UCW-112 HORIZONTAL SECTION
- UCW-112 HORIZONTAL SECTION
- UCW-112 HORIZONTAL SECTION
- UCW-112 HORIZONTAL SECTION
- UCW-112 HORIZONTAL SECTION
- BBS-511 PARTIAL FLOORPLAN L 12
- UCW-112 PARTIAL ELEVATION
- FLOORPLAN LEVEL 07
- UCW-112 HORIZONTAL SECTION
- UCW-111 END HORIZONTAL SECTION
- UCW-111 END HORIZONTAL SECTION
- UCW-111 END HORIZONTAL SECTION
- UCW-111 END HORIZONTAL SECTION
- VMU-2 SCW-311 PARTIAL PLAN, SECTION & ELEVATION
- UCW-112 HORIZONTAL SECTION
- UCW-111 / UCW-112 / CRS-621 FACADE OVERALL ELEVATION SOUTH
- FLOORPLAN LEVEL 06
- FLOORPLAN LEVEL 05
- FLOORPLAN LEVEL 04
- FLOORPLAN LEVEL 03
- FLOORPLAN LEVEL 02
- BBS-511 LEVEL 12 H-SECTION CORNER 108°
- BBS-511 LEVEL 10 H-SECTION CORNER
- BBS-511 LEVEL 10 H-SECTION
- BBS-511 LEVEL 08 H-SECTION
- BBS-511 LEVEL 08 H-SECTION
- BBS-511 LEVEL 08 H-SECTION CORNER
- BBS-511 LEVEL 08 H-SECTION CORNER
- BBS-511 HORIZONTAL SECTION
- SCW-341 HORIZONTAL SECTION
- SCW-311 HORIZONTAL SECTION GL-C/1
- SCW-311 HORIZONTAL SECTION GL-B/1,X
- SCW-311 HORIZONTAL SECTION GL-E/1
- SCW-311 HORIZONTAL SECTION GL-X/M
- SFS-441, MANSARD ROOF HORIZONTAL SECTION
- SFS-431& 441, MANSARD GABLE HORIZONTAL SECTION DETAIL
- SFS-431, MANSARD WALL HORIZONTAL SECTION
- SFS-431, MANSARD WALL HORIZONTAL SECTION
- SFS-411, L10 HORIZONTAL SECTION LOUVRE
- SFS-411 HORIZONTAL SECTION
- SFS-411 HORIZONTAL SECTION
- SFS-411 HORIZONTAL SECTION
- SFS-411 HORIZONTAL SECTION
- SCW-341 HORIZONTAL SECTION
- SCW-341 HORIZONTAL SECTION
- SCW-311 HORIZONTAL SECTION GL-X/M
- BBS-511 LEVEL 12 H-SECTION CORNER 72°
- BBS-511 LEVEL 10 H-SECTION CORNER
- BBS-511 LEVEL 10 H-SECTION
- SCW-341 HORIZONTAL SECTION
- CRS-661 VERTICAL SECTION
- CRS-661 VERTICAL SECTION
- CRS-611/SCS-711 VERTICAL SECTION GL-A/14
- BBS-511 LEVEL 12 VERTICAL SECTION
- BBS-511 VERTICAL SECTION
- SFS-431& 441, MANSARD GABLE VERTICAL SECTION DETAIL
- SCW-341 VERTICAL SECTION
- SCW-341 VERTICAL SECTION
- SCW-311 VERTICAL SECTION GL-F-G/14
- SCW-311 VERTICAL SECTION GL-J-K/14
- SCW-311, LOUVRE VERTICAL SECTION GL-K-L/14
- SCW-311 VERTICAL SECTION GRC, GL-A/9
- SCW-311 VERTICAL SECTION GL-A/9
- UCW-112 VERTICAL SECTION
- UCW-112 VERTICAL SECTION
- CRS-671 HORIZONTAL SECTION
- HORIZONTAL SECTION
- CRS-611/SCS-711 HORIZONTAL SECTION GL-D/15
- VERTICAL SECTION
- VERTICAL SECTION
- SCW-311 VERTICAL SECTION GRC, GL-J/14
- SCW-311, LOUVRE VERTICAL SECTION GL-K-L/14
- SCW-311 VERTICAL SECTION GRC,GL-A/9
- UCW-112 VERTICAL SECTION
- UCW-111 VERTICAL SECTION
- DOS-811- H.S. TYPE C
- CRS-671 HORIZONTAL SECTION
- CRS-671 HORIZONTAL SECTION
- CRS-611/SCS-711 VERTICAL SECTION GL-D/15
- CRS-611/SCS-711 VERTICAL SECTION GL-B/15
- CRS-611/SCS-711 VERTICAL SECTION GL-B/15,14
- CRS-611/SCS-711 VERTICAL SECTION GL-H-J/15-14
- SFS-431, MANSARD WALL VERTICAL SECTION
- SFS-421 VERTICAL SECTION
- SFS-411, L10 VERTICAL SECTION LOUVRE
- SCW-311 VERTICAL SECTION GL-J-K/14
- CRS-661 HORIZONTAL SECTION
- CRS-661 HORIZONTAL SECTION
- CRS-611/SCS-711 HORIZONTAL SECTION GL-B/15
- CRS-611/SCS-711 HORIZONTAL SECTION GL-A/15
- CRS-611/SCS-711 HORIZONTAL SECTION GL-D/15
- VIEW 1
- VIEW 2
- VIEW 4
- SOIL SPEC 4
- SOIL SPEC 3
- SOIL SPEC 2
- SOIL SPEC 1
- LANDSCAPE SPECIFICATION ? EXTERIOR
- PLANTER COMBUSTIBILITY TECHNICAL NOTE
- STAGE 4 FACADE ACCESS AND MAINTENANCE STRATEGY
- SCW-331 HORIZONTAL SECTION
- SCW-331 PARTIAL ELEVATION
- SCW-341 PARTIAL ELEVATION
- SCW-341 HORIZONTAL SECTION
- SFS-411 VERTICAL SECTION
- SFS-411 VERTICAL SECTION
- SFS-411 VERTICAL SECTION
- SFS-411 VERTICAL SECTION
- SFS-411 VERTICAL SECTION
- UCW-111 VERTICAL SECTION
- UCW-111 VERTICAL SECTION
- UCW-111 VERTICAL SECTION
- UCW-111 VERTICAL SECTION
- SCW-331 VERTICAL SECTION
- SCW-331 HORIZONTAL SECTION
- SCW-331 HORIZONTAL SECTION
- SCW-331 / SFS-411 / CRS-631 FACADE OVERALL ELEVATION EAST
- SFS-411 VERTICAL SECTION
- SFS-411 VERTICAL SECTION
- SFS-411 VERTICAL SECTION
- SFS-411 HORIZONTAL SECTION
- SFS-411 PARTIAL ELEVATION
- SFS-431 & 441, MANSARD PARTIAL ELEVATION
- SFS-431, MANSARD WALL HORIZONTAL SECTION
- SFS-431, MANSARD WALL HORIZONTAL SECTION
- SFS-431, MANSARD WALL HORIZONTAL SECTION
- SFS-431, MANSARD WALL HORIZONTAL SECTION
- SFS-431, MANSARD WALL VERTICAL SECTION
- SFS-431, MANSARD WALL VERTICAL SECTION
- SFS-431, MANSARD WALL VERTICAL SECTION
- SCW-331 VERTICAL SECTION
- SCW-331 HORIZONTAL SECTION
- SCW-331 HORIZONTAL SECTION
- SCW-331 HORIZONTAL SECTION
- SCW-331 VERTICAL SECTION
- SCW-331 VERTICAL SECTION
- SCW-331 VERTICAL SECTION
- SCW-331 HORIZONTAL SECTION
- SCW-341 / CRS-671 / SFS-421 / CRS-661 FACADE OVERALL ELEVATION
- CRS-651 PARTIAL ELEVATION
- SFS-431, MANSARD WALL VERTICAL SECTION
- SFS-431, MANSARD WALL VERTICAL SECTION
- SFS-431, MANSARD WALL VERTICAL SECTION
- SFS-431& 441, MANSARD WALL VERTICAL SECTION
- UCW-111 PARTIAL ELEVATION
- UCW-111 HORIZONTAL SECTION
- UCW-111 HORIZONTAL SECTION
- CRS-631 VERTICAL SECTION
- VERTICAL SECTION
- PARTIAL FLOORPLAN
- CRS-631 VERTICAL SECTION
- CRS-631 VERTICAL SECTION
- SFS-411 HORIZONTAL SECTION
- SFS-411 PARTIAL ELEVATION
- UCW-111 / UCW-112 / CRS-621 FACADE OVERALL ELEVATION WEST
- UCW-111 HORIZONTAL SECTION
- UCW-111 HORIZONTAL SECTION
- UCW-111 HORIZONTAL SECTION
- UCW-111 HORIZONTAL SECTION
- UCW-111 HORIZONTAL SECTION
- UCW-111 VERTICAL SECTION
- CRS-631 VERTICAL SECTION
- HORIZONTAL SECTION
- HORIZONTAL SECTION
- CORNER HORIZONTAL SECTION
- CORNER HORIZONTAL SECTION
- CORNER HORIZONTAL SECTION
- CORNER HORIZONTAL SECTION
- HORIZONTAL SECTION
- HORIZONTAL SECTION
- HORIZONTAL SECTION
- HORIZONTAL SECTION
- HORIZONTAL SECTION
- PARTIAL ELEVATION
- CRS-631 VERTICAL SECTION
- VERTICAL SECTION
- CRS-631 VERTICAL SECTION
- SCW-331 VERTICAL SECTION
- SCW-331 VERTICAL SECTION
- SCW-311 VERTICAL SECTION GL-A/1
- CRS-621 PARTIAL ELEVATION
- CRS-621 VERTICAL SECTION
- VERTICAL SECTION
- PARTIAL ELEVATION
- HORIZONTAL SECTION
- HORIZONTAL SECTION
- HORIZONTAL SECTION
- HORIZONTAL SECTION
- HORIZONTAL SECTION
- CORNER HORIZONTAL SECTION
- CORNER HORIZONTAL SECTION
- CORNER HORIZONTAL SECTION
- CRS-641 PARTIAL SECTION
- CRS-641 PARTIAL SECTION
- CRS-641 VERTICAL SECTION
- CRS-641 VERTICAL SECTION
- CRS-641 VERTICAL SECTION
- SCW-311 HORIZONTAL SECTION GL-A/9
- SCW-311 HORIZONTAL SECTION GL-A/1
- SCW-311 VERTICAL SECTION GL-A/9
- SCW-311 VERTICAL SECTION GL-A/9
- SCW-311 VERTICAL SECTION GRC, GL-A/9
- SCW-311 VERTICAL SECTION GRC,GL-A/9
- SCW-321 VERTICAL SECTION
- SCW-321 VERTICAL SECTION
- SCW-321 HORIZONTAL SECTION
- SCW-321 HORIZONTAL SECTION
- SCW-321 HORIZONTAL SECTION
- CRS-691 VERTICAL SECTION
- CRS-691 HORIZONTAL SECTION
- CRS-691 HORIZONTAL SECTION
- CRS-621 HORIZONTAL SECTION
- CORNER HORIZONTAL SECTION
- HORIZONTAL SECTION
- HORIZONTAL SECTION
- VERTICAL SECTION
- VERTICAL SECTION
- VERTICAL SECTION
- VERTICAL SECTION
- CRS-671 PARTIAL PLAN
- CRS-671 HORIZONTAL SECTION
- CRS-671 VERTICAL SECTION
- CRS-641 HORIZONTAL SECTION
- CRS-681 HORIZONTAL SECTION
- CRS-681 HORIZONTAL SECTION
- CRS-681 HORIZONTAL SECTION
- CRS-681 HORIZONTAL SECTION
- CRS-681 VERTICAL SECTION
- CRS-691 VERTICAL SECTIO
- CRS-691 VERTICAL SECTION
- CRS-691 VERTICAL SECTION
- CRS-691 PARTIAL ELEVATION
- SCW-311 HORIZONTAL SECTION GL-A/14
- SCW-311 HORIZONTAL SECTION GL-A/1
- SCW-311 VERTICAL SECTION GL-A/7
- SCW-311 VERTICAL SECTION GL-A/4
- SCW-311 VERTICAL SECTION GL-A/4
- SCW-311 VERTICAL SECTION GL-A/1
- SCW-321 VERTICAL SECTION
- SCW-321 VERTICAL SECTION
- SCW-321 HORIZONTAL SECTION
- SCW-321 PARTIAL ELEVATION
- SCW-321 / CRS-681 / CRS-691 / CRS-641 FACADE OVERALL ELEVATION
- CRS-691 VERTICAL SECTION
- SCW-331 / SFS-411 / CRS-631 FACADE OVERALL ELEVATION NORTH
- SCW-311 VERTICAL SECTION GL-X/T
- SCW-311 VERTICAL SECTION GL-X/T
- SCW-311 VERTICAL SECTION GL-X/J
- SCW-311 VERTICAL SECTION GL-X/U
- SCW-311 VERTICAL SECTION GL-C,D/1
- SCW-321 VERTICAL SECTION
- SCW-321 VERTICAL SECTION
- SCW-321 VERTICAL SECTION
- SFS-421 PARTIAL ELEVATION
- SFS-421 HORIZONTAL SECTION
- UCW-111 HORIZONTAL SECTION
- UCW-111 HORIZONTAL SECTION
- UCW-111 HORIZONTAL SECTION
- UCW-111 HORIZONTAL SECTION
- UCW-111 HORIZONTAL SECTION
- UCW-111 / UCW-112 / CRS-621 FACADE OVERALL ELEVATION NORTH
- CRS-691 PARTIAL ELEVATION
- CRS-691 HORIZONTAL SECTION
- CRS-691 HORIZONTAL SECTION
- CRS-691 VERTICAL SECTION
- CRS-691 VERTICAL SECTION
- CRS-691 VERTICAL SECTION
- SCW-331 PARTIAL ELEVATION
- SCW-311 HORIZONTAL SECTION GL-X/M
- SCW-311 HORIZONTAL SECTION GL-X/M
- SCW-311 HORIZONTAL SECTION GL-E/1
- SCW-311 HORIZONTAL SECTION GL-B/1,X
- SCW-311 HORIZONTAL SECTION GL-C/1
- SCW-321 VERTICAL SECTION
- SCW-321 HORIZONTAL SECTION
- SCW-321 HORIZONTAL SECTION
- SCW-321 PARTIAL ELEVATION
- SCW-321 / CRS-681 / CRS-691 / CRS-641 FACADE OVERALL ELEVATION
- SCW-331 / SFS-411 / CRS-631 FACADE OVERALL ELEVATION NORTH
- SFS-411 VERTICAL SECTION
- SFS-411 VERTICAL SECTION
- SFS-411 VERTICAL SECTION
- SFS-411 VERTICAL SECTION
- SFS-411 VERTICAL SECTION
- SFS-411 HORIZONTAL SECTION
- SCW-331 VERTICAL SECTION
- SCW-331 VERTICAL SECTION
- SCW-331 VERTICAL SECTION
- SCW-331 VERTICAL SECTION
- SCW-331 HORIZONTAL SECTION
- SCW-331 HORIZONTAL SECTION
- SCW-311 VERTICAL SECTION GL-C,D/X
- SCW-311 VERTICAL SECTION GL-C,D/1
- SFS-411 PARTIAL ELEVATION
- SCW-331 / SFS-411 / CRS-631 FACADE OVERALL ELEVATION NORTH
- SFS-421 HORIZONTAL SECTION
- SFS-431, MANSARD WALL HORIZONTAL SECTION
- SFS-431 & 441, MANSARD PARTIAL ELEVATION
- UCW-111 VERTICAL SECTION
- UCW-111 VERTICAL SECTION
- UCW-111 VERTICAL SECTION
- UCW-111 VERTICAL SECTION
- UCW-111 VERTICAL SECTION
- UCW-111 HORIZONTAL SECTION
- UCW-111 HORIZONTAL SECTION
- CRS-621 (V-SECTION) C01
- CRS-621 (H-SECTION) C01
- CRS-621 (H-SECTION) C01
- CRS-621 (H-SECTION) C01
- CRS-621 (H-SECTION) C01
- CRS-621 (H-SECTION) C01
- CRS-621 FLOORPLAN LEVEL 08 C01
- CRS-641 (H-SECTION) C01
- CRS-641 (H-SECTION) C01
- CRS-641 (V-SECTION) C01
- CRS-641 (V-SECTION) C01
- CRS-661 (PARTIAL ELEVATION) P01
- CRS-681 (V-SECTION) C01
- CRS-681 (H-SECTION) C01
- CRS-621 FLOORPLAN LEVEL 08 C01
- CRS-631 (V-SECTION) C01
- CRS-631 (V-SECTION) C01
- CRS-631 (H-SECTION) C01
- CRS-641 (PARTIAL ELEVATION) C01
- CRS-671,661 (NORTH ELEVATION) C01
- CRS-671 (H-SECTION) C01
- CRS-671 (H-SECTION) C01
- CRS-641 (V-SECTION) C01
- SCW-331 (NORTH ELEVATION) C01
- SCW-321 / CRS-681 / CRS-691 / CRS-641 FACADE OVERALL ELEVATION
- DOS-811, L00 DRS-106 ? SCW-311 C01
- DOS-811, L00 DRS-106 ? SCW-311 C01
- DOS-811, L00 DRS-109A ? SCW-311 C01
- DOS-811, L00 DRS-109A ? SCW-311 C01
- DOS-811, L08 DRS-109B ? SCW-321 C01
- DOS-811, L10 DRS-109B ? SCW-331 C01
- DOS-811, L12 DRS-109A ? SCW-341 C01
- DOS-811, L12 DRS-110C ? SCW-421 C01
- DOS-811 ? ELEVATION TYPE A C01
- DOS-811 ? ELEVATION TYPE B C01
- DOS-811 ? ELEVATION TYPE C C01
- DOS-811 ? ELEVATION TYPE D C01
- 360° CURVED SLIDING DOOR ? ELEVATION & PLAN C01
- 360° CURVED SLIDING DOOR ? HORIZONTAL SECTIONS C01
- DOS-811 ? H.S. TYPE C C01
- DOS-811 -V.S. TYPE D
- SCW-331 (H-SECTION) C01
- SCW-331 (H-SECTION) C01
- SCW-331 (H-SECTION) C01
- SCW-331 (H-SECTION) C01
- SCW-331 (V-SECTION) C01
- SCW-331 (V-SECTION) C01
- SCW-331 (V-SECTION) C01
- SCW-331 (V-SECTION) C01
- SCW-331 (V-SECTION) C01
- HERITAGE WINDOWS SCOPE ELEVATION
- TYPICAL HERITAGE WINDOWS
- GROUND FLOOR BACKPAINTED GLASS
- GROUND FLOOR MANIFESTATION PATTERN
- GROUND FLOOR MANIFESTATION LOCATIONS
- PROPOSED WESTELEVATION-VISCOUNTSTREET
- INTEGRATEDSIGNAGEREPORTPURSUANTTOCONDITION39
- DOS-811 ? V.S. TYPE D C01
- DOS-811 ? V.S. TYPE C C01
- MANSARD WINDOWS
- MANSARD WINDOWS
- PROPOSED NORTHELEVATION-BRACKLEYSTREET
- 360° CURVED SLIDING DOOR ? VERTICAL SECTIONS C01
- DOS-811 ? H.S. TYPE D C01
- DOS-811, L12 DRS-112 ? LIFT & SLIDING DOOR C01
- DOS-811 ? V.S. TYPE C C01
- DRAWING LIST_FINAL
- 2_2321_GOLDEN LANE CONDITION 3E
- 3_2321_GOLDEN LANE CONDITION 3E
- 4_2321_GOLDEN LANE CONDITION 3E
- 5_2321_GOLDEN LANE CONDITION 3E
- 6_2321_GOLDEN LANE CONDITION 3E
- 7_2321_GOLDEN LANE CONDITION 3E
- 2321_GOLDEN LANE CONDITION 3G-1-1
- 2321_GOLDEN LANE CONDITION 3G-1-2
- 2321_GOLDEN LANE CONDITION 3G-2-1
- 2321_GOLDEN LANE CONDITION 3G-2-2
- 2321_GOLDEN LANE CONDITION 3G-3-1
- 2321_GOLDEN LANE CONDITION 3G-3-2
- 2321_GOLDEN LANE CONDITION 3G-4
- 2321_GOLDEN LANE CONDITION 3H-1
- 2321_GOLDEN LANE CONDITION 3H-2
- 2321_GOLDEN LANE CONDITION 3H-3
- 2321_GOLDEN LANE CONDITION 3M-1
- 2321_GOLDEN LANE CONDITION 3M-2
- 2321_GOLDEN LANE CONDITION 3M-3-1-3
- 2321_GOLDEN LANE CONDITION 3M-3-4-5
- 2321_GOLDEN LANE CONDITION 3M-3-6
- 2321_GOLDEN LANE CONDITION 3M-3-7
- 2321_GOLDEN LANE CONDITION 3M-3-8-10
- 2321_GOLDEN LANE CONDITION 3M-4
- 2321_GOLDEN LANE CONDITION 3M-5
- 2321_GOLDEN LANE CONDITION 3M-6
- 2321_GOLDEN LANE CONDITION 3I
- 2321_GOLDEN LANE CONDITION 3B-5
- APPLICATIONFORMREDACTED
- 2321_GOLDEN LANE CONDITION 3K
- 2321_GOLDEN LANE CONDITION 3C
- 2321_GOLDEN LANE CONDITION 3D
- 2321_GOLDEN LANE CONDITION 3J
- 2321_GOLDEN LANE CONDITION 3B-2-3
- 2321_GOLDEN LANE CONDITION 3B-2-4
- 2321_GOLDEN LANE CONDITION 3B-2-5
- 2321_GOLDEN LANE CONDITION 3B-2-6
- 1 GOLDEN LANE CONDITION 3 (LBC) COVER LETTER
- 2321_GOLDEN LANE CONDITION 3B-2-7
- 2321_GOLDEN LANE CONDITION 3B-2-8
- 2321_GOLDEN LANE CONDITION 3B-2-9
- 2321_GOLDEN LANE CONDITION 3B-2-10
- 2321_GOLDEN LANE CONDITION 3B-3
- 2321_GOLDEN LANE CONDITION 3B-4
- 2321_GOLDEN LANE CONDITION 3B-6
- 2321_GOLDEN LANE CONDITION 3B-7
- 2321_GOLDEN LANE CONDITION 3B-8
- 2321_GOLDEN LANE CONDITION 3B-9
- 2321_GOLDEN LANE CONDITION 3B-10
- 2321_GOLDEN LANE CONDITION 3B-1
- 2321_GOLDEN LANE CONDITION 3B-2-1
- 2321_GOLDEN LANE CONDITION 3B-2-2
- 1_2321_GOLDEN LANE CONDITION 3E
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 18 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Cripplegate House 1 Golden Lane London EC1Y 0RR
Application for a non-material amendment of planning permission ref. 22/00202/FULMAJ relating to the development at 1 Golden Lane to: (i) add a requirement to submit details for the proposed art screen.
Granted Amendments 8 docs -
Cripplegate House 1 Golden Lane London EC1Y 0RR
100% historically approved · decision due ~18 May
Submission of details of: particulars and samples of (i) position, size and types of planting of the green roof and its method of irrigation, (ii) final urban greening factor of the scheme, (iii) irrigation, including provision for harvesting rainwater (iv) soil including details of the type and depths of soil and substrates (v) planting pit size and construction, tree guards (vi) all soft landscaping including species and contribution to enhance biodiversity, (vii) Seating (viii) paving materials (ix) maintenance plans for all proposed landscaping (x) planters, (xi) vertical greening including species and (xii) contribution to biodiversity enhancement of all landscaping pursuant to condition 37 a, b, c, d, f, g, h, i, j, k ,l, m of Planning Permission 22/00202/FULMAJ dated 23.01.2023.
Awaiting decision Conditions Trees 48 docs -
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details of rooftop plant pursuant to condition 48 of Planning Permission ref. 22/00202/FULMAJ (as amended under S96a ref. 23/00750/NMA).
Granted Conditions 14 docs -
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details of rooftop plant pursuant to condition 6 of Listed Building Consent ref. 22/00203/LBC (as amended by S19 ref. 23/00746/LBC dated 08.09.2023) dated 23.01.2023.
Granted Lawful development 15 docs -
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of details of layout and arrangement of cycle parking pursuant to condition 17 of planning permission 22/00202/FULMAJ dated 23.01.2023.
Granted Conditions 5 docs -
Cripplegate House 1 Golden Lane London EC1Y 0RR
Submission of a Noise, Vibration and Dust Monitoring Plan and Construction Environmental Management Plan pursuant to Condition 24 of planning permission 22/00202/FULMAJ (dated 23.01.2023).
Granted Conditions 14 docs
Other lawful development applications
In City of London
-
26/01191/LDC Granted
The Baltic Exchange 38 St Mary Axe London EC3A 8EX
Submission of drawings pursuant to discharge of condition 3(j) of planning permission 25/00838/LBC dated 10/11/2025
-
26/01240/LDC Awaiting decision
North Wing St Bartholomews Hospital West Smithfield London EC1A 7BE
Submission of details of masonry and joinery repairs pursuant to condition 3 of Listed Building Consent 25/00756/LBC (dated 19.08.2025).
-
26/00673/LDC Granted
1-5 London Wall Buildings London Wall London EC2M 5PG
Submission of details of the repair and restoration of the external basement areas on Finsbury Circus and Circus Place pursuant to condition 4(r) of Listed Building Consent 25/00628/LBC dated 23.07.2025.
-
26/00674/LDC Granted
1-5 London Wall Buildings London Wall London EC2M 5PG
Submission of details of the reinstated war memorial plaque pursuant to condition 4(q) of Listed Building Consent 25/00628/LBC dated 23.07.2025.
-
26/01073/LDC Granted
Park House 16 Finsbury Circus London EC2M 7EB
Submission of dropped ceiling bulkheads around windows pursuant to condition 2 of planning permission 26/00516/LBC dated 05/06/2026