Skip to content
PlanIndex Get alerts
Menu

Planning application

Snow Hill Police Station 5 Snow Hill London EC1A 2DP

Awaiting decision City of London 25/01302/LBC Listed Building Consent

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application under Section 19 of the Planning (Listed Building and Conservation Areas) Act 1990 to remove Condition 14 (relating to the retention and reinstatement of the police lamp) and vary Condition 15 (approved drawings to replace first floor east window) of Listed Building Consent Reference 22/00743/LBC.

As published by the council, reference 25/01302/LBC

Application record

Reference
25/01302/LBC
Type
Listed Building Consent
Status
Under Consideration
Received
23 Sep 2025
Validated
17 Oct 2025
Ward
Farringdon Without
Decision by
Delegated
Postcode
EC1A 2DP

Site history

Applications at this address on the City of London register

This site has had 37 applications since 2022: 30 approved, 0 refused.

  • 26/00958/MDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of BREEAM New Construction Final Certificate pursuant to discharge of condition 32 of planning permission 22/00742/FULL dated 10.03.2023.

    Decided 13 Aug 2026
  • 26/00483/MDC Awaiting decision

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of Post-Completion Survey Note pursuant to condition 63 of Planning permission 22/00742/FULL dated 13.03.2023.

    Submitted 2 Apr 2026 Conditions
  • 26/00420/LDC Awaiting decision

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of post completion survey pursuant to condition 10 of Listed Building Consent 25/01302/LBC dated 06.02.2026.

    Submitted 23 Mar 2026 Lawful development
  • 26/00401/LDC Awaiting decision

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of Internal Strip Out Schedule pursuant to condition 7 of Listed Building Consent 25/01302/LBC dated 06.02.2026.

    Submitted 19 Mar 2026 Lawful development
  • 26/00262/MDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of Climate Change Resilience and Sustainability Report pursuant to condition 41 of planning permission 22/00742/FULL dated 10.03.2023.

    Decided 16 Apr 2026 Conditions
  • 26/00184/MDC Awaiting decision

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of post-construction whole life cycle carbon assessment pursuant to condition 38 of Planning permission 22/00742/FULL dated 10.03.2023.

    Submitted 5 Feb 2026 Conditions
  • 26/00191/MDC Awaiting decision

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of Post-Completion Circular Economy Statement pursuant to condition 39 of Planning permission 22/00742/FULL dated 10.03.2023

    Submitted 5 Feb 2026 Conditions
  • 26/00137/NMA Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Application under S96a of the Town and Country Planning Act to amend condition 39 (post completion report relating to Circular Economy statement) of planning permission ref. 22/00742/FULL

    Decided 28 Apr 2026 Amendments
  • 25/01784/MDC Withdrawn

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of a post construction BREEAM assessment demonstrating that a target rating of 'Excellent' has been achieved (or such other target rating as the local planning authority may agree provided that it is satisfied all reasonable endeavours have been used to achieve an 'Excellent' rating) pursuant to condition 32 of planning permission 22/00742/FULL dated 13/03/2023.

    Decided 5 Feb 2026 Conditions
  • 25/01785/MDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of plant noise, installation and maintenance; and details relating to mounting of mechanical plant to minimise transmission of structure borne sound or vibration pursuant to conditions 3 and 4 of planning permission 25/01229/FULL dated 12/12/2025.

    Decided 30 Jan 2026 Conditions

Timeline

Dates from the published record

  1. 23 Sep 2025

    Received by City of London

  2. 17 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 12 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    City of London took a median of 78 days over the applications it decided in the last year.

Cases linked to this one on the register

2 later applications on the register refer to this one:

  • 26/00420/LDC Awaiting decision

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of post completion survey pursuant to condition 10 of Listed Building Consent 25/01302/LBC dated 06.02.2026.

    Submitted 23 Mar 2026 Lawful development
  • 26/00401/LDC Awaiting decision

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of Internal Strip Out Schedule pursuant to condition 7 of Listed Building Consent 25/01302/LBC dated 06.02.2026.

    Submitted 19 Mar 2026 Lawful development

Who's behind it

Company information only, from the register and Companies House

Daniel Watney LLP Agent, registered in London

Active · incorporated 2010 · London

104 applications on PlanIndex · across 17 councils · 95% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with City of London for determination, against a statutory target of eight weeks. Over the last year City of London decided heritage and listed building applications in a median of 95 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    25/01105/PODC Submitted 6 Aug 2025 0m away

    Submission of the Culture and Visitor Management Plan pursuant to Schedule 3 Paragraph 12.2 of the S106 Agreement dated 30 September 2021 (Planning Application Reference: 20/00932/FULMAJ), as amended by the Deed of Variation dated 10 March 2023 (Planning Application Reference: 22/00742/FULL).

    Granted 6 docs
  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    25/01283/MDC Submitted 18 Sep 2025 0m away

    Submission of SuDs details pursuant to discharge of condition 31 of planning permission 22/00742/FULL dated 10.03.2023.

    Granted Conditions 13 docs
  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    26/00420/LDC Submitted 23 Mar 2026 0m away

    100% historically approved · decision due ~18 May

    Submission of details of post completion survey pursuant to condition 10 of Listed Building Consent 25/01302/LBC dated 06.02.2026.

    Awaiting decision Lawful development 3 docs
  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    25/01257/MDC Submitted 11 Sep 2025 0m away

    Submission of Lighting Details and Strategies pursuant to discharge of condition 25 and 62 of planning permission 22/00742/FULL dated 10.03.2023 and condition 12(a) of planning permission 22/0743/LBC dated 10.03.2023.

    Granted Conditions 8 docs
  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    25/00579/MDC Submitted 28 Apr 2025 0m away

    Submission of green roof details, cycle parking details and details of materials pursuant to discharge of respective conditions 24, 27 and 21(ii - xii and xvi - xx) of planning permission 22/00742/FULL dated 10.03.2023. NEW CYCLE PARKING DETAILS SUBMITTED 07/11/2025

    Granted Conditions 44 docs
  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    26/00401/LDC Submitted 19 Mar 2026 0m away

    100% historically approved · decision due ~14 May

    Submission of details of Internal Strip Out Schedule pursuant to condition 7 of Listed Building Consent 25/01302/LBC dated 06.02.2026.

    Awaiting decision Lawful development 5 docs

In City of London

  • 26/00934/LBC Granted

    Adelaide House London Bridge London EC4R 9HA

    Internal alterations including the provision of a building management suite within the basement and a business lounge and meeting room suite at ground floor level.

    1 Jul 2026 Heritage and listed buildings
  • 26/00986/LBC Granted

    Kings College Maughan Library Chancery Lane London WC2A 1LR

    Installation of acoustic panels in 5no. teaching spaces.

    10 Jul 2026 Heritage and listed buildings
  • 26/00937/LBC Granted

    Retail Unit 85 Fleet Street London EC4Y 1AE

    Listed Building Consent (i) to drill a hole in brickwork to allow for fixing of external illumination and (ii) a power cable, utilising the existing bracket in connection with 26/00374/ADVT

    1 Jul 2026 Heritage and listed buildings
  • 26/00970/LBC Granted

    Ground Floor And Basement, 26 Throgmorton Street And 123 Old Broad Street, London EC2N 2AN

    External alterations to the building frontage and internal redecoration and refurbishment of ground floor and basement levels.

    8 Jul 2026 Heritage and listed buildings
  • 26/00697/LBC Granted

    Livery Hall Coopers Hall 13 Devonshire Square London EC2M 4TH

    Internal and external alterations including replacement of the boiler and installation of a new flue, window repairs, minor structural repairs to the slated roof and installation of a man safe system, brickwork repairs, removal of paint and DOFF cleaning to masonry.

    13 May 2026 Heritage and listed buildings