Skip to content
PlanIndex Get alerts
Menu

Planning application

Snow Hill Police Station 5 Snow Hill London EC1A 2DP

Granted City of London 25/01229/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retention of additional plant at main roof level and proposed erection of enclosure to units (part retrospective).

As published by the council, reference 25/01229/FULL

Application record

Reference
25/01229/FULL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Approved
Received
5 Sep 2025
Validated
2 Oct 2025
Decided
12 Dec 2025
Ward
Farringdon Without
Decision by
Delegated
Postcode
EC1A 2DP

Site history

Applications at this address on the City of London register

This site has had 53 applications since 2020: 49 approved, 0 refused.

  • 26/00958/MDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of BREEAM New Construction Final Certificate pursuant to discharge of condition 32 of planning permission 22/00742/FULL dated 10.03.2023.

    Decided 13 Aug 2026
  • 26/00483/MDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of Post-Completion Survey Note pursuant to condition 63 of Planning permission 22/00742/FULL dated 13.03.2023.

    Decided 23 Oct 2026
  • 26/00420/LDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of post completion survey pursuant to condition 10 of Listed Building Consent 25/01302/LBC dated 06.02.2026.

    Decided 23 Oct 2026 Lawful development
  • 26/00401/LDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of Internal Strip Out Schedule pursuant to condition 7 of Listed Building Consent 25/01302/LBC dated 06.02.2026.

    Decided 23 Oct 2026 Lawful development
  • 26/00262/MDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of Climate Change Resilience and Sustainability Report pursuant to condition 41 of planning permission 22/00742/FULL dated 10.03.2023.

    Decided 16 Apr 2026 Conditions
  • 26/00184/MDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of post-construction whole life cycle carbon assessment pursuant to condition 38 of Planning permission 22/00742/FULL dated 10.03.2023.

    Decided 20 Oct 2026
  • 26/00191/MDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of Post-Completion Circular Economy Statement pursuant to condition 39 of Planning permission 22/00742/FULL dated 10.03.2023

    Decided 20 Oct 2026
  • 26/00137/NMA Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Application under S96a of the Town and Country Planning Act to amend condition 39 (post completion report relating to Circular Economy statement) of planning permission ref. 22/00742/FULL

    Decided 28 Apr 2026 Amendments
  • 25/01784/MDC Withdrawn

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of a post construction BREEAM assessment demonstrating that a target rating of 'Excellent' has been achieved (or such other target rating as the local planning authority may agree provided that it is satisfied all reasonable endeavours have been used to achieve an 'Excellent' rating) pursuant to condition 32 of planning permission 22/00742/FULL dated 13/03/2023.

    Decided 5 Feb 2026 Conditions
  • 25/01785/MDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of plant noise, installation and maintenance; and details relating to mounting of mechanical plant to minimise transmission of structure borne sound or vibration pursuant to conditions 3 and 4 of planning permission 25/01229/FULL dated 12/12/2025.

    Decided 30 Jan 2026 Conditions

Timeline

Dates from the published record

  1. 5 Sep 2025

    Received by City of London

  2. 2 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 12 Dec 2025

    Decision issued: Approved

  4. 24 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 25/01785/MDC Granted

    Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    Submission of details of plant noise, installation and maintenance; and details relating to mounting of mechanical plant to minimise transmission of structure borne sound or vibration pursuant to conditions 3 and 4 of planning permission 25/01229/FULL dated 12/12/2025.

    Decided 30 Jan 2026 Conditions
  • Application: 25/01230/LBC (Decided)

Who's behind it

Company information only, from the register and Companies House

Daniel Watney LLP Agent, registered in London

Active · incorporated 2010 · London

134 applications on PlanIndex · across 18 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Whitbread Group Plc Applicant

36 applications on PlanIndex · across 3 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

50 documents on file for this application

  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 12 Dec 2025
  • COVER LETTER Cover Letter · 05 Dec 2025
  • REVIEW OF THE VISUAL IMPACT ASSESSMENT Other · 25 Nov 2025
  • BLOCK B ROOF LOUVRE SECTION B Drawing · 25 Nov 2025
  • BLOCK B ROOF LOUVRE SECTION A Drawing · 25 Nov 2025
  • BLOCK B AC PLANT SCREEN Drawing · 25 Nov 2025
  • ROOF PLAN WITH ST PAUL'S HEIGHTS STEPPED Drawing · 25 Nov 2025
  • ST PAUL'S HEIGHTS INTERPOLATED Drawing · 25 Nov 2025
  • VISUAL IMPACT ASSESSMENT REVA Other · 25 Nov 2025
  • CAAC LETTER Public Comment · 21 Nov 2025
  • COMMENTS - LONDON BOROUGH OF ISLINGTON Consultee Comment · 28 Oct 2025
  • COMMENTS - LONDON BOROUGH OF TOWER HAMLETS Consultee Comment · 21 Oct 2025
  • COMMENTS - LONDON BOROUGH OF WESTMINSTER Consultee Comment · 17 Oct 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 16 Oct 2025
  • BLOCK B SECTION A Drawing · 03 Oct 2025
  • PROPOSED BLOCK B ELEVATIONS Drawing · 03 Oct 2025
  • PROPOSED BLOCK B ELEVATIONS Drawing · 03 Oct 2025
  • PROPOSED STREET ELEVATIONS Drawing · 03 Oct 2025
  • BLOCK B SECTION B Drawing · 03 Oct 2025
  • ROOF FLOOR PROPOSED GA PLAN WITH ROOF TOP AC AND PLANT LOUVRE SCREEN AS NOW PROP Drawing · 03 Oct 2025
  • OVERALL SITE PLAN Site Plan · 26 Sep 2025
  • GENERATOR SCOPE APP FINAL Other · 26 Sep 2025
  • PROPOSED BLOCK B ELEVATIONS Drawing · 17 Sep 2025
  • PROPOSED STREET ELEVATIONS Drawing · 17 Sep 2025
  • BLOCK B SECTION B Drawing · 17 Sep 2025
  • BLOCK B SECTION A Drawing · 17 Sep 2025
  • ROOF FLOOR PROPOSED GA PLAN Drawing · 17 Sep 2025
  • PROPOSED BLOCK B ELEVATIONS Drawing · 17 Sep 2025
  • APPLICATIONFORMREDACTED Application Form · 05 Sep 2025
  • 22-0034-R1-0 24.11.07 PLANT NOISE ASSESSMENT Report - Acoustic/Noise Report · 05 Sep 2025
  • ROOF PLAN Drawing · 05 Sep 2025
  • BLOCK B SECTION B Drawing · 05 Sep 2025
  • PROPOSED STREET ELEVATIONS Drawing · 05 Sep 2025
  • PROPOSED STREET ELEVATIONS - PLANT SCREEN Drawing · 05 Sep 2025
  • PROPOSED BLOCK B ELEVATIONS - PLANT SCREEN Drawing · 05 Sep 2025
  • PROPOSED BLOCK B ELEVATIONS - PLANT SCREEN Drawing · 05 Sep 2025
  • BLOCK B SECTION A - PLANT SCREEN Drawing · 05 Sep 2025
  • BLOCK B SECTION B - PLANT SCREEN Drawing · 05 Sep 2025
  • AS NOW PROPOSED - ROOF FLOOR PROPOSED GA PLAN Drawing · 05 Sep 2025
  • 5177-WD-002-OVERALL SITE PLAN Site Plan · 05 Sep 2025
  • AS EXISTING - ROOF FLOOR PROPOSED GA PLAN Drawing · 05 Sep 2025
  • PLANT APP FINAL Cover Letter · 05 Sep 2025
  • HERITAGE STATEMENT_INCLUDED_IN_DESIGN AND ACCESS STATEMENT Accompanying report · 05 Sep 2025
  • PLANNING STATEMENT_INCLUDED_IN_DESIGN AND ACCESS STATEMENT Report - Planning Statement/Report · 05 Sep 2025
  • PROPOSED BLOCK B ELEVATIONS Drawing · 05 Sep 2025
  • PROPOSED BLOCK B ELEVATIONS Drawing · 05 Sep 2025
  • PROPOSED STREET ELEVATIONS Drawing · 05 Sep 2025
  • PROPOSED BLOCK B ELEVATIONS Drawing · 05 Sep 2025
  • PROPOSED BLOCK B ELEVATIONS Drawing · 05 Sep 2025
  • BLOCK B SECTION A Drawing · 05 Sep 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 12 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    24/00007/LDC Submitted 4 Jan 2024 50 yards away

    Submission of details of particulars and samples of the materials to be used on all external faces of Block A and Block B and the atrium including external ground and upper level surfaces including brick samples panels to be inspected on site pursuant to condition 21(i) of Listed Building Consent ref. 22/00743/LBC.

    Granted Lawful development 3 docs
  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    25/01105/PODC Submitted 6 Aug 2025 50 yards away

    Submission of the Culture and Visitor Management Plan pursuant to Schedule 3 Paragraph 12.2 of the S106 Agreement dated 30 September 2021 (Planning Application Reference: 20/00932/FULMAJ), as amended by the Deed of Variation dated 10 March 2023 (Planning Application Reference: 22/00742/FULL).

    Granted 5 docs
  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    25/01283/MDC Submitted 18 Sep 2025 50 yards away

    Submission of SuDs details pursuant to discharge of condition 31 of planning permission 22/00742/FULL dated 10.03.2023.

    Granted Conditions 12 docs
  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    25/01257/MDC Submitted 11 Sep 2025 50 yards away

    Submission of Lighting Details and Strategies pursuant to discharge of condition 25 and 62 of planning permission 22/00742/FULL dated 10.03.2023 and condition 12(a) of planning permission 22/0743/LBC dated 10.03.2023.

    Granted Conditions 7 docs
  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    22/01041/MDC Submitted 31 Oct 2022 50 yards away

    Submission of details of protective measures for retained historic fabric and features, and a methodology and monitoring strategy to ensure the stability of the retained structures of the historic building pursuant to conditions 7 (part) and 10 (part) of listed building consent ref. 22/00743/LBC dated 10.03.2023 and pursuant to Condition 63 (part) of Planning Permission ref. 22/00742/FULL dated 10.03.2023.

    Granted Conditions 23 docs
  • Snow Hill Police Station 5 Snow Hill London EC1A 2DP

    25/00579/MDC Submitted 28 Apr 2025 50 yards away

    Submission of green roof details, cycle parking details and details of materials pursuant to discharge of respective conditions 24, 27 and 21(ii - xii and xvi - xx) of planning permission 22/00742/FULL dated 10.03.2023. NEW CYCLE PARKING DETAILS SUBMITTED 07/11/2025

    Granted Conditions 43 docs

In City of London

  • 24/00544/FULL Granted

    6 -7 New Street London EC2M 4TP

    Conversion of two dwelling houses into eight studio flats and one two bedroom flat (ii) external alterations to windows on rear elevation of number 7 and mansard roof of number 6.

    Received 28 May, published by the council 30 Oct 2026 Full applications
  • 26/00858/FULL Granted

    Condor House 10 St Paul's Churchyard London EC4M 8AL

    Replacement of existing vertical sash window frames and glazing on north, east and northwestern facades with fixed glazing units.

    Received 12 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01104/FULL Granted

    30 - 34 Moorgate London EC2R 6DA

    Refurbishment and alterations comprising, (i) alterations to plant equipment at roof level, (ii) installation of CCTV cameras, (iii) alterations to ground floor entrances, and (iv) removal of 2no. ground floor doors and installation of glazing, and associated works.

    Received 31 Jul, published by the council 24 Aug 2026 Full applications
  • 26/00828/FULL Withdrawn

    88 Wood Street London EC2V 7DA

    Installation of a structure affixed to the existing south elevation at Level 12 roof terrace to provide a frame and enclosure for the installation of an LED screen and associated speakers.

    Received 8 Jun, published by the council 24 Jul 2026 Full applications
  • 26/00200/FULL Granted

    East India Arms Public House 67 Fenchurch Street London EC3M 4BR

    Installation of 1no. external lantern and 3no. external trough lights.

    Received 9 Feb, published by the council 24 Jul 2026 Full applications