Planning application
61 - 65 Holborn Viaduct London EC1A 2FD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Submission of details of the rainwater harvesting and greywater collection systems, to include the location of tanks and areas/locations of use for the collected water pursuant to discharge of condition 25 of planning permission 22/01243/FULMAJ dated 21.09.2023.
As published by the council, reference 25/01207/MDC
Application record
- Reference
- 25/01207/MDC
- Type
- Submission of details (Planning)
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 2 Sep 2025
- Validated
- 2 Sep 2025
- Decided
- 28 Nov 2025
- Ward
- Farringdon Within
- Decision by
- Delegated
- Postcode
- EC1A 2FD
Site history
Applications at this address on the City of London register
This site has had 26 applications since 2022: 23 approved, 0 refused.
-
26/00962/MDC Granted
61-65 Holborn Viaduct London EC1A 2FD
Submission of Delivery and Servicing Management Plan pursuant to discharge of condition 2 of planning permission 25/01788/FULL dated 13.02.2026.
-
26/00624/MDC Granted
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of details of Lighting Strategy pursuant to condition 41 of Planning Permission 22/01243/FULMAJ dated 03.10.2023.
-
26/00623/MDC Awaiting decision
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of details of balustrades and measures to prevent jumping or falling throughout the building pursuant to condition 29 of Planning Permission 26/00244/FULL dated 24.06.2026
-
26/00622/MDC Granted
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of details of external facing materials pursuant to part discharge of Parts E and K and full discharge of Parts F and H of Condition 21 of planning permission 26/00244/FULL dated 24th June 2026
-
26/00244/FULL Granted
61 - 65 Holborn Viaduct London EC1A 2FD
Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 45 (Cycle Parking) to update the cycle parking mix and quantum and vary condition 63 (Approved Drawings) to replace the amenity spaces on levels 02 to 05 with four additional PBSA studio rooms, reflect the change in cycle parking arrangement and introduce the new larger amenity space at Basement level 02 of planning permission 22/01243/FULMAJ dated 21/09/2023.
-
26/00271/PODC Awaiting decision
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of details of the Wheelchair Affordable Student Accommodation Units pursuant to Schedule 3 Paragraph 4.11 of the S106 Agreement dated 02 September 2022 (Planning Application Reference: 21/00781/FULMAJ) as amended by the Deed of Variation dated 02 October 2023 (Planning Application Reference: 22/01243/FULMAJ).
-
26/00151/MDC Granted
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of details of: particulars and samples (i) full suite of planning and layout (ii) maintenance schedules (iii) specifications and irrigation details for the green roofs (iv) and detailed Urban Greening Factor plans pursuant to conditions 22, 23, 24 and 28 of Planning Permission 26/00244/FULL dated 24.06.2026
-
26/00054/MDC Granted
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of details of the proposed new internal courtyard and external facade(s) including typical bay and; details and materials of the fenestration of the development including window safety mesh pursuant to condition 21 (parts C and D) of planning permission 22/01243/FULMAJ dated 21/09/2023.
-
25/01788/FULL Granted
61-65 Holborn Viaduct London EC1A 2FD
Use of the site as Purpose-Built Student Accommodation to include unrestricted lets outside of the Academic Year (Sui Generis); and temporary change of use of from Purpose Built Student Accommodation (Sui Generis) to flexible Purpose-Built Student Accommodation (Sui Generis) / Hotel Use (Class C1) for the 2027/28 Academic Year only.
-
25/01278/MDC Granted
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of elevations, luminaire schedule, lighting calculations and layout pursuant to discharge of condition 42 of planning permission 22/01243/FULMAJ dated 21.09.2023.
Timeline
Dates from the published record
-
2 Sep 2025
Received by City of London
-
28 Nov 2025
Decision issued: Approved
-
24 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
- Application: 22/01243/FULMAJ (Decided)
Documents
Plans, drawings, consultee responses and the officer's report
66 documents on file for this application
- APPROVAL OF SUBMISSION OF DETAILS
- APPLICATIONFORMREDACTED
- PLANNING CONDITION 25 COVERING LETTER
- DOMESTIC WATER SERVICES SCHEMATIC SHEET 1 OF 3
- DOMESTIC WATER SERVICES SCHEMATIC SHEET 2 OF 3
- DOMESTIC WATER SERVICES SCHEMATIC SHEET 3 OF 3
- RAINWATER SCHEMATIC SHEET 1 OF 3
- RAINWATER SCHEMATIC SHEET 2 OF 3
- RAINWATER SCHEMATIC SHEET 3 OF 3
- MECHANICAL SERVICES TANK ROOM SCHEMATIC
- GROUND FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- FIRST FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- FIRST FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 2 OF 2
- SECOND FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- SECOND FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 2 OF 2
- FIFTH FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- FIFTH FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 2 OF 2
- TENTH FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- TENTH FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 2 OF 2
- ELEVENTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- ELEVENTH FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 2 OF 2
- TWELFTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- TWELFTH FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 2 OF 2
- BASEMENT B1 MECHANICAL PIPEWORK LAYOUT
- BASEMENT B2 MECHANICAL PIPEWORK LAYOUT
- LOWER GROUND FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- LOWER GROUND FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 2 OF 2
- ROOF MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- ROOF MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- THIRD-FOURTH FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- THIRD-FOURTH FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 2 OF 2
- SIXTH-NINTH FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- SIXTH-NINTH FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 2 OF 2
- BASEMENT B1 ABOVE GROUND DRAINAGE LAYOUT
- BASEMENT B2 ABOVE GROUND DRAINAGE LAYOUT
- LOWER GROUND ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- LOWER GROUND ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- ROOF ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- FOURTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- SIXTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- SIXTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- SEVENTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- TENTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- ROOF ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- GROUND FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- GROUND FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- FIRST FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- FIRST FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- SECOND FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- SECOND FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- THIRD FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- THIRD FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- FOURTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- FIFTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- FIFTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- SEVENTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- EIGHTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- EIGHTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- NINTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- NINTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- TENTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 1 OF 2
- FIRST FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- ELEVENTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- ELEVENTH FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 1 OF 2
- TWELFTH FLOOR ABOVE GROUND DRAINAGE LAYOUT SHEET 2 OF 2
- GROUND FLOOR MECHANICAL PIPEWORK LAYOUT SHEET 2 OF 2
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 28 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
65 Holborn Viaduct London EC1A 2FD
Submission of Construction Logistics Plan pursuant to condition 10 (part) of planning permission 21/00781/FULMAJ dated 02.09.2022.
Granted Conditions 6 docs -
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of elevations, luminaire schedule, lighting calculations and layout pursuant to discharge of condition 42 of planning permission 22/01243/FULMAJ dated 21.09.2023.
Granted Conditions 7 docs -
61 - 65 Holborn Viaduct London EC1A 2FD
Non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 22/01243/FULMAJ dated 11 October 2023 to: amend the wording of Condition 47 to reduce minimum loading bay headroom from 4.6m to 3.8m.
Granted Amendments 5 docs -
61 - 65 Holborn Viaduct London EC1A 2FD
100% historically approved · decision due ~24 Jun
Submission of water mains plan, piling layout, Circular Economy Statement, Whole Life Cycle Carbon Assessment, Climate Change Resilience, Water contamination, Land contamination and Hostile Vehicle Mitigation Summary Strategy pursuant to Condition 7, 13, 14,15, 16, 17, 18 and 19 of planning permission 21/00781/FULMAJ dated 02.09.2022, as amended by 22/01243/FULMAJ dated 21.09.2023.
Awaiting decision Conditions 18 docs -
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of a Construction Logistics Plan to manage all freight vehicle movements to and from the site during construction of the development pursuant to condition 10 of planning permission 22/01243/FULMAJ dated 03/10/2023.
Granted Conditions 4 docs -
65 Holborn Viaduct London EC1A 2FD
Submission of details of diversion of water mains to prevent the potential for damage to subsurface potable water infrastructure pursuant to condition 7 of planning permission 21/00781/FULMAJ (dated 22.09.2022).
Granted Conditions 8 docs
Other condition discharge and variation applications
In City of London
-
26/01219/MDC Granted
Tower 42 International Financial Centre 25 Old Broad Street London EC2N 1HQ
Submission of details of the materials to be used on external faces pursuant to discharge of Condition 2(a) of planning permission 24/01203/FULL dated 02.06.2025.
-
26/01308/MDC Awaiting decision
1 Poultry London EC2R 8EJ
Submission of Protection of Historic Fabric report and Heritage Fabric Protection Register pursuant to condition 5 of planning permission 25/01714/LBC dated 07.08.2026.
-
26/01244/MDC Awaiting decision
60 Queen Victoria Street London EC4N 4TZ
Submission of landscaping details and a Landscape and Ecology Management Plan pursuant to discharge of Condition 5, 17(d), 18(d) and 33 planning permission 23/01422/FULMAJ dated 11.04.2025.
-
26/01248/MDC Awaiting decision
20 Giltspur Street London EC1A 9DD
Submission of Security Management Plan pursuant to Condition 34 of planning permission 22/00867/FULMAJ dated 14.09.2023.
-
26/01249/MDC Awaiting decision
6 - 11 Crescent London EC3N 2LY
Submission of details Access Management Plan pursuant to condition 16 of Planning Permission 24/00776/FULL dated 11.07.2025.