Skip to content
PlanIndex Get alerts
Menu

Planning application

61 - 65 Holborn Viaduct London EC1A 2FD

Granted City of London 25/01094/PODC Planning Obligations

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Submission of details of the Cultural Operator pursuant to Schedule 3 Paragraph 11.1 and submission of the Cultural Implementation Strategy pursuant to Schedule 3 Paragraph 11.2 of the S106 Agreement dated 02 September 2022 (Planning Application Reference: 21/00781/FULMAJ) as amended by the Deed of Variation dated 02 October 2023 (Planning Application Reference: 22/01243/FULMAJ).

As published by the council, reference 25/01094/PODC

Application record

Reference
25/01094/PODC
Type
Planning Obligations
Status
Decided
Decision
Approved
Received
7 Aug 2025
Validated
7 Aug 2025
Decided
3 Aug 2026
Ward
Farringdon Within
Decision by
Delegated Decision
Postcode
EC1A 2FD

Site history

Applications at this address on the City of London register

This site has had 20 applications since 2022: 16 approved, 0 refused.

  • 26/00962/MDC Awaiting decision

    61-65 Holborn Viaduct London EC1A 2FD

    Submission of Delivery and Servicing Management Plan pursuant to discharge of condition 2 of planning permission 25/01788/FULL dated 13.02.2026.

    Submitted 7 Jul 2026
  • 26/00624/MDC Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of details of Lighting Strategy pursuant to condition 41 of Planning Permission 22/01243/FULMAJ dated 03.10.2023.

    Decided 30 Jun 2026 Conditions
  • 26/00623/MDC Awaiting decision

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of details of balustrades and measures to prevent jumping or falling throughout the building pursuant to condition 29 of Planning Permission 26/00244/FULL dated 24.06.2026

    Submitted 28 Apr 2026 Conditions
  • 26/00622/MDC Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of details of external facing materials pursuant to part discharge of Parts E and K and full discharge of Parts F and H of Condition 21 of planning permission 26/00244/FULL dated 24th June 2026

    Decided 17 Aug 2026 Conditions
  • 26/00244/FULL Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary condition 45 (Cycle Parking) to update the cycle parking mix and quantum and vary condition 63 (Approved Drawings) to replace the amenity spaces on levels 02 to 05 with four additional PBSA studio rooms, reflect the change in cycle parking arrangement and introduce the new larger amenity space at Basement level 02 of planning permission 22/01243/FULMAJ dated 21/09/2023.

    Decided 24 Jun 2026 Full applications
  • 26/00271/PODC Awaiting decision

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of details of the Wheelchair Affordable Student Accommodation Units pursuant to Schedule 3 Paragraph 4.11 of the S106 Agreement dated 02 September 2022 (Planning Application Reference: 21/00781/FULMAJ) as amended by the Deed of Variation dated 02 October 2023 (Planning Application Reference: 22/01243/FULMAJ).

    Submitted 16 Feb 2026
  • 26/00151/MDC Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of details of: particulars and samples (i) full suite of planning and layout (ii) maintenance schedules (iii) specifications and irrigation details for the green roofs (iv) and detailed Urban Greening Factor plans pursuant to conditions 22, 23, 24 and 28 of Planning Permission 26/00244/FULL dated 24.06.2026

    Decided 13 Aug 2026 Conditions
  • 26/00054/MDC Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of details of the proposed new internal courtyard and external facade(s) including typical bay and; details and materials of the fenestration of the development including window safety mesh pursuant to condition 21 (parts C and D) of planning permission 22/01243/FULMAJ dated 21/09/2023.

    Decided 17 Jul 2026 Conditions
  • 25/01788/FULL Granted

    61-65 Holborn Viaduct London EC1A 2FD

    Use of the site as Purpose-Built Student Accommodation to include unrestricted lets outside of the Academic Year (Sui Generis); and temporary change of use of from Purpose Built Student Accommodation (Sui Generis) to flexible Purpose-Built Student Accommodation (Sui Generis) / Hotel Use (Class C1) for the 2027/28 Academic Year only.

    Decided 13 Feb 2026 Full applications
  • 25/01278/MDC Granted

    61 - 65 Holborn Viaduct London EC1A 2FD

    Submission of elevations, luminaire schedule, lighting calculations and layout pursuant to discharge of condition 42 of planning permission 22/01243/FULMAJ dated 21.09.2023.

    Decided 18 Dec 2025 Conditions

Timeline

Dates from the published record

  1. 7 Aug 2025

    Received by City of London

  2. 24 Jul 2026

    Added to PlanIndex

  3. 3 Aug 2026

    Decision issued: Approved

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

City of London granted permission on 3 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 61 - 65 Holborn Viaduct London EC1A 2FD

    25/01278/MDC Submitted 17 Sep 2025 0m away

    Submission of elevations, luminaire schedule, lighting calculations and layout pursuant to discharge of condition 42 of planning permission 22/01243/FULMAJ dated 21.09.2023.

    Granted Conditions 8 docs
  • 61 - 65 Holborn Viaduct London EC1A 2FD

    25/01073/NMA Submitted 6 Aug 2025 0m away

    Non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 22/01243/FULMAJ dated 11 October 2023 to: amend the wording of Condition 47 to reduce minimum loading bay headroom from 4.6m to 3.8m.

    Granted Amendments 5 docs
  • 61 - 65 Holborn Viaduct London EC1A 2FD

    25/00580/MDC Submitted 29 Apr 2025 0m away

    100% historically approved · decision due ~24 Jun

    Submission of water mains plan, piling layout, Circular Economy Statement, Whole Life Cycle Carbon Assessment, Climate Change Resilience, Water contamination, Land contamination and Hostile Vehicle Mitigation Summary Strategy pursuant to Condition 7, 13, 14,15, 16, 17, 18 and 19 of planning permission 21/00781/FULMAJ dated 02.09.2022, as amended by 22/01243/FULMAJ dated 21.09.2023.

    Awaiting decision Conditions 18 docs
  • 61 - 65 Holborn Viaduct London EC1A 2FD

    24/01307/MDC Submitted 11 Dec 2024 0m away

    Submission of a Construction Logistics Plan to manage all freight vehicle movements to and from the site during construction of the development pursuant to condition 10 of planning permission 22/01243/FULMAJ dated 03/10/2023.

    Granted Conditions 5 docs
  • 65 Holborn Viaduct London EC1A 2FD

    23/00894/MDC Submitted 14 Aug 2023 0m away

    Submission of details of diversion of water mains to prevent the potential for damage to subsurface potable water infrastructure pursuant to condition 7 of planning permission 21/00781/FULMAJ (dated 22.09.2022).

    Granted Conditions 8 docs
  • 65 Holborn Viaduct London EC1A 2FD

    23/00723/MDC Submitted 10 Jul 2023 0m away

    Submission of details of the foundations and piling configuration, to include a detailed design and method statement pursuant to condition 13 of planning permission 21/00781/FULMAJ dated 02/09/2022.

    Granted Conditions 9 docs