Skip to content
PlanIndex Get alerts
Menu

Planning application

8 - 9 Lovat Lane London EC3R 8DW

Granted City of London 25/00787/FULL Full Planning Permission

Works: Roofing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of the existing building from Commercial Business and Service use (Class E) to Hotel (Class C1) use, removal of existing plant and installation of new plant and PV panels on the roof, alterations to facade and other associated works.

As published by the council, reference 25/00787/FULL

Application record

Reference
25/00787/FULL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Approved
Received
17 Jun 2025
Validated
17 Jun 2025
Decided
21 Nov 2025
Ward
Bridge And Bridge Without
Decision by
Delegated
Postcode
EC3R 8DW

Site history

Applications at this address on the City of London register

This site has had 4 applications since 2025: 3 approved, 0 refused.

  • 26/00206/MDC Awaiting decision

    8 - 9 Lovat Lane London EC3R 8DW

    Submission of details of Construction Environmental Management Plan pursuant to condition 2 of Planning permission 25/00787/FULL dated 21.11.2025.

    Submitted 10 Feb 2026 Conditions
  • 26/00207/MDC Granted

    8 - 9 Lovat Lane London EC3R 8DW

    Submission of details of Site Condition Survey and Proposed Basement and Ground Finished Floor Level Plans pursuant to condition 3 (a) Permission 25/00787/FULL dated 21.11.2025.

    Decided 26 Mar 2026 Conditions
  • 26/00208/MDC Granted

    8 - 9 Lovat Lane London EC3R 8DW

    Submission of details of Construction Logistics Plan pursuant to condition 5 Permission 25/00787/FULL dated 21.11.2025.

    Decided 1 Jul 2026

Timeline

Dates from the published record

  1. 17 Jun 2025

    Received by City of London

  2. 21 Nov 2025

    Decision issued: Approved

  3. 7 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

3 later applications on the register refer to this one:

  • 26/00206/MDC Awaiting decision

    8 - 9 Lovat Lane London EC3R 8DW

    Submission of details of Construction Environmental Management Plan pursuant to condition 2 of Planning permission 25/00787/FULL dated 21.11.2025.

    Submitted 10 Feb 2026 Conditions
  • 26/00208/MDC Granted

    8 - 9 Lovat Lane London EC3R 8DW

    Submission of details of Construction Logistics Plan pursuant to condition 5 Permission 25/00787/FULL dated 21.11.2025.

    Decided 1 Jul 2026
  • 26/00207/MDC Granted

    8 - 9 Lovat Lane London EC3R 8DW

    Submission of details of Site Condition Survey and Proposed Basement and Ground Finished Floor Level Plans pursuant to condition 3 (a) Permission 25/00787/FULL dated 21.11.2025.

    Decided 26 Mar 2026 Conditions

Who's behind it

Company information only, from the register and Companies House

Iceni Projects Ltd. Agent, registered in London

Active · incorporated 2005 · London

847 applications on PlanIndex · across 91 councils · 95% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Crown (Lovat Lane) Limited Applicant, registered in London

Active · incorporated 2024 · London

3 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

68 documents on file for this application

  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 21 Nov 2025
  • PROPOSED ? GROUND FLOOR Drawing · 19 Nov 2025
  • PROPOSED ? FIRST FLOOR Drawing · 19 Nov 2025
  • PROPOSED FRONT & REAR ELEVATIONS Drawing · 19 Nov 2025
  • PROPOSED ENTRANCE PLAN, ELEVATION & SECTION Drawing · 19 Nov 2025
  • AIR QUALITY CONSTRAINTS AND OPPORTUNITIES APPRAISAL Accompanying report · 19 Nov 2025
  • PLANNING ACCESS STATEMENT Report - Access Statement · 19 Nov 2025
  • PLANNING ACCESS STATEMENT Report - Access Statement · 29 Oct 2025
  • PROPOSED - GROUND FLOOR Drawing · 29 Oct 2025
  • PROPOSED - FIRST FLOOR Drawing · 29 Oct 2025
  • PROPOSED ENTRANCE PLAN, ELEVATION & SECTION Drawing · 29 Oct 2025
  • PROPOSED FRONT & REAR ELEVATIONS Drawing · 29 Oct 2025
  • PROPOSED SECTIONS AA BB Drawing · 21 Oct 2025
  • EXISTING & PROPOSED SOUTHERN WINDOW ELEVATIONS - GROUND FLOOR Drawing · 21 Oct 2025
  • FIRE STATEMENT Accompanying report · 21 Oct 2025
  • REPRESENTATION - MARK LEWCZYNSKI Public Comment · 06 Aug 2025
  • COMMENTS - CAAC Consultee Comment · 04 Aug 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 03 Jul 2025
  • APPLICATIONFORMREDACTED Application Form · 17 Jun 2025
  • SITE LOCATION PLAN Site Plan · 17 Jun 2025
  • LVL_DRAWING SCHEDULE 21.05.25 Drawings Schedule · 17 Jun 2025
  • PROPOSED FOURTH FLOOR Drawing · 17 Jun 2025
  • PROPOSED LOWER ROOF LEVEL Drawing · 17 Jun 2025
  • PROPOSED UPPER ROOF LEVEL Drawing · 17 Jun 2025
  • PROPOSED FRONT & REAR ELEVATIONS Drawing · 17 Jun 2025
  • PROPOSED ENTRANCE PLAN ELEVATION & SECTION Drawing · 17 Jun 2025
  • PROPOSED BASEMENT Drawing · 17 Jun 2025
  • PROPOSED LOWER GROUND FLOOR Drawing · 17 Jun 2025
  • PROPOSED GROUND FLOOR Drawing · 17 Jun 2025
  • PROPOSED FIRST FLOOR Drawing · 17 Jun 2025
  • PROPOSED GROUND FLOOR Drawing · 17 Jun 2025
  • PROPOSED THIRD FLOOR Drawing · 17 Jun 2025
  • EXISTING THIRD FLOOR Drawing · 17 Jun 2025
  • EXISTING FOURTH FLOOR Drawing · 17 Jun 2025
  • EXISTING LOWER ROOF PLAN Drawing · 17 Jun 2025
  • EXISTING UPPER ROOF PLAN Drawing · 17 Jun 2025
  • EXISTING SECTIONS AA & BB Drawing · 17 Jun 2025
  • LVL_SHEDULES OF USE ACCOMMODATION Other · 17 Jun 2025
  • EXISTING ENTRANCE PLAN & ELEVATION Drawing · 17 Jun 2025
  • EXISTING FRONT AND REAR ELEVATIONS Drawing · 17 Jun 2025
  • EXISTING BASEMENT PLAN Drawing · 17 Jun 2025
  • EXISTING LOWER GROUND FLOOR Drawing · 17 Jun 2025
  • EXISTING GROUND FLOOR PLAN Drawing · 17 Jun 2025
  • EXISTING FIRST FLOOR Drawing · 17 Jun 2025
  • EXISTING SECOND FLOOR PLAN Drawing · 17 Jun 2025
  • PLANNING STATEMENT Report - Planning Statement/Report · 17 Jun 2025
  • STATEMENT OF COMMUNITY INVOLVEMENT Other · 17 Jun 2025
  • SUDS STRATEGY Other · 17 Jun 2025
  • SUSTAINABILITY STATEMENT Accompanying report · 17 Jun 2025
  • TRANSPORT STATEMENT Report - Transport Statement/Report · 17 Jun 2025
  • VIABILITY ASSESSMENT Other · 17 Jun 2025
  • WASTE MANAGEMENT PLAN Report - Servicing/Waste Mgmt. Statement/Report · 17 Jun 2025
  • ACOUSTIC ASSESSMENT Report - Acoustic/Noise Report · 17 Jun 2025
  • AIR QUALITY ASSESSMENT Accompanying report · 17 Jun 2025
  • CIL FORM Other · 17 Jun 2025
  • COVERING LETTER Cover Letter · 17 Jun 2025
  • DESIGN AND ACCESS STATEMENT-1 Report - Design & Access Statement/Report · 17 Jun 2025
  • DESIGN AND ACCESS STATEMENT-2 Report - Design & Access Statement/Report · 17 Jun 2025
  • FIRE STATEMENT-1 Accompanying report · 17 Jun 2025
  • FIRE STATEMENT-2 Accompanying report · 17 Jun 2025
  • FRAMEWORK CONSTRUCTION MANAGEMENT PLAN Other · 17 Jun 2025
  • FRAMEWORK DELIVERY AND SERVICING PLAN Report - Transport Statement/Report · 17 Jun 2025
  • HERITAGE STATEMENT_PART1 Accompanying report · 17 Jun 2025
  • HERITAGE STATEMENT_PART2 Accompanying report · 17 Jun 2025
  • MARKETING HISTORY REPORT Accompanying report · 17 Jun 2025
  • OPERATIONAL MANAGEMENT PLAN Other · 17 Jun 2025
  • 111524 - 8-9 LOVAT LANE - APPRAISAL - NP V1E Other · 17 Jun 2025
  • COMMENTS - THAMES WATER Consultee Comment · 27 Jan 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 21 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 8 - 9 Lovat Lane London EC3R 8DW

    26/00206/MDC Submitted 10 Feb 2026 50 yards away

    100% historically approved · decision due ~7 Apr

    Submission of details of Construction Environmental Management Plan pursuant to condition 2 of Planning permission 25/00787/FULL dated 21.11.2025.

    Awaiting decision Conditions 4 docs
  • 8 - 9 Lovat Lane London EC3R 8DW

    26/00207/MDC Submitted 10 Feb 2026 50 yards away

    Submission of details of Site Condition Survey and Proposed Basement and Ground Finished Floor Level Plans pursuant to condition 3 (a) Permission 25/00787/FULL dated 21.11.2025.

    Granted Conditions 4 docs
  • 8 - 9 Lovat Lane London EC3R 8DW

    26/00208/MDC Submitted 10 Feb 2026 50 yards away

    Submission of details of Construction Logistics Plan pursuant to condition 5 Permission 25/00787/FULL dated 21.11.2025.

    Granted 6 docs
  • Faith House 23 - 24 Lovat Lane London EC3R 8EB

    24/00289/FULL Submitted 18 Mar 2024 50 yards away

    Replacement of existing front entrance double door with new glazed aluminium single door.

    Granted Full applications Windows or glazing 13 docs
  • 4 Lovat Lane London EC3R 8DT

    21/00098/LBC Submitted 15 Feb 2021 50 yards away

    Application under section 19 of the Planning (Listed Buildings and Conservation Areas) Act 1990 to vary the approved drawings listed under condition 5 of the listed building consent 18/00812/LBC to enable alterations to the layout of the rooftop plant screen.

    Granted Heritage and listed buildings 10 docs
  • 4 Lovat Lane London EC3R 8DT

    20/00995/NMA Submitted 15 Dec 2020 50 yards away

    Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 18/00811/FULL to enable alterations to the layout of the rooftop plant screen.

    Granted Amendments 8 docs

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications