Planning application

9 - 11 Angel Court London EC2R 7HB

Granted City of London 25/00646/FULL Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from office (Class E) and extension of 9-10 and 11 Angel Court to provide a hotel and ancillary uses (Class C1), together with landscaping to Angel Court and other works.

As published by the council, reference 25/00646/FULL

Application record

Reference
25/00646/FULL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Approved
Received
14 May 2025
Validated
14 May 2025
Decided
12 Nov 2025
Ward
Broad Street
Decision by
Delegated
Postcode
EC2R 7HB

Site history

Applications at this address on the City of London register

This site has had 8 applications since 2025: 6 approved, 0 refused.

  • 26/01441/MDC Awaiting decision

    9 - 11 Angel Court London EC2R 7HB

    Submission of fume extract arrangement pursuant to condition 56 of planning permission 25/00646/FULL dated 12.11.2025.

    Submitted 9 Oct 2026
  • 26/01421/MDC Awaiting decision

    9 - 11 Angel Court London EC2R 7HB

    Submission of details pursuant to the remaining parts of condition 6(g) details of ground floor entrances including hotel, fire exits and details of the window adaptations and detailed framing and relationships to decorative louvres and stone wok; 6(j) details of junctions with adjacent buildings; and 6(k) details of brick and stone cleaning and repairs to marble and decorative details of retained facades 9-10 and 11 Angel Court of planning permission 25/00646/FULL dated 12.11.2025.

    Submitted 7 Oct 2026
  • 26/00824/MDC Granted

    9 - 11 Angel Court London EC2R 7HB

    Submission of detail of Fatstrippa Specification, Cycle Parking Note, Cycle Store Note, Classic Sheffield Stand Specification and SBD Gas Assisted Two Tier Rack Specification Sheet pursuant to condition 11 (kitchen drainage) and 28 (cycle parking) of Planning Permission 25/00646/FULL dated 12.11.2025.

    Decided 20 Jul 2026
  • 26/00496/MDC Granted

    9 - 11 Angel Court London EC2R 7HB

    Submission of details of external materials and façade details condition 6 parts A-F, H,I. J, N and O pursuant to of Planning permission 25/00646/FULL dated 12.11.2025

    Decided 16 Oct 2026
  • 25/01740/MDC Granted

    9 - 11 Angel Court London EC2R 7HB

    Submission of a scheme in the form of an acoustic report compiled by a qualified specialist pursuant to condition 21 of planning permission 25/00646/FULL dated 12/11/2025.

    Decided 16 Jan 2026 Conditions
  • 25/01657/MDC Granted

    9 - 11 Angel Court London EC2R 7HB

    Submission of Traffic and Logistics Management Site Plan pursuant to condition 35 of planning permission 25/00646/FULL dated 12.11.2025.

    Decided 16 Jan 2026 Conditions
  • 25/01602/PODC Granted

    9 - 11 Angel Court London EC2R 7HB

    Submission of the Highway Schedule of Condition Survey pursuant to Schedule 3 Paragraph 3.1 of the S106 Agreement dated 12 November 2025 (Planning Application Reference: 25/00646/FULL).

    Decided 15 Dec 2025

Timeline

Dates from the published record

  1. 14 May 2025

    Received by City of London

  2. 12 Nov 2025

    Decision issued: Approved

  3. 7 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

7 later applications on the register refer to this one:

  • 26/01441/MDC Awaiting decision

    9 - 11 Angel Court London EC2R 7HB

    Submission of fume extract arrangement pursuant to condition 56 of planning permission 25/00646/FULL dated 12.11.2025.

    Submitted 9 Oct 2026
  • 26/01421/MDC Awaiting decision

    9 - 11 Angel Court London EC2R 7HB

    Submission of details pursuant to the remaining parts of condition 6(g) details of ground floor entrances including hotel, fire exits and details of the window adaptations and detailed framing and relationships to decorative louvres and stone wok; 6(j) details of junctions with adjacent buildings; and 6(k) details of brick and stone cleaning and repairs to marble and decorative details of retained facades 9-10 and 11 Angel Court of planning permission 25/00646/FULL dated 12.11.2025.

    Submitted 7 Oct 2026
  • 26/00824/MDC Granted

    9 - 11 Angel Court London EC2R 7HB

    Submission of detail of Fatstrippa Specification, Cycle Parking Note, Cycle Store Note, Classic Sheffield Stand Specification and SBD Gas Assisted Two Tier Rack Specification Sheet pursuant to condition 11 (kitchen drainage) and 28 (cycle parking) of Planning Permission 25/00646/FULL dated 12.11.2025.

    Decided 20 Jul 2026
  • 26/00496/MDC Granted

    9 - 11 Angel Court London EC2R 7HB

    Submission of details of external materials and façade details condition 6 parts A-F, H,I. J, N and O pursuant to of Planning permission 25/00646/FULL dated 12.11.2025

    Decided 16 Oct 2026
  • 25/01740/MDC Granted

    9 - 11 Angel Court London EC2R 7HB

    Submission of a scheme in the form of an acoustic report compiled by a qualified specialist pursuant to condition 21 of planning permission 25/00646/FULL dated 12/11/2025.

    Decided 16 Jan 2026 Conditions
  • 25/01657/MDC Granted

    9 - 11 Angel Court London EC2R 7HB

    Submission of Traffic and Logistics Management Site Plan pursuant to condition 35 of planning permission 25/00646/FULL dated 12.11.2025.

    Decided 16 Jan 2026 Conditions
  • 25/01602/PODC Granted

    9 - 11 Angel Court London EC2R 7HB

    Submission of the Highway Schedule of Condition Survey pursuant to Schedule 3 Paragraph 3.1 of the S106 Agreement dated 12 November 2025 (Planning Application Reference: 25/00646/FULL).

    Decided 15 Dec 2025
  • Application: 22/00860/FULMAJ (Decided)

Who's behind it

Company information only, from the register and Companies House

Daniel Watney LLP Agent, registered in London

Active · incorporated 2010 · London

133 applications on PlanIndex · across 17 councils · 97% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Whitbread Group Plc Applicant

34 applications on PlanIndex · across 3 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

158 documents on file for this application

  • S106 Decision · 17 Nov 2025
  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 12 Nov 2025
  • DRAFT SECTION 106 AGREEMENT S106 Agreement · 06 Nov 2025
  • SUB BASEMENT FLOOR-DEMOLITION PLAN Delete Doc · 02 Oct 2025
  • BASEMENT FLOOR-DEMOLITION PLAN Drawing · 02 Oct 2025
  • EXISTING SECTION D -B Drawing · 02 Oct 2025
  • EXISTING SECTIONS B & C -B Drawing · 02 Oct 2025
  • EXISTING SECTION A -B Drawing · 02 Oct 2025
  • ROOF -DEMOLITION PLAN-B Drawing · 02 Oct 2025
  • GROUND FLOOR-DEMOLITION PLAN-B Drawing · 02 Oct 2025
  • PROPOSED EASTERN STREETSCENE RENDER-B Drawing · 02 Oct 2025
  • PROPOSED SOUTHERN ELEVATION RENDER-B Drawing · 02 Oct 2025
  • PROPOSED WESTERN ELEVATION RENDER-B Drawing · 02 Oct 2025
  • PROPOSED EASTERN ELEVATION RENDER-B Drawing · 02 Oct 2025
  • PROPOSED EAST BAY DETAILS-A Drawing · 02 Oct 2025
  • PROPOSED NO. 11 & NO. 9-10 ENTRANCE DETAIL-B Drawing · 02 Oct 2025
  • PROPOSED EAST GROUND FLOOR DETAIL-A Drawing · 02 Oct 2025
  • PROPOSED NO.9-10-DETAILS-A Drawing · 02 Oct 2025
  • PROPOSED NO.11-FACADE CHANGES-B Drawing · 02 Oct 2025
  • PROPOSED NO.9-10-FACADE CHANGES-B Drawing · 02 Oct 2025
  • PROPOSED EASTERN STREETSCENE-B Drawing · 02 Oct 2025
  • PROPOSED NORTHERN ELEVATION-B Drawing · 02 Oct 2025
  • PROPOSED WESTERN ELEVATION-B Drawing · 02 Oct 2025
  • PROPOSED EASTERN ELEVATION-B Drawing · 02 Oct 2025
  • PROPOSED ROOF FLOOR -B Drawing · 02 Oct 2025
  • PROPOSED SITE PLAN -B Drawing · 02 Oct 2025
  • SUB BASEMENT FLOOR-DEMOLITION PLAN Drawing · 02 Oct 2025
  • FIFTH FLOOR-DEMOLITION PLAN-B Drawing · 02 Oct 2025
  • FOURTH FLOOR-DEMOLITION PLAN-B Drawing · 02 Oct 2025
  • THIRD FLOOR-DEMOLITION PLAN-B Drawing · 02 Oct 2025
  • SECOND FLOOR-DEMOLITION PLAN-B Drawing · 02 Oct 2025
  • FIRST FLOOR-DEMOLITION PLAN-B Drawing · 02 Oct 2025
  • MEZZANINE FLOOR-DEMOLITION PLAN-B Drawing · 02 Oct 2025
  • PROPOSED SOUTHERN ELEVATION-B Drawing · 02 Oct 2025
  • PROPOSED EIGHTH FLOOR -B Drawing · 02 Oct 2025
  • PROPOSED SECTION A -B Drawing · 02 Oct 2025
  • SUSTAINABILITY_STATEMENT Accompanying report · 02 Oct 2025
  • PRELIMINARY_ECOLOGICAL_APPRAISAL Accompanying report · 02 Oct 2025
  • PROPOSED NORTHERN ELEVATION RENDER-B Drawing · 02 Oct 2025
  • PROPOSED SEVENTH FLOOR -B Drawing · 02 Oct 2025
  • PROPOSED SIXTH FLOOR -B Drawing · 02 Oct 2025
  • PROPOSED FIFTH FLOOR -B Drawing · 02 Oct 2025
  • PROPOSED GROUND FLOOR -B Drawing · 02 Oct 2025
  • PROPOSED SECTION D -B Drawing · 02 Oct 2025
  • ANGEL COURT TOWNSCAPE REPORT Accompanying report · 02 Oct 2025
  • DESIGN AND ACCESS STATEMENT-ADDENDUM-LOW RESOLUTION Report - Design & Access Statement/Report · 02 Oct 2025
  • COVER LETTER Cover Letter · 02 Oct 2025
  • PLANNING_STATEMENT_FINAL Report - Planning Statement/Report · 02 Oct 2025
  • TRANSPORT ADDENDUM Report - Transport Statement/Report · 04 Jul 2025
  • FINANCIAL VIABILITY REVIEW Accompanying report · 04 Jul 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 04 Jul 2025
  • COMMENTS-THAMES WATER Consultee Comment · 23 May 2025
  • COVER LETTER Cover Letter · 16 May 2025
  • APPLICATIONFORMREDACTED Application Form · 14 May 2025
  • AIR QUALITY ASSESSMENT Accompanying report · 14 May 2025
  • CONSTRUCTION ENVIRONMENTAL MANAGEMENT ANGEL COURT 03 - 23.03.2025. REV 2 Accompanying report · 14 May 2025
  • DELIVERY AND SERVICING PLAN Other · 14 May 2025
  • WHI170325R(E-PDF)-FIRE STATEMENT (AMENDED) - HUB BY PREMIER INN ANGEL COURT Other · 14 May 2025
  • MOORAC.3 9-11 ANGEL COURT TOWNSCAPE REPORT Accompanying report · 14 May 2025
  • OPERATOR?S MANAGEMENT PLAN Accompanying report · 14 May 2025
  • NOISE IMPACT ASSESSMENT RP02 Report - Acoustic/Noise Report · 14 May 2025
  • PRELIMINARY ECOLOGICAL APPRAISAL Other · 14 May 2025
  • P22-118-REP-STR-001 (02) - ANGEL COURT - HUB BY PREMIER INN - STRUCTURAL PLANNIN Other · 14 May 2025
  • 2025-04-03 ANGEL COURT 8480 TS01 Report - Transport Statement/Report · 14 May 2025
  • 2025-04-03 ANGEL COURT 8480 TP02 Report - Travel Plan · 14 May 2025
  • 7620_0175_250328_XFER Photograph · 14 May 2025
  • 7620_7005_250328_XFER Photograph · 14 May 2025
  • 7620_0115_250328_XFER Photograph · 14 May 2025
  • 7620_0135_250328_XFER Photograph · 14 May 2025
  • 7620_0145_250328_XFER Photograph · 14 May 2025
  • 7620_0155_250328_XFER Photograph · 14 May 2025
  • 7620_0165_250328_XFER Photograph · 14 May 2025
  • MHL-7620-002-250328_A3T20I1_COMPRESSED Other · 14 May 2025
  • P22-118-FLOOD RISK ASSESSMENT DRAINAGE STRATEGY REPORT - PI ANGEL COURT - ISSUE Accompanying report · 14 May 2025
  • SUSTAINABILITY STATEMENT Other · 14 May 2025
  • TM703 - RE01 LANDSCAPE STATEMENT-COMPRESSED Other · 14 May 2025
  • FINANCIAL VIABILITY ASSESSMENT Other · 14 May 2025
  • FINANCIAL VIABILITY ASSESSMENT APPENDICES Other · 14 May 2025
  • FINANCIAL VIABILITY ASSESSMENT APPENDICES Other · 14 May 2025
  • FINANCIAL VIABILITY ASSESSMENT APPENDICES Other · 14 May 2025
  • FINANCIAL VIABILITY ASSESSMENT APPENDICES Other · 14 May 2025
  • FINANCIAL VIABILITY ASSESSMENT APPENDICES Other · 14 May 2025
  • 5491-DESIGN AND ACCESS STATEMENT_1 OF 10 Report - Design & Access Statement/Report · 14 May 2025
  • 5491-DESIGN AND ACCESS STATEMENT_2 OF 10 Report - Design & Access Statement/Report · 14 May 2025
  • 5491-DESIGN AND ACCESS STATEMENT_3 OF 10 Report - Design & Access Statement/Report · 14 May 2025
  • 5491-DESIGN AND ACCESS STATEMENT_4 OF 10 Report - Design & Access Statement/Report · 14 May 2025
  • 5491-DESIGN AND ACCESS STATEMENT_5 OF 10 Report - Design & Access Statement/Report · 14 May 2025
  • 5491-DESIGN AND ACCESS STATEMENT_6 OF 10 Report - Design & Access Statement/Report · 14 May 2025
  • 5491-DESIGN AND ACCESS STATEMENT_7 OF 10 Report - Design & Access Statement/Report · 14 May 2025
  • 5491-DESIGN AND ACCESS STATEMENT_8 OF 10 Report - Design & Access Statement/Report · 14 May 2025
  • 5491-DESIGN AND ACCESS STATEMENT_9 OF 10 Report - Design & Access Statement/Report · 14 May 2025
  • 5491-DESIGN AND ACCESS STATEMENT_10 OF 10 Report - Design & Access Statement/Report · 14 May 2025
  • EXISTING EASTERN STREETSCENE -A Drawing · 14 May 2025
  • 5491-PL-001-LOCATION PLAN-A Site Plan · 14 May 2025
  • EXISTING SITE PLAN-A Site Plan · 14 May 2025
  • EXISTING SUB BASEMENT-A Drawing · 14 May 2025
  • EXISTING BASEMENT-A Drawing · 14 May 2025
  • EXISTING GROUND FLOOR-A Drawing · 14 May 2025
  • EXISTING FIRST FLOOR-A Drawing · 14 May 2025
  • EXISTING SECOND FLOOR-A Drawing · 14 May 2025
  • EXISTING THIRD FLOOR-A Drawing · 14 May 2025
  • EXISTING FOURTH FLOOR-A Drawing · 14 May 2025
  • EXISTING FIFTH FLOOR-A Drawing · 14 May 2025
  • EXISTING SIXTH FLOOR-A Drawing · 14 May 2025
  • EXISTING ROOF-A Drawing · 14 May 2025
  • EXISTING EAST ELEVATION -A Drawing · 14 May 2025
  • EXISTING WEST ELEVATION -A Drawing · 14 May 2025
  • EXISTING NORTH AND SOUTH ELEVATIONS -A Drawing · 14 May 2025
  • EXISTING SECTION A -A Superseded drawing · 14 May 2025
  • EXISTING SECTIONS B AND C -A Superseded drawing · 14 May 2025
  • EXISTING SECTION D -A Superseded drawing · 14 May 2025
  • SUB BASEMENT FLOOR-DEMOLITION PLAN-A Superseded drawing · 14 May 2025
  • BASEMENT FLOOR-DEMOLITION PLAN-A Superseded drawing · 14 May 2025
  • GROUND FLOOR-DEMOLITION PLAN-A Superseded drawing · 14 May 2025
  • MEZZANINE FLOOR-DEMOLITION PLAN-A Superseded drawing · 14 May 2025
  • FIRST FLOOR-DEMOLITION PLAN-A Superseded drawing · 14 May 2025
  • SECOND FLOOR-DEMOLITION PLAN-A Superseded drawing · 14 May 2025
  • THIRD FLOOR-DEMOLITION PLAN-A Superseded drawing · 14 May 2025
  • FOURTH FLOOR-DEMOLITION PLAN-A Superseded drawing · 14 May 2025
  • FIFTH FLOOR-DEMOLITION PLAN-A Superseded drawing · 14 May 2025
  • ROOF -DEMOLITION PLAN-A Superseded drawing · 14 May 2025
  • EASTERN ELEVATION-A Drawing · 14 May 2025
  • WESTERN ELEVATION-A Drawing · 14 May 2025
  • NORTHERN AND SOUTHERN ELEVATION-A Drawing · 14 May 2025
  • PROPOSED FIFTH FLOOR -A Drawing · 14 May 2025
  • PROPOSED SIXTH FLOOR -A Superseded drawing · 14 May 2025
  • PROPOSED SEVENTH FLOOR -A Superseded drawing · 14 May 2025
  • PROPOSED EIGHTH FLOOR -A Drawing · 14 May 2025
  • PROPOSED ROOF FLOOR -A Superseded drawing · 14 May 2025
  • PROPOSED SITE PLAN -A Superseded drawing · 14 May 2025
  • PROPOSED BASEMENT -2 -A Drawing · 14 May 2025
  • PROPOSED BASEMENT -1 -A Drawing · 14 May 2025
  • *SUPERSEDED* Drawing · 14 May 2025
  • PROPOSED FIRST FLOOR -A Drawing · 14 May 2025
  • PROPOSED SECOND FLOOR -A Drawing · 14 May 2025
  • PROPOSED THIRD FLOOR -A Drawing · 14 May 2025
  • PROPOSED FOURTH FLOOR -A Drawing · 14 May 2025
  • PROPOSED EASTERN ELEVATION -A Superseded drawing · 14 May 2025
  • PROPOSED WESTERN ELEVATION -A Superseded drawing · 14 May 2025
  • PROPOSED SOUTHERN ELEVATION -A Superseded drawing · 14 May 2025
  • PROPOSED NORTHERN ELEVATION -A Superseded drawing · 14 May 2025
  • PROPOSED EASTERN STREETSCENE -A Superseded drawing · 14 May 2025
  • PROPOSED NO.9-10-FACADE CHANGES -A Superseded drawing · 14 May 2025
  • PROPOSED NO.11-FACADE CHANGES -A Superseded drawing · 14 May 2025
  • PROPOSED EAST GROUND FLOOR DETAIL -A Superseded drawing · 14 May 2025
  • PROPOSED ENTRANCE DETAIL -A Superseded drawing · 14 May 2025
  • PROPOSED EAST ELEVATION RENDER -A Superseded drawing · 14 May 2025
  • EXISTING WEST ELEVATION-RENDER -A Superseded drawing · 14 May 2025
  • PROPOSED WEST ELEVATION-RENDER -A Superseded drawing · 14 May 2025
  • PROPOSED SOUTH ELEVATION-RENDER -A Superseded drawing · 14 May 2025
  • PROPOSED NORTH ELEVATION-RENDER -A Superseded drawing · 14 May 2025
  • PROPOSED EAST STREETSCENE-RENDER -A Superseded drawing · 14 May 2025
  • PROPOSED SECTION A -A Superseded drawing · 14 May 2025
  • PROPOSED SECTION D -A Superseded drawing · 14 May 2025
  • PROPOSED MEZZANINE FLOOR -A Drawing · 14 May 2025
  • 5491-PL-900-ROOM MIX AND AREA SCHEDULE -A Other · 14 May 2025
  • ANGEL COURT PLANNING STATEMENT FINAL Report - Planning Statement/Report · 14 May 2025
  • FORM_1_CIL_ADDITIONAL_INFORMATION Other · 14 May 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 12 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 9 - 11 Angel Court London EC2R 7HB

    25/01602/PODC Submitted 14 Nov 2025 50 yards away

    Submission of the Highway Schedule of Condition Survey pursuant to Schedule 3 Paragraph 3.1 of the S106 Agreement dated 12 November 2025 (Planning Application Reference: 25/00646/FULL).

    Granted 3 docs
  • 9 - 11 Angel Court London EC2R 7HB

    25/01657/MDC Submitted 27 Nov 2025 50 yards away

    Submission of Traffic and Logistics Management Site Plan pursuant to condition 35 of planning permission 25/00646/FULL dated 12.11.2025.

    Granted Conditions 4 docs
  • 9 - 11 Angel Court London EC2R 7HB

    25/01740/MDC Submitted 11 Dec 2025 50 yards away

    Submission of a scheme in the form of an acoustic report compiled by a qualified specialist pursuant to condition 21 of planning permission 25/00646/FULL dated 12/11/2025.

    Granted Conditions 4 docs
  • 9 - 11 Angel Court London EC2R 7HP

    24/00352/NMA Submitted 5 Apr 2024 50 yards away

    Non Material Amendment to planning permission ref 22/00860/FULMAJ granted 07/03/2024 to amend condition 42 (approved plans) for the following design amendments (i) additional separate hotel entrance; (ii) ground floor elevational and fenestration alterations; (iii) addition of louvres above windows at levels 5-8; (iv) Public Realm alterations to front of site; (v) internal alterations at basement levels.

    Granted Amendments Windows or glazing 22 docs
  • 9 - 10 Angel Court London EC2R 7HP

    24/00458/MDC Submitted 7 May 2024 50 yards away

    Submission of a detailed site investigation to establish if the site is contaminated and to determine the potential for pollution of the water environment pursuant to condition 14 of planning permission 22/00860/FULMAJ dated 07/03/2024.

    Granted Conditions 18 docs
  • Development Site 9 - 11 Angel Court London

    22/00860/FULMAJ Submitted 8 Sep 2022 50 yards away

    Demolition of the existing buildings except the facade of 9-10 Angel Court up to 4th floor and the construction of a new building behind that refurbished facade and a replica facade of 11 Angel Court up to 3rd floor, over 3 basement levels, ground, mezzanine and 8 upper floors plus plant room, with a change of use from office (Class E) to hotel (Class C1) and ancillary uses, cycle storage and greening, together with landscaping to Angel Court and other associated works.

    Granted Full applications Demolition 147 docs
    Major scheme

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications