Skip to content
PlanIndex Get alerts
Menu

Planning application

New London House 6 London Street London EC3R 7LP

Granted City of London 25/00329/FULMAJ

Works: Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Partial demolition, refurbishment and extension of existing building for use as a hotel (Class C1), restaurant (Class E) and flexible cultural use (Class E (g)(i) / F1 / F2) including mechanical plant; disabled parking; cycle parking; greening and associated works; and retention of existing Public House (Sui Generis) and betting shop (Sui Generis). (Re-consultation due to amended documents).

As published by the council, reference 25/00329/FULMAJ

Application record

Reference
25/00329/FULMAJ
Status
Decided
Decision
Granted As published: Approved
Received
10 Mar 2025
Validated
10 Mar 2025
Decided
9 Jul 2026
Ward
Tower
Decision by
Delegated
Postcode
EC3R 7LP

Site history

Applications at this address on the City of London register

This site has had 2 applications since 2023: 1 approved, 0 refused.

  • 23/00088/FULL Withdrawn

    New London House 6 London Street London EC3R 7LP

    Installation of a flue at ground floor level.

    Decided 24 Jan 2024 Full applications

Timeline

Dates from the published record

  1. 10 Mar 2025

    Received by City of London

  2. 9 Jul 2026

    Decision issued: Approved

  3. 20 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

DP9 Ltd Agent

Active · incorporated 2004

2,662 applications on PlanIndex · across 36 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

London Hotel Holdings 2 Limited Applicant, registered in Dunstable

Active · incorporated 2023 · Dunstable

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

188 documents on file for this application

  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 09 Jul 2026
  • COMPLETED SECTION 106 AGREEMENT S106 Agreement · 08 Jul 2026
  • DRAFT SECTION 106 AGREEMENT Other · 12 Jun 2026
  • PROPOSED ELEVATION - NORTH Drawing · 20 Feb 2026
  • PROPOSED ELEVATION - WEST Drawing · 20 Feb 2026
  • PROPOSED ELEVATION - EAST Drawing · 20 Feb 2026
  • PROPOSED ELEVATION - SOUTH Drawing · 20 Feb 2026
  • PROPOSED ELEVATION - SOUTH 02 Drawing · 20 Feb 2026
  • PROPOSED ELEVATION - SOUTH 01 Drawing · 20 Feb 2026
  • PROPOSED GROUND FLOORPLAN Drawing · 20 Feb 2026
  • PROPOSED GROUND FLOORPLAN C Drawing · 20 Feb 2026
  • PROPOSED GROUND FLOORPLAN D Drawing · 20 Feb 2026
  • PROPOSED LOWER GROUND FLOORPLAN WHEELCHAIR USERS ESCAPE STRATEGY Drawing · 20 Feb 2026
  • PROPOSED ELEVATION - GATES AND SPANDREL Drawing · 20 Feb 2026
  • PROPOSED ELEVATION - GATES AND SPANDREL Drawing · 20 Feb 2026
  • PROPOSED ELEVATION - EAST Drawing · 13 Oct 2025
  • PROPOSED ELEVATION - SOUTH Drawing · 13 Oct 2025
  • PROPOSED ELEVATION - SOUTH 02 Drawing · 13 Oct 2025
  • PROPOSED ELEVATION - SOUTH 01 Drawing · 13 Oct 2025
  • TRANSPORT TECHNICAL NOTE Other · 13 Oct 2025
  • TYPICAL BIRDS MOUTH BAY (WEST AND SOUTH) Drawing · 13 Oct 2025
  • TYPICAL FACADE BAY (SOUTH AND EAST) Drawing · 13 Oct 2025
  • TYPICAL FACADE BAY (NORTH AND WEST) Drawing · 13 Oct 2025
  • PROPOSED ELEVATION - NORTH Drawing · 13 Oct 2025
  • PROPOSED ELEVATION - WEST Drawing · 13 Oct 2025
  • COMMENTS - NETWORK RAIL Consultee Comment · 29 Sep 2025
  • LETTER FROM THE UNESCO WORLD HERITAGE CENTRE Correspondence In · 03 Jul 2025
  • TECHNICAL REVIEW ICOMOS Correspondence In · 03 Jul 2025
  • REPRESENTATION - EASTERN CITY BUSINESS IMPROVEMENT DISTRICT Public Comment · 27 Jun 2025
  • COMMENTS-LONDON BOROUGH OF HACKNEY Consultee Comment · 17 Jun 2025
  • REPRESENTATION - MR. B & MRS. J WONG Public Comment · 11 Jun 2025
  • COMMENTS - PORT OF LONDON AUTHORITY Consultee Comment · 09 Jun 2025
  • COMMENTS - HISTORIC ENGLAND (2) Consultee Comment · 04 Jun 2025
  • COMMENTS - HISTORIC ENGLAND (1) Consultee Comment · 04 Jun 2025
  • COMMENTS - TFL Consultee Comment · 04 Jun 2025
  • COMMENTS-LONDON BOROUGH OF HACKNEY Consultee Comment · 27 May 2025
  • COMMENTS-LONDON CITY AIRPORT Consultee Comment · 22 May 2025
  • COMMENTS - HEATHROW AIRPORT LTD Consultee Comment · 22 May 2025
  • COMMENTS - HSE Consultee Comment · 22 May 2025
  • COMMENTS - NATS Consultee Comment · 22 May 2025
  • AIR QUALITY IMPACT ASSESSMENT Accompanying report · 14 May 2025
  • COMMENTS - NETWORK RAIL Consultee Comment · 06 May 2025
  • DAYLIGHT,SUNLIGHT & OVERSHADOWING REPORT Accompanying report · 28 Apr 2025
  • COMMENTS-HEALTH AND SAFETY EXECUTIVE Consultee Comment · 22 Apr 2025
  • AIR QUALITY IMPACT ASSESSMENT Accompanying report · 16 Apr 2025
  • BREEAM UK NC V6: WST05 ADAPTION TO CLIMATE CHANGE Accompanying report · 15 Apr 2025
  • COMMENTS-THE SOCIETY FOR THE PROTECTION OF ANCIENT BUILDINGS (SPAB) General Comment · 14 Apr 2025
  • COMMENTS - TFL Consultee Comment · 11 Apr 2025
  • COMMENTS - TOWER HAMLETS Consultee Comment · 07 Apr 2025
  • COMMENTS - GLAAS HISTORIC ENGLAND Consultee Comment · 04 Apr 2025
  • COMMENTS - THAMES WATER Consultee Comment · 03 Apr 2025
  • COMMENTS - CITY AIRPORT Consultee Comment · 31 Mar 2025
  • ACKNOWLEDGEMENT LETTER TOWER HAMLETS Consultee Comment · 28 Mar 2025
  • COMMENTS - NATS Consultee Comment · 28 Mar 2025
  • GENERAL ARRANGEMENT Drawing · 27 Mar 2025
  • COMMENTS - TFL Consultee Comment · 26 Mar 2025
  • COMMENTS - HEATHROW AIRPORT Consultee Comment · 26 Mar 2025
  • LPG_-_WLCA_ASSESSMENT_TEMPLATE Other · 11 Mar 2025
  • STATUTORY BIODIVERSITY METRIC Other · 11 Mar 2025
  • GLA_CIRCULAR_ECONOMY_STATEMENTS Other · 11 Mar 2025
  • APPLICATIONFORMREDACTED Application Form · 10 Mar 2025
  • EXISTING ELEVATION - SOUTH 01 Drawing · 10 Mar 2025
  • EXISTING ELEVATION - SOUTH 02 Drawing · 10 Mar 2025
  • EXISTING ELEVATION - EAST Drawing · 10 Mar 2025
  • EXISTING ELEVATION - WEST Drawing · 10 Mar 2025
  • EXISTING ELEVATION - NORTH Drawing · 10 Mar 2025
  • EXISTING FIRST FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING SECOND FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING THIRD FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING FOURTH FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING FIFTH FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING SIXTH FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING SEVENTH FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING EIGHTH FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING NINTH FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING TENTH FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING ELEVENTH FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING TWELFTH FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING ROOF PLAN Drawing · 10 Mar 2025
  • EXISTING BASEMENT TWO Drawing · 10 Mar 2025
  • EXISTING BASEMENT ONE Drawing · 10 Mar 2025
  • EXISTING LOWER GROUND FLOORPLAN Drawing · 10 Mar 2025
  • EXISTING GROUND FLOORPLAN Drawing · 10 Mar 2025
  • SECTION 1-1 Drawing · 10 Mar 2025
  • SECTION 2-2 Drawing · 10 Mar 2025
  • SECTION 3-3 Drawing · 10 Mar 2025
  • DEMOLITION ELEVATION SOUTH 01 Drawing · 10 Mar 2025
  • DEMOLITION ELEVATION SOUTH 02 Drawing · 10 Mar 2025
  • DEMOLITION ELEVATION EAST Drawing · 10 Mar 2025
  • DEMOLITION ELEVATION WEST Drawing · 10 Mar 2025
  • DEMOLITION ELEVATION NORTH Drawing · 10 Mar 2025
  • DEMOLITION - GROUND FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - FIRST FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - SECOND FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - THIRD FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - FOURTH FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - FIFTH FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - SIXTH FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - SEVENTH FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - EIGHTH FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - NINTH FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - TENTH FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - ELEVENTH FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - TWELFTH FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION - ROOF PLAN Drawing · 10 Mar 2025
  • DEMOLITION PLAN - BASEMENT TWO Drawing · 10 Mar 2025
  • DEMOLITION PLAN - BASEMENT ONE Drawing · 10 Mar 2025
  • DEMOLITION - LOWER GROUND FLOORPLAN Drawing · 10 Mar 2025
  • DEMOLITION SECTION 2-2 Drawing · 10 Mar 2025
  • PROPOSED ELEVATION - SOUTH 02 Drawing · 10 Mar 2025
  • PROPOSED ELEVATION - WEST Drawing · 10 Mar 2025
  • PROPOSED SIXTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED SEVENTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED EIGHTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED NINTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED TENTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED ELEVENTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED TWELFTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED SIXTEENTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED SECOND FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED THIRD FLOORPLAN Drawing · 10 Mar 2025
  • SECTION 3-3 Drawing · 10 Mar 2025
  • FLOOD RISK ASSESSMENT Accompanying report · 10 Mar 2025
  • SUSTAINABLE DRAINAGE STRATEGY & FOUL SEWAGE ASSESSMENT REPORT Accompanying report · 10 Mar 2025
  • SUSTAINABLE DRAINAGE STRATEGY & FOUL SEWAGE ASSESSMENT REPORT Accompanying report · 10 Mar 2025
  • HERITAGE IMPACT ASSESSMENT - TOWER OF LONDON Accompanying report · 10 Mar 2025
  • SCI NEW LONDON HOUSE_CONCILIO_FINAL_17 JAN-COMPRESSED Accompanying report · 10 Mar 2025
  • SUSTAINABILITY INTRODUCTION_FINAL Accompanying report · 10 Mar 2025
  • SUSTAINABILITY PLANNING REPORTS - VOLUME 2 OF 6 Accompanying report · 10 Mar 2025
  • SUSTAINABLE DESIGN STATEMENT_FINAL Accompanying report · 10 Mar 2025
  • SUSTAINABILITY PLANNING REPORTS - VOLUME 6 OF 6 Accompanying report · 10 Mar 2025
  • SUSTAINABILITY PLANNING REPORTS - VOLUME 5 OF 6 Accompanying report · 10 Mar 2025
  • NEW LONDON HOUSE 18TH DEC 24 Drawing · 10 Mar 2025
  • CIRCULAR ECONOMY STATEMENT_FINAL Accompanying report · 10 Mar 2025
  • GLA_CIRCULAR_ECONOMY_STATEMENTS_NEW LONDON HOUSE Drawing · 10 Mar 2025
  • ENERGY STRATEGY REPORT (ESR) REVA Accompanying report · 10 Mar 2025
  • TRAVEL PLAN Report - Travel Plan · 10 Mar 2025
  • NEWLONDONHOUSE-OUTDOOR-THERMAL-COMFORT-V4 Other · 10 Mar 2025
  • DELIVERY AND SERVICING PLAN Accompanying report · 10 Mar 2025
  • CONSTRUCTION LOGISTICS PLAN Accompanying report · 10 Mar 2025
  • DEMOLITION SECTION 3-3 Drawing · 10 Mar 2025
  • DEMOLITION SECTION 1-1 Drawing · 10 Mar 2025
  • PROPOSED ELEVATION - SOUTH 01 Drawing · 10 Mar 2025
  • PROPOSED ELEVATION - NORTH Drawing · 10 Mar 2025
  • PROPOSED THIRTEENTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED FOURTEENTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED FIFTHTEENTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED ROOF PLAN Drawing · 10 Mar 2025
  • PROPOSED BASEMENT TWO Drawing · 10 Mar 2025
  • PROPOSED BASEMENT ONE Drawing · 10 Mar 2025
  • PROPOSED LOWER GROUND FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED LWF MEZZANINE FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED GROUND FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED FIRST FLOORPLAN Drawing · 10 Mar 2025
  • NOISE IMPACT ASSESSMENT REV 03 Report - Acoustic/Noise Report · 10 Mar 2025
  • PR-B703 FENCHURCH STREET AQA V4 Other · 10 Mar 2025
  • NEW LONDON HOUSE ECOLOGY REPORT 15TH JANUARY 2025 Accompanying report · 10 Mar 2025
  • NEW LONDON HOUSE FENCHURCH NET BIODIVERSITY CHANGE REPORT 15-01-25 Accompanying report · 10 Mar 2025
  • P3431_NEW LONDON HOUSE_DLSL REPORT_FEB 25_R10_V1-COMPRESSED Other · 10 Mar 2025
  • NEWLONDONHOUSE-CFD-WMA-REPORT-R5 Accompanying report · 10 Mar 2025
  • NEW LONDON HOUSE FVA FINAL WITH APPENDICES Other · 10 Mar 2025
  • WHI161224R E-FIRE STATEMENT - NEW LONDON HOUSE FENCHURCH STREET (REV 1) Accompanying report · 10 Mar 2025
  • HEALTHY STREETS TRANSPORT ASSESSMENT Report - Transport Statement/Report · 10 Mar 2025
  • 001-SITE PLAN Site Plan · 10 Mar 2025
  • NEW LONDON HOUSE COVER LETTER Cover Letter · 10 Mar 2025
  • 250226 FINAL 6NLH HTVIA HR COMPRESSED_PART1 Accompanying report · 10 Mar 2025
  • 250226 FINAL 6NLH HTVIA HR COMPRESSED_PART2 Accompanying report · 10 Mar 2025
  • 250226 FINAL 6NLH HTVIA HR COMPRESSED_PART3 Accompanying report · 10 Mar 2025
  • 250226 FINAL 6NLH HTVIA HR COMPRESSED_PART4 Accompanying report · 10 Mar 2025
  • NEW LONDON HOUSE PLANNING STATEMENT (FINAL) Report - Planning Statement/Report · 10 Mar 2025
  • 6030-DAS_PART1- Report - Design & Access Statement/Report · 10 Mar 2025
  • 6030-DAS_PART2- Report - Design & Access Statement/Report · 10 Mar 2025
  • 6030-DAS_PART3- Report - Design & Access Statement/Report · 10 Mar 2025
  • 6030-DAS_PART4- Report - Design & Access Statement/Report · 10 Mar 2025
  • 6030-DAS_PART5- Report - Design & Access Statement/Report · 10 Mar 2025
  • 6030-DAS_PART6- Report - Design & Access Statement/Report · 10 Mar 2025
  • NEW LONDON HOUSE CIL FORM PLUS APPENDIX Other · 10 Mar 2025
  • PORPOSED ELEVATION - SOUTH 03 Drawing · 10 Mar 2025
  • PROPOSED ELEVATION - EAST Drawing · 10 Mar 2025
  • PROPOSED FOURTH FLOORPLAN Drawing · 10 Mar 2025
  • PROPOSED FIFTH FLOORPLAN Drawing · 10 Mar 2025
  • SECTION 1-1 Drawing · 10 Mar 2025
  • SECTION 2-2 Drawing · 10 Mar 2025
  • SECTION 4-4 Drawing · 10 Mar 2025
  • LANDSCAPE STATEMENT Accompanying report · 10 Mar 2025
  • LPG_-_WLCA_ASSESSMENT_TEMPLATE_PLANNING_NEW LONDON HOUSE Drawing · 10 Mar 2025
  • VOLT_HIA_NEWLONDONHOUSE_ISSUE Accompanying report · 10 Mar 2025
  • VOLT_SOCIO-ECONOMICSTATEMENT_ISSUE Accompanying report · 10 Mar 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 9 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • 35 Crutched Friars London EC3N 2AE

    25/01472/5REG Submitted 20 Oct 2025 50 yards away

    99% historically approved · decision due ~15 Dec

    Installation of 1No. equipment housing cabinet and ancillary development thereto.

    Awaiting decision 3 docs
  • New London House 6 London Street London EC3R 7LP

    23/00088/FULL Submitted 30 Jan 2023 50 yards away

    Installation of a flue at ground floor level.

    Withdrawn Full applications 6 docs
  • Flat 2 41 Crutched Friars London EC3N 2AE

    19/01164/LDC Submitted 5 Nov 2019 50 yards away

    Details of the chimney piece, grate and hearth pursuant to listed building consent 19/00224/LBC condition 2a. Submission of a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects for the construction works pursuant to condition 4 of planning permission dated 22nd March 2019 (18/01122/FULL).

    Granted Lawful development 7 docs
  • Friary Court 65 Crutched Friars London EC3N 2AE

    24/00002/MDC Submitted 3 Jan 2024 50 yards away

    Submission of details of rainwater harvesting and greywater collection pursuant to condition 27 of planning permission 22/00882/FULMAJ (dated 27.06.2023)

    Granted Conditions 3 docs
  • 65 Crutched Friars London EC3N 2AE

    23/01346/MDC Submitted 6 Dec 2023 50 yards away

    Submission of details of utility connections pursuant to condition 11 of planning permission 22/00882/FULMAJ (dated 27.06.2022).

    Granted Conditions 17 docs
  • Friary Court 65 Crutched Friars, London, EC3N 2AE

    PA/26/01063 Submitted 19 Jun 2026 50 yards away

    Application under Section 73 of the Town and Country Planning Act 1990 (as amended) in relation to planning permission 22/00882/FULMAJ dated 27 June 2023 to vary Condition 48 (Cycle Parking Facilities) to reduce the number of cycle parking spaces in line with documented utilisation by users of comparable PBSA buildings; vary Condition 70 (Museum Use Floorspace) to remove reference to the approved quantum of museum floorspace; and vary Condition 71 (Approved Drawings) to reflect: (i) internal amendments to the museum layout at Ground and First Floors; (ii) the replacement of museum floorspace at Level 2 with 33 additional PBSA rooms and increased amenity space; (iii) the installation of external plant and associated plant enclosure at Level 3, together with a freestanding frame to provide greening; and (iv) consequential amendments relating to the revised cycle parking provision and museum floorspace, alongside a Deed of Variation to the Section 106 Agreement to amend the definition of Museum Space, update the Museum Space plans to reflect the Section 73 amendments, and provide that the Deed of Variation come into effect upon implementation of the Section 73 permission.

    Granted 2 docs