Planning application
New London House 6 London Street London EC3R 7LP
Works: Extension Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Partial demolition, refurbishment and extension of existing building for use as a hotel (Class C1), restaurant (Class E) and flexible cultural use (Class E (g)(i) / F1 / F2) including mechanical plant; disabled parking; cycle parking; greening and associated works; and retention of existing Public House (Sui Generis) and betting shop (Sui Generis). (Re-consultation due to amended documents).
As published by the council, reference 25/00329/FULMAJ
Application record
- Reference
- 25/00329/FULMAJ
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 10 Mar 2025
- Validated
- 10 Mar 2025
- Decided
- 9 Jul 2026
- Ward
- Tower
- Decision by
- Delegated
- Postcode
- EC3R 7LP
Site history
Applications at this address on the City of London register
This site has had 2 applications since 2023: 1 approved, 0 refused.
-
23/00088/FULL Withdrawn
New London House 6 London Street London EC3R 7LP
Installation of a flue at ground floor level.
Timeline
Dates from the published record
-
10 Mar 2025
Received by City of London
-
9 Jul 2026
Decision issued: Approved
-
20 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,662 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordLondon Hotel Holdings 2 Limited Applicant, registered in Dunstable
Active · incorporated 2023 · Dunstable
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
188 documents on file for this application
- PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL)
- COMPLETED SECTION 106 AGREEMENT
- DRAFT SECTION 106 AGREEMENT
- PROPOSED ELEVATION - NORTH
- PROPOSED ELEVATION - WEST
- PROPOSED ELEVATION - EAST
- PROPOSED ELEVATION - SOUTH
- PROPOSED ELEVATION - SOUTH 02
- PROPOSED ELEVATION - SOUTH 01
- PROPOSED GROUND FLOORPLAN
- PROPOSED GROUND FLOORPLAN C
- PROPOSED GROUND FLOORPLAN D
- PROPOSED LOWER GROUND FLOORPLAN WHEELCHAIR USERS ESCAPE STRATEGY
- PROPOSED ELEVATION - GATES AND SPANDREL
- PROPOSED ELEVATION - GATES AND SPANDREL
- PROPOSED ELEVATION - EAST
- PROPOSED ELEVATION - SOUTH
- PROPOSED ELEVATION - SOUTH 02
- PROPOSED ELEVATION - SOUTH 01
- TRANSPORT TECHNICAL NOTE
- TYPICAL BIRDS MOUTH BAY (WEST AND SOUTH)
- TYPICAL FACADE BAY (SOUTH AND EAST)
- TYPICAL FACADE BAY (NORTH AND WEST)
- PROPOSED ELEVATION - NORTH
- PROPOSED ELEVATION - WEST
- COMMENTS - NETWORK RAIL
- LETTER FROM THE UNESCO WORLD HERITAGE CENTRE
- TECHNICAL REVIEW ICOMOS
- REPRESENTATION - EASTERN CITY BUSINESS IMPROVEMENT DISTRICT
- COMMENTS-LONDON BOROUGH OF HACKNEY
- REPRESENTATION - MR. B & MRS. J WONG
- COMMENTS - PORT OF LONDON AUTHORITY
- COMMENTS - HISTORIC ENGLAND (2)
- COMMENTS - HISTORIC ENGLAND (1)
- COMMENTS - TFL
- COMMENTS-LONDON BOROUGH OF HACKNEY
- COMMENTS-LONDON CITY AIRPORT
- COMMENTS - HEATHROW AIRPORT LTD
- COMMENTS - HSE
- COMMENTS - NATS
- AIR QUALITY IMPACT ASSESSMENT
- COMMENTS - NETWORK RAIL
- DAYLIGHT,SUNLIGHT & OVERSHADOWING REPORT
- COMMENTS-HEALTH AND SAFETY EXECUTIVE
- AIR QUALITY IMPACT ASSESSMENT
- BREEAM UK NC V6: WST05 ADAPTION TO CLIMATE CHANGE
- COMMENTS-THE SOCIETY FOR THE PROTECTION OF ANCIENT BUILDINGS (SPAB)
- COMMENTS - TFL
- COMMENTS - TOWER HAMLETS
- COMMENTS - GLAAS HISTORIC ENGLAND
- COMMENTS - THAMES WATER
- COMMENTS - CITY AIRPORT
- ACKNOWLEDGEMENT LETTER TOWER HAMLETS
- COMMENTS - NATS
- GENERAL ARRANGEMENT
- COMMENTS - TFL
- COMMENTS - HEATHROW AIRPORT
- LPG_-_WLCA_ASSESSMENT_TEMPLATE
- STATUTORY BIODIVERSITY METRIC
- GLA_CIRCULAR_ECONOMY_STATEMENTS
- APPLICATIONFORMREDACTED
- EXISTING ELEVATION - SOUTH 01
- EXISTING ELEVATION - SOUTH 02
- EXISTING ELEVATION - EAST
- EXISTING ELEVATION - WEST
- EXISTING ELEVATION - NORTH
- EXISTING FIRST FLOORPLAN
- EXISTING SECOND FLOORPLAN
- EXISTING THIRD FLOORPLAN
- EXISTING FOURTH FLOORPLAN
- EXISTING FIFTH FLOORPLAN
- EXISTING SIXTH FLOORPLAN
- EXISTING SEVENTH FLOORPLAN
- EXISTING EIGHTH FLOORPLAN
- EXISTING NINTH FLOORPLAN
- EXISTING TENTH FLOORPLAN
- EXISTING ELEVENTH FLOORPLAN
- EXISTING TWELFTH FLOORPLAN
- EXISTING ROOF PLAN
- EXISTING BASEMENT TWO
- EXISTING BASEMENT ONE
- EXISTING LOWER GROUND FLOORPLAN
- EXISTING GROUND FLOORPLAN
- SECTION 1-1
- SECTION 2-2
- SECTION 3-3
- DEMOLITION ELEVATION SOUTH 01
- DEMOLITION ELEVATION SOUTH 02
- DEMOLITION ELEVATION EAST
- DEMOLITION ELEVATION WEST
- DEMOLITION ELEVATION NORTH
- DEMOLITION - GROUND FLOORPLAN
- DEMOLITION - FIRST FLOORPLAN
- DEMOLITION - SECOND FLOORPLAN
- DEMOLITION - THIRD FLOORPLAN
- DEMOLITION - FOURTH FLOORPLAN
- DEMOLITION - FIFTH FLOORPLAN
- DEMOLITION - SIXTH FLOORPLAN
- DEMOLITION - SEVENTH FLOORPLAN
- DEMOLITION - EIGHTH FLOORPLAN
- DEMOLITION - NINTH FLOORPLAN
- DEMOLITION - TENTH FLOORPLAN
- DEMOLITION - ELEVENTH FLOORPLAN
- DEMOLITION - TWELFTH FLOORPLAN
- DEMOLITION - ROOF PLAN
- DEMOLITION PLAN - BASEMENT TWO
- DEMOLITION PLAN - BASEMENT ONE
- DEMOLITION - LOWER GROUND FLOORPLAN
- DEMOLITION SECTION 2-2
- PROPOSED ELEVATION - SOUTH 02
- PROPOSED ELEVATION - WEST
- PROPOSED SIXTH FLOORPLAN
- PROPOSED SEVENTH FLOORPLAN
- PROPOSED EIGHTH FLOORPLAN
- PROPOSED NINTH FLOORPLAN
- PROPOSED TENTH FLOORPLAN
- PROPOSED ELEVENTH FLOORPLAN
- PROPOSED TWELFTH FLOORPLAN
- PROPOSED SIXTEENTH FLOORPLAN
- PROPOSED SECOND FLOORPLAN
- PROPOSED THIRD FLOORPLAN
- SECTION 3-3
- FLOOD RISK ASSESSMENT
- SUSTAINABLE DRAINAGE STRATEGY & FOUL SEWAGE ASSESSMENT REPORT
- SUSTAINABLE DRAINAGE STRATEGY & FOUL SEWAGE ASSESSMENT REPORT
- HERITAGE IMPACT ASSESSMENT - TOWER OF LONDON
- SCI NEW LONDON HOUSE_CONCILIO_FINAL_17 JAN-COMPRESSED
- SUSTAINABILITY INTRODUCTION_FINAL
- SUSTAINABILITY PLANNING REPORTS - VOLUME 2 OF 6
- SUSTAINABLE DESIGN STATEMENT_FINAL
- SUSTAINABILITY PLANNING REPORTS - VOLUME 6 OF 6
- SUSTAINABILITY PLANNING REPORTS - VOLUME 5 OF 6
- NEW LONDON HOUSE 18TH DEC 24
- CIRCULAR ECONOMY STATEMENT_FINAL
- GLA_CIRCULAR_ECONOMY_STATEMENTS_NEW LONDON HOUSE
- ENERGY STRATEGY REPORT (ESR) REVA
- TRAVEL PLAN
- NEWLONDONHOUSE-OUTDOOR-THERMAL-COMFORT-V4
- DELIVERY AND SERVICING PLAN
- CONSTRUCTION LOGISTICS PLAN
- DEMOLITION SECTION 3-3
- DEMOLITION SECTION 1-1
- PROPOSED ELEVATION - SOUTH 01
- PROPOSED ELEVATION - NORTH
- PROPOSED THIRTEENTH FLOORPLAN
- PROPOSED FOURTEENTH FLOORPLAN
- PROPOSED FIFTHTEENTH FLOORPLAN
- PROPOSED ROOF PLAN
- PROPOSED BASEMENT TWO
- PROPOSED BASEMENT ONE
- PROPOSED LOWER GROUND FLOORPLAN
- PROPOSED LWF MEZZANINE FLOORPLAN
- PROPOSED GROUND FLOORPLAN
- PROPOSED FIRST FLOORPLAN
- NOISE IMPACT ASSESSMENT REV 03
- PR-B703 FENCHURCH STREET AQA V4
- NEW LONDON HOUSE ECOLOGY REPORT 15TH JANUARY 2025
- NEW LONDON HOUSE FENCHURCH NET BIODIVERSITY CHANGE REPORT 15-01-25
- P3431_NEW LONDON HOUSE_DLSL REPORT_FEB 25_R10_V1-COMPRESSED
- NEWLONDONHOUSE-CFD-WMA-REPORT-R5
- NEW LONDON HOUSE FVA FINAL WITH APPENDICES
- WHI161224R E-FIRE STATEMENT - NEW LONDON HOUSE FENCHURCH STREET (REV 1)
- HEALTHY STREETS TRANSPORT ASSESSMENT
- 001-SITE PLAN
- NEW LONDON HOUSE COVER LETTER
- 250226 FINAL 6NLH HTVIA HR COMPRESSED_PART1
- 250226 FINAL 6NLH HTVIA HR COMPRESSED_PART2
- 250226 FINAL 6NLH HTVIA HR COMPRESSED_PART3
- 250226 FINAL 6NLH HTVIA HR COMPRESSED_PART4
- NEW LONDON HOUSE PLANNING STATEMENT (FINAL)
- 6030-DAS_PART1-
- 6030-DAS_PART2-
- 6030-DAS_PART3-
- 6030-DAS_PART4-
- 6030-DAS_PART5-
- 6030-DAS_PART6-
- NEW LONDON HOUSE CIL FORM PLUS APPENDIX
- PORPOSED ELEVATION - SOUTH 03
- PROPOSED ELEVATION - EAST
- PROPOSED FOURTH FLOORPLAN
- PROPOSED FIFTH FLOORPLAN
- SECTION 1-1
- SECTION 2-2
- SECTION 4-4
- LANDSCAPE STATEMENT
- LPG_-_WLCA_ASSESSMENT_TEMPLATE_PLANNING_NEW LONDON HOUSE
- VOLT_HIA_NEWLONDONHOUSE_ISSUE
- VOLT_SOCIO-ECONOMICSTATEMENT_ISSUE
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 9 July 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
35 Crutched Friars London EC3N 2AE
99% historically approved · decision due ~15 Dec
Installation of 1No. equipment housing cabinet and ancillary development thereto.
Awaiting decision 3 docs -
New London House 6 London Street London EC3R 7LP
Installation of a flue at ground floor level.
Withdrawn Full applications 6 docs -
Flat 2 41 Crutched Friars London EC3N 2AE
Details of the chimney piece, grate and hearth pursuant to listed building consent 19/00224/LBC condition 2a. Submission of a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects for the construction works pursuant to condition 4 of planning permission dated 22nd March 2019 (18/01122/FULL).
Granted Lawful development 7 docs -
Friary Court 65 Crutched Friars London EC3N 2AE
Submission of details of rainwater harvesting and greywater collection pursuant to condition 27 of planning permission 22/00882/FULMAJ (dated 27.06.2023)
Granted Conditions 3 docs -
65 Crutched Friars London EC3N 2AE
Submission of details of utility connections pursuant to condition 11 of planning permission 22/00882/FULMAJ (dated 27.06.2022).
Granted Conditions 17 docs -
Friary Court 65 Crutched Friars, London, EC3N 2AE
Application under Section 73 of the Town and Country Planning Act 1990 (as amended) in relation to planning permission 22/00882/FULMAJ dated 27 June 2023 to vary Condition 48 (Cycle Parking Facilities) to reduce the number of cycle parking spaces in line with documented utilisation by users of comparable PBSA buildings; vary Condition 70 (Museum Use Floorspace) to remove reference to the approved quantum of museum floorspace; and vary Condition 71 (Approved Drawings) to reflect: (i) internal amendments to the museum layout at Ground and First Floors; (ii) the replacement of museum floorspace at Level 2 with 33 additional PBSA rooms and increased amenity space; (iii) the installation of external plant and associated plant enclosure at Level 3, together with a freestanding frame to provide greening; and (iv) consequential amendments relating to the revised cycle parking provision and museum floorspace, alongside a Deed of Variation to the Section 106 Agreement to amend the definition of Museum Space, update the Museum Space plans to reflect the Section 73 amendments, and provide that the Deed of Variation come into effect upon implementation of the Section 73 permission.
Granted 2 docs