Skip to content
PlanIndex Get alerts
Menu

Planning application

1 St Martin's-le-grand London EC1A 4AS

Granted City of London 24/01173/FULL Full Planning Permission

Works: Extension Roofing Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Partial demolition, refurbishment, alteration and extension of the existing building to provide new office (Class E) floorspace and ground floor flexible commercial floorspace (Class E/Class F1) and drinking establishment (Sui Generis) with new roof terraces, soft and hard landscaping, pedestrian, cycle and vehicle access, cycle parking, associated highways works and other works associated with the development.

As published by the council, reference 24/01173/FULL

Application record

Reference
24/01173/FULL
Type
Full Planning Permission
Status
Decided
Decision
Granted As published: Approved
Received
6 Nov 2024
Validated
7 Nov 2024
Decided
4 Sep 2025
Ward
Cheap
Decision by
Delegated
Postcode
EC1A 4AS

Site history

Applications at this address on the City of London register

This site has had 12 applications since 2024: 7 approved, 0 refused.

  • 26/01462/MDC Awaiting decision

    1 St Martin's-le-grand London EC1A 4AS

    Submission of Scheduled Monument Methodology Statement pursuant to condition 56 of planning permission 24/01173/FULL dated 04.09.2025.

    Submitted 15 Oct 2026
  • 26/01259/MDC Awaiting decision

    1 St Martin's-le-grand London EC1A 4AS

    Submission of details of Suicide Prevention Strategy pursuant to condition 47 of Planning Permission 24/01173/FULL dated 04.09.2025.

    Submitted 8 Sep 2026
  • 26/01258/MDC Granted

    1 St Martin's-le-grand London EC1A 4AS

    Submission of details of Highways Condition Survey pursuant to condition 20 of Planning Permission 24/01173/FULL dated 04.09.2025.

    Decided 2 Oct 2026
  • 26/01077/MDC Granted

    1 St Martin's-le-grand London EC1A 4AS

    Submission of Phase 1 and 2 Ground Investigation and Outline Remediation Strategy Report pursuant to discharge of conditions 3 and 4 of planning permission 24/01173/FULL dated 04.09.2025.

    Decided 5 Oct 2026
  • 26/01013/PODC Granted

    1 St Martin's-le-grand London EC1A 4AS

    Submission of the Local Training, Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3 Paragraph 3.2 of the S106 Agreement dated 04 September 2025 (Planning Application Reference: 24/01173/FULL).

    Decided 24 Aug 2026
  • 26/00976/MDC Awaiting decision

    1 St Martin's-le-grand London EC1A 4AS

    Submission of detail of Demolition and Construction Mitigation Measures Plan, details of confirmation of Non-Road Mobile Machinery Register, and a Level 4 Historic Building Recording has been carried out pursuant to conditions 2, 6 and 57 of Planning Permission 24/01173/FULL dated 07.07.2025.

    Submitted 8 Jul 2026
  • 26/00953/MDC Granted

    1 St Martin's-le-grand London EC1A 4AS

    Submission of Highways Condition Survey pursuant to condition 20 of planning permission 24/01173/FULL dated 07.07.2025.

    Decided 9 Jul 2026
  • 26/00955/PODC Granted

    1 St Martin's-le-grand London EC1A 4AS

    Submission of the Highway Schedule of Condition Survey pursuant to Schedule 3 Paragraph 6.1 of the S106 Agreement dated 04 September 2025 (Planning Application Reference: 24/01173/FULL).

    Decided 17 Jul 2026
  • 26/00923/MDC Awaiting decision

    1 St Martin's-le-grand London EC1A 4AS

    Submission of drawings and Written Scheme of Investigation pursuant to discharge of conditions 19 and 59 (part a) of planning permission 24/01173/FULL dated 04.09.2025.

    Submitted 29 Jun 2026
  • 26/00770/MDC Awaiting decision

    1 St Martin's-le-grand London EC1A 4AS

    Submission of details pursuant to condition 18 and 30(a) of Planning Permission 24/01173/FULL dated 04.09.2025.

    Submitted 27 May 2026 Conditions

Timeline

Dates from the published record

  1. 6 Nov 2024

    Received by City of London

  2. 7 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 4 Sep 2025

    Decision issued: Approved

  4. 25 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

11 later applications on the register refer to this one:

  • 26/01462/MDC Awaiting decision

    1 St Martin's-le-grand London EC1A 4AS

    Submission of Scheduled Monument Methodology Statement pursuant to condition 56 of planning permission 24/01173/FULL dated 04.09.2025.

    Submitted 15 Oct 2026
  • 26/01259/MDC Awaiting decision

    1 St Martin's-le-grand London EC1A 4AS

    Submission of details of Suicide Prevention Strategy pursuant to condition 47 of Planning Permission 24/01173/FULL dated 04.09.2025.

    Submitted 8 Sep 2026
  • 26/01258/MDC Granted

    1 St Martin's-le-grand London EC1A 4AS

    Submission of details of Highways Condition Survey pursuant to condition 20 of Planning Permission 24/01173/FULL dated 04.09.2025.

    Decided 2 Oct 2026
  • 26/01077/MDC Granted

    1 St Martin's-le-grand London EC1A 4AS

    Submission of Phase 1 and 2 Ground Investigation and Outline Remediation Strategy Report pursuant to discharge of conditions 3 and 4 of planning permission 24/01173/FULL dated 04.09.2025.

    Decided 5 Oct 2026
  • 26/01013/PODC Granted

    1 St Martin's-le-grand London EC1A 4AS

    Submission of the Local Training, Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3 Paragraph 3.2 of the S106 Agreement dated 04 September 2025 (Planning Application Reference: 24/01173/FULL).

    Decided 24 Aug 2026
  • 26/00976/MDC Awaiting decision

    1 St Martin's-le-grand London EC1A 4AS

    Submission of detail of Demolition and Construction Mitigation Measures Plan, details of confirmation of Non-Road Mobile Machinery Register, and a Level 4 Historic Building Recording has been carried out pursuant to conditions 2, 6 and 57 of Planning Permission 24/01173/FULL dated 07.07.2025.

    Submitted 8 Jul 2026
  • 26/00953/MDC Granted

    1 St Martin's-le-grand London EC1A 4AS

    Submission of Highways Condition Survey pursuant to condition 20 of planning permission 24/01173/FULL dated 07.07.2025.

    Decided 9 Jul 2026
  • 26/00955/PODC Granted

    1 St Martin's-le-grand London EC1A 4AS

    Submission of the Highway Schedule of Condition Survey pursuant to Schedule 3 Paragraph 6.1 of the S106 Agreement dated 04 September 2025 (Planning Application Reference: 24/01173/FULL).

    Decided 17 Jul 2026
  • 26/00923/MDC Awaiting decision

    1 St Martin's-le-grand London EC1A 4AS

    Submission of drawings and Written Scheme of Investigation pursuant to discharge of conditions 19 and 59 (part a) of planning permission 24/01173/FULL dated 04.09.2025.

    Submitted 29 Jun 2026
  • 26/00770/MDC Awaiting decision

    1 St Martin's-le-grand London EC1A 4AS

    Submission of details pursuant to condition 18 and 30(a) of Planning Permission 24/01173/FULL dated 04.09.2025.

    Submitted 27 May 2026 Conditions
  • 26/00492/NMA Granted

    1 St Martin's-le-grand London EC1A 4AS

    Non-Material Amendment under Section 96a of the Town and Country Planning Act (1990) (as amended) to planning permission Ref. 24/01173/FULL dated 7 July 2025 to amend condition 26 (cycle parking) and condition 67 (approved plans) to enable minor alterations to (i) internal layouts, (ii) external terraces, (iii) plant equipment and associated screening, (iv) external elevations, (v) quantity of cycle parking provision, (vi) end-of-trip facilities, (vii) provision of green roofs, and (viii) the PV strategy.

    Decided 6 Jul 2026 Amendments

Who's behind it

Company information only, from the register and Companies House

Avison Young Limited Agent

1,571 applications on PlanIndex · across 181 councils · 94% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

HB Le Grand PTE LTD Applicant, registered in Singapore 138588

Registered · incorporated 2022 · Singapore 138588

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

197 documents on file for this application

  • DRAFT DEED OF AGREEMENT S106 Agreement · 04 Sep 2025
  • DRAFT DEED OF AGREEMENT Officers Report · 04 Sep 2025
  • PLANNING PERMISSION FOR DEVELOPMENT (CONDITIONAL) Decision · 04 Sep 2025
  • DEED OF AGREEMENT S106 Agreement · 04 Sep 2025
  • ADDENDUM REPORT Accompanying report · 04 Sep 2025
  • DRAFT S106 AGGREEMENT Other · 29 Aug 2025
  • PROPOSED PLANNING GROUND FLOOR PLAN Drawing · 01 Jul 2025
  • PROPOSED PLANNING SEVENTH FLOOR PLAN Drawing · 01 Jul 2025
  • PROPOSED PLANNING EIGHTH FLOOR PLAN Drawing · 01 Jul 2025
  • PROPOSED PLANNING NINTH FLOOR PLAN Drawing · 01 Jul 2025
  • PROPOSED PLANNING TENTH FLOOR PLAN Drawing · 01 Jul 2025
  • PROPOSED PLANNING ELEVENTH FLOOR PLAN Drawing · 01 Jul 2025
  • PROPOSED PLANNING TWELFTH FLOOR PLAN Drawing · 01 Jul 2025
  • PROPOSED PLANNING THIRTEENTH FLOOR PLAN Drawing · 01 Jul 2025
  • PROPOSED PLANNING SECTION A Drawing · 01 Jul 2025
  • PROPOSED PLANNING SECTION B Drawing · 01 Jul 2025
  • PROPOSED PLANNING ROOF PLAN Drawing · 01 Jul 2025
  • PROPOSED PLANNING SOUTH ELEVATION (ANGEL ST) Drawing · 01 Jul 2025
  • PROPOSED PLANNING WEST ELEVATION (KING EDWARD ST) Drawing · 01 Jul 2025
  • PROPOSED PLANNING NORTH / WEST ELEVATION A (POSTMAN'S PARK) Drawing · 01 Jul 2025
  • PROPOSED EXTERNAL ENVELOPE FACADE BAY 01 Drawing · 01 Jul 2025
  • PROPOSED EXTERNAL ENVELOPE FACADE BAY 02 Drawing · 01 Jul 2025
  • PROPOSED EXTERNAL ENVELOPE FACADE BAY 03 Drawing · 01 Jul 2025
  • PROPOSED EXTERNAL ENVELOPE FACADE BAY 04 Drawing · 01 Jul 2025
  • PROPOSED EXTERNAL ENVELOPE FACADE BAY 05 Drawing · 01 Jul 2025
  • TAVERNOR TVBHA STATEMENT + APPENDED HD VIEWS Accompanying report · 01 Jul 2025
  • PROPOSED PLANNING SECTION C Drawing · 01 Jul 2025
  • PROPOSED PLANNING EAST ELEVATION (ST MARTIN'S LE GRAND) Drawing · 01 Jul 2025
  • PROPOSED PLANNING NORTH ELEVATION (POSTMAN'S PARK) Drawing · 01 Jul 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 23 Jun 2025
  • ENERGY ASSESSMENT - PLANNING SUBMISSION Accompanying report · 12 Jun 2025
  • EMAIL CHAIN RE SUSTAINABILITY Correspondence In · 10 Jun 2025
  • WHOLE LIFE CARBON ASSESSMENT - PLANNING APPLICATION STAGE Accompanying report · 09 Jun 2025
  • EMAIL RE SUSTAINABILITY Correspondence In · 09 Jun 2025
  • EMAIL RE DLSL Correspondence In · 09 Jun 2025
  • CIRCULAR ECONOMY STATEMENT - PLANNING APPLICATION STAGE Accompanying report · 20 May 2025
  • SUSTAINABILITY STATEMENT Accompanying report · 20 May 2025
  • DRAWING SET - WINDOW LOCATIONS Drawing · 09 May 2025
  • PROPOSED PLANNING GROUND FLOOR PLAN Drawing · 30 Apr 2025
  • COMMENTS - SOUTHWARK Consultee Comment · 22 Apr 2025
  • COMMENTS - TFL Consultee Comment · 07 Mar 2025
  • COMMENTS - GLAAS Consultee Comment · 24 Feb 2025
  • COMMENTS - GREATER LONDON AUTHORITY Consultee Comment · 19 Feb 2025
  • COMMENTS - HISTORIC ENGLAND Consultee Comment · 19 Feb 2025
  • COMMENTS - SOUTHWARK Consultee Comment · 07 Feb 2025
  • COMMENTS - SURVEYOR TO THE FABRIC Consultee Comment · 06 Feb 2025
  • COMMENTS - LONDON UNDERGROUND Consultee Comment · 05 Feb 2025
  • COMMENTS - CAAC Consultee Comment · 01 Feb 2025
  • COMMENTS - GLAAS Consultee Comment · 20 Dec 2024
  • COMMENTS - THAMES WATER Consultee Comment · 16 Dec 2024
  • COMMENTS - THAMES WATER Consultee Comment · 16 Dec 2024
  • COMMENTS - NATS Consultee Comment · 10 Dec 2024
  • COMMENTS - LONDON CITY AIRPORT Consultee Comment · 04 Dec 2024
  • COMMENTS - AIRPORT SAFEGUARDING LTD Consultee Comment · 03 Dec 2024
  • APPLICATIONFORMREDACTED Application Form · 06 Nov 2024
  • EXISTING SITE LOCATION PLAN Site Plan · 06 Nov 2024
  • SMLG COVER LETTER Cover Letter · 06 Nov 2024
  • SMLG02 PLANNING STATEMENT Report - Planning Statement/Report · 06 Nov 2024
  • SMLG04 DAS PART 1 Report - Design & Access Statement/Report · 06 Nov 2024
  • SMLG04 DAS PART 2 Report - Design & Access Statement/Report · 06 Nov 2024
  • SMLG04 DAS PART 3 Report - Design & Access Statement/Report · 06 Nov 2024
  • SMLG04 DAS PART 4 Report - Design & Access Statement/Report · 06 Nov 2024
  • SMLG04 DAS PART 5 Report - Design & Access Statement/Report · 06 Nov 2024
  • SMLG04 DAS PART 6 Report - Design & Access Statement/Report · 06 Nov 2024
  • SMLG04 DAS PART 7 Report - Design & Access Statement/Report · 06 Nov 2024
  • SMLG04 DAS PART 8 Report - Design & Access Statement/Report · 06 Nov 2024
  • SMLG04 DAS PART 9 Report - Design & Access Statement/Report · 06 Nov 2024
  • SMLG04 LIGHTING STRATEGY Accompanying report · 06 Nov 2024
  • SMLG04 LANDSCAPING AND PUBLIC REALM STRATEGY PART 1 Accompanying report · 06 Nov 2024
  • SMLG04 LANDSCAPING AND PUBLIC REALM STRATEGY PART 2 Accompanying report · 06 Nov 2024
  • SMLG04 LANDSCAPING AND PUBLIC REALM STRATEGY PART 3 Accompanying report · 06 Nov 2024
  • SMLG09 NOISE AND VIBRATION IMPACT ASSESSMENT REPORT Report - Acoustic/Noise Report · 06 Nov 2024
  • SMLG17 WLCA GLA TEMPLATE Other · 06 Nov 2024
  • SMLG18 DAYLIGHT SUNLIGHT AND OVERSHADOWING REPORT PART1 Report - Daylight/Sunlight Report · 06 Nov 2024
  • SMLG18 DAYLIGHT SUNLIGHT AND OVERSHADOWING REPORT PART2 Report - Daylight/Sunlight Report · 06 Nov 2024
  • SMLG19 FIRE SAFETY ASSESSMENT Accompanying report · 06 Nov 2024
  • SMLG20 FLOOD RISK ASSESSMENT Accompanying report · 06 Nov 2024
  • SMLG21 SUSTAINABLE DRAINAGE STRATEGY AND FOUL SEWAGE ASSESSMENT_PART1 Accompanying report · 06 Nov 2024
  • SMLG21 SUSTAINABLE DRAINAGE STRATEGY AND FOUL SEWAGE ASSESSMENT_PART2 Accompanying report · 06 Nov 2024
  • SMLG22 MICROCLIMATE IMPACT ASSESSMENT_PART1 Accompanying report · 06 Nov 2024
  • SMLG22 MICROCLIMATE IMPACT ASSESSMENT_PART2 Accompanying report · 06 Nov 2024
  • SMLG29 OUTDOOR THERMAL COMFORT ASSESSMENT REPORT Accompanying report · 06 Nov 2024
  • SMLG23 OUTLINE CONSTRUCTION MANAGEMENT PLAN_PART1 Accompanying report · 06 Nov 2024
  • SMLG23 OUTLINE CONSTRUCTION MANAGEMENT PLAN_PART2 Accompanying report · 06 Nov 2024
  • SMLG24 STATEMENT OF COMMUNITY INVOLVEMENT Other · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 01 Accompanying report · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 02 Accompanying report · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 03 Accompanying report · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 04 Accompanying report · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 05 Accompanying report · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 06 Accompanying report · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 07 Accompanying report · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 08 Accompanying report · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 09 Accompanying report · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 10 Accompanying report · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 11 Accompanying report · 06 Nov 2024
  • SMLG25 TOWNSCAPE VISUAL AND BUILT HERITAGE IMPACT ASSESSMENT_PART 12 Accompanying report · 06 Nov 2024
  • SMLG26 TRANSPORT ASSESSMENT_PART1 Report - Transport Statement/Report · 06 Nov 2024
  • SMLG26 TRANSPORT ASSESSMENT_PART3 Report - Transport Statement/Report · 06 Nov 2024
  • SMLG26 TRANSPORT ASSESSMENT_PART4 Report - Transport Statement/Report · 06 Nov 2024
  • SMLG26 TRANSPORT ASSESSMENT_PART5 Report - Transport Statement/Report · 06 Nov 2024
  • SMLG26 TRANSPORT ASSESSMENT_PART6 Report - Transport Statement/Report · 06 Nov 2024
  • SMLG27 DELIVERY AND SERVICING PLAN Other · 06 Nov 2024
  • SMLG27 OPERATIONAL WASTE MANAGEMENT PLAN Report - Servicing/Waste Mgmt. Statement/Report · 06 Nov 2024
  • SMLG28 FRAMEWORK TRAVEL PLAN_PART1 Report - Travel Plan · 06 Nov 2024
  • SMLG28 FRAMEWORK TRAVEL PLAN_PART2 Report - Travel Plan · 06 Nov 2024
  • SMLG28 FRAMEWORK TRAVEL PLAN_PART3 Report - Travel Plan · 06 Nov 2024
  • EXISTING SITE PLAN Drawing · 06 Nov 2024
  • PROPOSED SITE PLAN Drawing · 06 Nov 2024
  • EXISTING EAST ELEVATION Drawing · 06 Nov 2024
  • EXISTING NORTH ELEVATION Drawing · 06 Nov 2024
  • EXISTING NORTH WEST ELEVATION Drawing · 06 Nov 2024
  • EXISTING SOUTH ELEVATION Drawing · 06 Nov 2024
  • EXISTING WEST ELEVATION Drawing · 06 Nov 2024
  • EXISTING BASEMENT 1 FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING BASEMENT 2 FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING EIGHTH FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING FIFTH FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING FIRST FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING FOURTH FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING GROUND FLOOR PLAN Drawing · 06 Nov 2024
  • SMLG10 AIR QUALITY IMPACT ASSESSMENT AND SMLG11 AQ POSITIVE ASSESSMENT_PART1 Accompanying report · 06 Nov 2024
  • SMLG10 AIR QUALITY IMPACT ASSESSMENT AND SMLG11 AQ POSITIVE ASSESSMENT_PART2 Accompanying report · 06 Nov 2024
  • SMLG12 ARCHAEOLOGY DESK BASED ASSESSMENT Accompanying report · 06 Nov 2024
  • SMLG13 PRELIMINARY ECOLOGICAL APPRAISAL Accompanying report · 06 Nov 2024
  • SMLG14 CIRCULAR ECONOMY STATEMENT PART 1 Accompanying report · 06 Nov 2024
  • SMLG14 CIRCULAR ECONOMY STATEMENT PART 2 Accompanying report · 06 Nov 2024
  • SMLG15 SUSTAINABILITY STATEMENT Accompanying report · 06 Nov 2024
  • SMLG16 ENERGY ASSESSMENT Accompanying report · 06 Nov 2024
  • SMLG17 WHOLE LIFE CARBON ASSESSMENT REPORT Accompanying report · 06 Nov 2024
  • PROPOSED EXTERNAL ENVELOPE FACADE BAY 06 Drawing · 06 Nov 2024
  • PROPOSED EXTERNAL ENVELOPE FACADE BAY 07 Drawing · 06 Nov 2024
  • PROPOSED EXTERNAL ENVELOPE FACADE BAY 08 Drawing · 06 Nov 2024
  • PROPOSED EXTERNAL ENVELOPE KES BACK ENTRANCE Drawing · 06 Nov 2024
  • PROPOSED EXTERNAL ENVELOPE MAIN ENTRANCE FOYER Drawing · 06 Nov 2024
  • PROPOSED EXTERNAL ENVELOPE MAIN ENTRANCE Drawing · 06 Nov 2024
  • PROPOSED EXTERNAL ENVELOPE POSTMANS PARK Drawing · 06 Nov 2024
  • PROPOSED EXTERNAL ENVELOPE SERVICE ENTRANCE Drawing · 06 Nov 2024
  • PROPOSED EXTERNAL ENVELOPE SMLG PEDIMENT Drawing · 06 Nov 2024
  • PROPOSED EXTERNAL ENVELOPE SMLG TENANT ENTRANCE Drawing · 06 Nov 2024
  • DEMOLITION EAST ELEVATION COMP Drawing · 06 Nov 2024
  • DEMOLITION NORTH ELEVATION COMP Drawing · 06 Nov 2024
  • DEMOLITION NORTH WEST ELEVATION Drawing · 06 Nov 2024
  • DEMOLITION SOUTH ELEVATION COMP Drawing · 06 Nov 2024
  • DEMOLITION WEST ELEVATION Drawing · 06 Nov 2024
  • DEMOLITION BASEMENT 1 PLAN Drawing · 06 Nov 2024
  • DEMOLITION BASEMENT 2 PLAN Drawing · 06 Nov 2024
  • DEMOLITION EIGHTH FLOOR PLAN Drawing · 06 Nov 2024
  • DEMOLITION FIFTH FLOOR PLAN Drawing · 06 Nov 2024
  • DEMOLITION FIRST FLOOR PLAN Drawing · 06 Nov 2024
  • DEMOLITION FOURTH FLOOR PLAN Drawing · 06 Nov 2024
  • DEMOLITION GROUND FLOOR PLAN Drawing · 06 Nov 2024
  • DEMOLITION NINTH FLOOR PLAN Drawing · 06 Nov 2024
  • DEMOLITION ROOF PLAN Drawing · 06 Nov 2024
  • DEMOLITION SECOND FLOOR PLAN Drawing · 06 Nov 2024
  • DEMOLITION SEVENTH FLOOR PLAN Drawing · 06 Nov 2024
  • DEMOLITION SIXTH FLOOR PLAN Drawing · 06 Nov 2024
  • DEMOLITION TENTH FLOOR PLAN Drawing · 06 Nov 2024
  • DEMOLITION THIRD FLOOR MEZZANINE PLAN Drawing · 06 Nov 2024
  • DEMOLITION THIRD FLOOR PLAN Drawing · 06 Nov 2024
  • DEMOLITION SECTION A Drawing · 06 Nov 2024
  • DEMOLITION SECTION B Drawing · 06 Nov 2024
  • DEMOLITION SECTION C Drawing · 06 Nov 2024
  • PUBLIC REALM MASTERPLAN Drawing · 06 Nov 2024
  • FLOOR 7 LANDSCAPE MASTERPLAN Drawing · 06 Nov 2024
  • FLOOR 8 LANDSCAPE MASTERPLAN Drawing · 06 Nov 2024
  • FLOOR 10 LANDSCAPE MASTERPLAN Drawing · 06 Nov 2024
  • FLOOR 11 LANDSCAPE MASTERPLAN Drawing · 06 Nov 2024
  • FLOOR 12 LANDSCAPE MASTERPLAN Drawing · 06 Nov 2024
  • FLOOR 13 LANDSCAPE MASTERPLAN Drawing · 06 Nov 2024
  • FLOOR 14 LANDSCAPE MASTERPLAN Drawing · 06 Nov 2024
  • BIRDS EYE VIEW LANDSCAPE MASTERPLAN Drawing · 06 Nov 2024
  • UGF PLAN - EXCLUDING PUBLIC REALM COMP Drawing · 06 Nov 2024
  • UGF PLAN COMP Drawing · 06 Nov 2024
  • PLANTING STRATEGY Drawing · 06 Nov 2024
  • PLANT SCHEDULE Other · 06 Nov 2024
  • SMLG CIL FORM Other · 06 Nov 2024
  • EXISTING NINTH FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING ROOF PLAN Drawing · 06 Nov 2024
  • EXISTING SECOND FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING SEVENTH FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING SIXTH FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING TENTH FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING THIRD FLOOR MEZZANINE PLAN Drawing · 06 Nov 2024
  • EXISTING THIRD FLOOR PLAN Drawing · 06 Nov 2024
  • EXISTING SECTION A Drawing · 06 Nov 2024
  • EXISTING SECTION B Drawing · 06 Nov 2024
  • EXISTING SECTION C Drawing · 06 Nov 2024
  • PROPOSED BASEMENT 1 FLOOR PLAN Drawing · 06 Nov 2024
  • PROPOSED BASEMENT 2 FLOOR PLAN Drawing · 06 Nov 2024
  • PROPOSED FIFTH FLOOR PLAN Drawing · 06 Nov 2024
  • PROPOSED FIRST FLOOR PLAN Drawing · 06 Nov 2024
  • PROPOSED FOURTH FLOOR PLAN Drawing · 06 Nov 2024
  • PROPOSED SECOND FLOOR PLAN Drawing · 06 Nov 2024
  • PROPOSED SIXTH FLOOR PLAN Drawing · 06 Nov 2024
  • PROPOSED THIRD FLOOR PLAN Drawing · 06 Nov 2024
  • PROPOSED EXTERNAL ENVELOPE CYCLE ENTRANCE Drawing · 06 Nov 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 4 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 1 St Martin's-le-grand London EC1A 4AS

    26/00923/MDC Submitted 29 Jun 2026 50 yards away

    99% historically approved · decision due ~24 Aug

    Submission of drawings and Written Scheme of Investigation pursuant to discharge of conditions 19 and 59 (part a) of planning permission 24/01173/FULL dated 04.09.2025.

    Awaiting decision 13 docs
  • 1 St Martin's-le-grand London EC1A 4AS

    26/01259/MDC Submitted 8 Sep 2026 50 yards away

    99% historically approved · decision due ~3 Nov

    Submission of details of Suicide Prevention Strategy pursuant to condition 47 of Planning Permission 24/01173/FULL dated 04.09.2025.

    Awaiting decision
  • 1 St Martin's-le-grand London EC1A 4AS

    26/01258/MDC Submitted 8 Sep 2026 50 yards away

    Submission of details of Highways Condition Survey pursuant to condition 20 of Planning Permission 24/01173/FULL dated 04.09.2025.

    Granted
  • 1 St Martin's-le-grand London EC1A 4AS

    26/01077/MDC Submitted 29 Jul 2026 50 yards away

    Submission of Phase 1 and 2 Ground Investigation and Outline Remediation Strategy Report pursuant to discharge of conditions 3 and 4 of planning permission 24/01173/FULL dated 04.09.2025.

    Granted 13 docs
  • 1 St Martin's-le-grand London EC1A 4AS

    26/01013/PODC Submitted 14 Jul 2026 50 yards away

    Submission of the Local Training, Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3 Paragraph 3.2 of the S106 Agreement dated 04 September 2025 (Planning Application Reference: 24/01173/FULL).

    Granted Demolition 4 docs
  • 1 St Martin's-le-grand London EC1A 4AS

    26/01462/MDC Submitted 15 Oct 2026 50 yards away

    99% historically approved · decision due ~10 Dec

    Submission of Scheduled Monument Methodology Statement pursuant to condition 56 of planning permission 24/01173/FULL dated 04.09.2025.

    Awaiting decision

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications