Skip to content
PlanIndex Get alerts
Menu

Planning application

90 Liverpool Street London EC2M 2AT

Granted City of London 24/01065/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of part ground floor and part first floor from gymnasium use (Class E(d)) to a mixed (sui generis) use including restaurant, drinking establishment and competitive socialising uses [1,974 sq.m GIA].

As published by the council, reference 24/01065/FULL

Application record

Reference
24/01065/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
4 Oct 2024
Validated
4 Oct 2024
Decided
29 Nov 2024
Ward
Bishopsgate
Decision by
Delegated Decision
Postcode
EC2M 2AT

Site history

Applications at this address on the City of London register

This site has had 2 applications since 2024: 1 approved, 0 refused.

  • 26/00292/FULL Awaiting decision

    90 Liverpool Street London EC2M 2AT

    Change of use of private land to which the public have access at two forecourts measuring 7.5m x 2.45m at east and south sides of 90 Liverpool Street for the siting of 6 tables and 28 chairs, and 8 planters at ground floor in association with adjacent leisure unit

    Submitted 25 Feb 2026 Full applications

Timeline

Dates from the published record

  1. 4 Oct 2024

    Received by City of London

  2. 29 Nov 2024

    Decision issued: Approved

  3. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

20 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

City of London granted permission on 29 November 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 100 Liverpool Street London EC2M 2AT

    25/01246/ADVT Submitted 10 Sep 2025 0m away

    Installation and display of: (i) four white vinyl stickers measuring 1500mm x 600mm.

    Granted Advertising 9 docs
  • 90 Liverpool Street London EC2M 2AT

    26/00292/FULL Submitted 25 Feb 2026 0m away

    99% historically approved · decision due ~26 May

    Change of use of private land to which the public have access at two forecourts measuring 7.5m x 2.45m at east and south sides of 90 Liverpool Street for the siting of 6 tables and 28 chairs, and 8 planters at ground floor in association with adjacent leisure unit

    Awaiting decision Full applications 12 docs
  • 59 Broadgate Link Lower Concourse Liverpool Street Station Liverpool Street London EC2M 7PY

    25/01405/5REG Submitted 13 Oct 2025 0m away

    Notification under Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) to install Approximately 25m of internal cabling,1 non-conrete internal drilling and Fibre Equipment at Site , 5m Pigtails.

    Decided 5 docs
  • Liverpool Street Bus Station Liverpool Street London EC2M 7PY

    26/00023/5REG Submitted 6 Jan 2026 0m away

    99% historically approved · decision due ~4 Mar

    160M Internal cabling.

    Awaiting decision 4 docs
  • 100 Liverpool Street & 8-12 Broadgate London EC2M 2RH

    20/00871/MDC Submitted 6 Nov 2020 6m away

    Submission of details of a post construction Energy Statement demonstrating the reduction in carbon dioxide emission for the development pursuant to condition 35 of planning permission 17/00276/FULL dated 05.06.2017.

    Granted Conditions 7 docs
  • 100 Liverpool Street London EC2M 2AT

    21/00656/MDC Submitted 2 Aug 2021 6m away

    Details of sound insulation pursuant to condition 2 of planning permission reference 19/01190/FULL dated 14th January 2020.

    Granted Conditions 5 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications