Planning application
9A Devonshire Square London EC2M 4YN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Internal works to the first and third floors of the Bengal Wing, including removal and re-installation of partitions, ceilings, mechanical installation and other fit-out.
As published by the council, reference 24/00992/LBC
Application record
- Reference
- 24/00992/LBC
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Approved
- Received
- 12 Sep 2024
- Validated
- 12 Sep 2024
- Decided
- 25 Oct 2024
- Ward
- Bishopsgate
- Decision by
- Delegated Decision
- Postcode
- EC2M 4YN
Site history
Applications at this address on the City of London register
This site has had 8 applications since 2021: 6 approved, 0 refused.
-
24/00973/LBC Granted
9A Devonshire Square London EC2M 4YN
Internal alterations to fourth floor office space including installation of partitions, lighting and other fit-out.
-
24/00639/LBC Granted
9A Devonshire Square London EC2M 4YN
Internal works including the removal of plasterboard partitions, false ceilings and raised access floors, installation of new mechanical units, lighting, secondary glazing and reinstatement of opening between buildings 9A and 9 to support its development as renewed office space.
-
23/01175/LBC Awaiting decision
9A Devonshire Square London EC2M 4YN
Installation of a platform lift within office reception area to Building 9a (The Bengal Wing).
-
23/00476/LBC Granted
9A Devonshire Square London EC2M 4YN
Installation of plasterboard and glazed partitions on the second floor. Installation of secondary glazing to existing meeting room and minor modifications to existing mechanical installation.
-
22/01046/LBC Granted
9A Devonshire Square London EC2M 4YN
Internal fit out of fourth floor office including installation of plasterboard and glazed partitions and minor modifications to existing mechanical installation.
-
21/00515/LBC Withdrawn
9A Devonshire Square London EC2M 4YN
Internal fit out of office space including the removal of existing partitions and installation of new light weight partitions.
-
21/00232/LBC Granted
9A Devonshire Square London EC2M 4YN
Internal fit out of fifth floor offices.
Timeline
Dates from the published record
-
12 Sep 2024
Received by City of London
-
25 Oct 2024
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Glasgow
44 applications on PlanIndex · across 6 councils · 97% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
27 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 25 October 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
9A Devonshire Square London EC2M 4YN
Internal fit out of office space including the removal of existing partitions and installation of new light weight partitions.
Withdrawn Heritage and listed buildings 9 docs -
9A Devonshire Square London EC2M 4YN
Internal alterations to fourth floor office space including installation of partitions, lighting and other fit-out.
Granted Heritage and listed buildings 23 docs -
9A Devonshire Square London EC2M 4YN
Internal fit out of fifth floor offices.
Granted Heritage and listed buildings 20 docs -
9A Devonshire Square London EC2M 4YN
Internal works including the removal of plasterboard partitions, false ceilings and raised access floors, installation of new mechanical units, lighting, secondary glazing and reinstatement of opening between buildings 9A and 9 to support its development as renewed office space.
Granted Heritage and listed buildings Windows or glazing 28 docs -
12 Devonshire Square London EC2M 4TE
Internal and external works comprising of: (i) the removal of the basement toilet block and reinstatement of the courtyard; (ii) the removal of the ground floor toilet block; (iii) the installation of an external staircase connecting to the basement courtyard; (iv) removal of ground floor bay window and reinstatement of sash window; (v) repair and reinstatement of historic features; (vi) removal of modern windows and replacement with sash and casement windows; (vii) removal of modern kitchen and sanitary fittings, joinery, services and partitions and replacement with upgraded layouts and services; (vii) removal of partitions at entrance and first and second floors; (ix) installation of exterior plant at roof level; (x replacement of existing roof lantern with double glazed lantern unit; (xi) the installation of insulation to roofs; (xii) repair and replacement of damaged slates to pitched roofs and replacement of asphalt coverings on flat roofs; (xiii) installation of new metal balustrade at roof level; (xiv) installation of a flag pole on the front elevation; and (xv) the provision of cycle parking, (xvi) the installation of an entrance door in the front elevation at lower ground floor level; (xvii) the removal of the pitched roof and replacement with flat roof to the rear. *RE CONSULTATION DUE TO REVISED PLANS AND DESCRIPTION*
Granted Heritage and listed buildings Windows or glazing 64 docs -
12 Devonshire Square London EC2M 4TE
External works comprising of: (i) the removal of the basement toilet block and reinstatement of the courtyard; (ii) the removal of the ground floor toilet block; (iii) the installation of an external staircase connecting to the basement courtyard; (iv) removal of ground floor bay window and reinstatement of sash window; (v) repair and reinstatement of historic features; (vi) removal of modern windows and replacement with sash and casement windows; (vii) installation of exterior plant at roof level; (vii) replacement of existing roof lantern with double glazed lantern unit; (ix) repair and replacement of damaged slates to pitched roofs and replacement of asphalt coverings on flat roofs; (x) installation of new metal balustrade at roof level; (xi) installation of a flag pole on the front elevation; (xii) the provision of cycle parking; (xiii) the installation of an entrance door in the front elevation at lower ground floor level; (xiv) the removal of the pitched roof and replacement with flat roof to the rear. *RECONSULTATION DUE TO REVISED PLANS AND DESCRIPTION*
Granted Full applications Windows or glazing 66 docs
Other heritage and listed building applications
In City of London
-
26/01222/LBC Awaiting decision
Rising Sun Public House 61 Carter Lane London EC4V 5DY
Installation of 2no. eyebolt fixings to northern elevation to hold catenary wires to facilitate festive lighting and decoration displays
-
26/01212/LBC Awaiting decision
St Mary Abchurch House 123 - 127 Cannon Street London EC4N 5AU
Installation of internal secondary glazing to the existing windows at first to fifth-floor levels
-
26/00342/LBC Withdrawn
89 Speed House Barbican London EC2Y 8AU
Removal of non-structural partitions in the kitchen to create an open-plan kitchen.
-
26/01195/LBC Awaiting decision
2 Moorgate London EC2R 6AG
Alterations to a listed building including: extension at roof level and introduction of a roof terrace, upgrades to facade including entrance doorset and glazing, internal and MEP upgrades, with associated works.
-
26/00385/LBC Granted
Adelaide House London Bridge London EC4R 9HA
External repair works (part retrospective) to facade, including (i) repairs to brickwork including repointing of mortar where necessary, (ii) replacement of Portland Stone where damaged, and (iii) mortar repair works to lintels and cills throughout each facade.