Planning application

60 Threadneedle Street London EC2R 8HP

Granted City of London 24/00848/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Alterations to ground floor office entrance, construction of new landscaped 8th floor roof terrace including relocation of existing sedum roof to the 9th floor and associated works.

As published by the council, reference 24/00848/FULL

Application record

Reference
24/00848/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
8 Aug 2024
Validated
8 Aug 2024
Decided
19 Dec 2024
Ward
Walbrook
Decision by
Delegated Decision
Postcode
EC2R 8HP

Timeline

Dates from the published record

  1. 8 Aug 2024

    Received by City of London

  2. 19 Dec 2024

    Decision issued: Approved

  3. 28 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a planning consultancy registered in The Oval

481 applications on PlanIndex · across 20 councils · 94% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

29 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 60 Threadneedle Street London EC2R 8HP

    25/00662/MDC Submitted 19 May 2025 0m away

    Submission of Landscaping Scheme drawings pursuant to discharge of Condition 6 of Planning Permission 24/00848/FULL dated 19.12.2024.

    Granted Conditions 20 docs
  • 60 Threadneedle Street London EC2R 8HP

    24/00847/NMA Submitted 8 Aug 2024 0m away

    Non-material amendment under Section 96a of the Town and Country Planning Act 1990 to planning permission 05/00227/FULL dated 15th September 2005 to change the wording of Condition 20 (Motorcycle parking).

    Granted Amendments 7 docs
  • 120 Old Broad Street London EC2N 1AR

    26/01085/MDC Submitted 29 Jul 2026 39m away

    99% historically approved · decision due ~23 Sep

    Submission of Lighting Strategy pursuant to discharge of condition 10 of planning permission 23/01384/FULL dated 30.09.2024.

    Awaiting decision 3 docs
  • 1 Bartholomew Lane London EC2N 2AX

    25/01377/5REG Submitted 6 Oct 2025 57m away

    Notification in accordance with Regulation 5 of the Electronic Communications Code (Conditions and Restrictions) Regulations 2003 (as amended) for installation of 1No. equipment housing cabinet and ancillary development thereto.

    Decided 4 docs
  • 1 Threadneedle Street London EC2R 8AY

    23/00001/CLEUD Submitted 3 Jan 2023 67m away

    Certificate of Lawful Development (existing) for confirmation the site falls under Use Class E following the Use Classes Order 2020 amendment.

    Granted Lawful development 9 docs
  • 1 Threadneedle Street London EC2R 8AY

    23/00001/CLOPD Submitted 3 Jan 2023 67m away

    Certificate of Lawful Development (existing) for confirmation the site falls under Use Class E following the Use Classes Order 2020 amendment.

    Granted Lawful development 9 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications