Skip to content
PlanIndex Get alerts
Menu

Planning application

Atlas House 1 - 7 King Street London EC2V 8AU

Granted City of London 24/00737/FULL Full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of Atlas House from offices (Class E) to hotel and ancillary uses (Class C1), together with associated alterations including replacement windows, creation of new level access and back of house doors, reinstatement of colonnade arch on Cheapside, new plant at roof level and other works

As published by the council, reference 24/00737/FULL

Application record

Reference
24/00737/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
11 Jul 2024
Validated
18 Jul 2024
Decided
19 Mar 2025
Ward
Cheap
Decision by
Delegated Decision
Postcode
EC2V 8AU

Timeline

Dates from the published record

  1. 11 Jul 2024

    Received by City of London

  2. 18 Jul 2024

    Validated

    Checked as complete and ready for consideration.

  3. 19 Mar 2025

    Decision issued: Approved

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

89 applications on PlanIndex · across 15 councils · 94% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

121 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Atlas House 1 - 7 King Street London EC2V 8AU

    24/00738/LBC Submitted 11 Jul 2024 0m away

    Internal and external alterations including replacement windows, creation of new level access and back of house doors, reinstatement of colonnade arch on Cheapside, new plant at roof level and other works in assocation with change of use of Atlas House from offices (Class E) to hotel and ancillary uses (Class C1)

    Granted Heritage and listed buildings Windows or glazing 113 docs
  • Atlas House 1 - 7 King Street London EC2V 8AU

    25/00619/MDC Submitted 9 May 2025 0m away

    100% historically approved · decision due ~4 Jul

    Submission of details pursuant to discharge of condition 4 of planning permission 24/00737/FULL dated 19.03.2025.

    Awaiting decision Conditions 3 docs
  • Atlas House 1 - 7 King Street London EC2V 8AU

    25/00616/MDC Submitted 8 May 2025 0m away

    100% historically approved · decision due ~3 Jul

    Submission of details pursuant to discharge of condition 3 of planning permission 24/00737/FULL dated 19.03.2025.

    Awaiting decision Conditions 4 docs
  • Atlas House 1 - 7 King Street London EC2V 8AU

    25/00617/MDC Submitted 8 May 2025 0m away

    100% historically approved · decision due ~3 Jul

    Submission of details pursuant to discharge of condition 5 of planning permission 24/00737/FULL dated 19.03.2025.

    Awaiting decision Conditions 4 docs
  • Atlas House 1 - 7 King Street London EC2V 8AU

    26/01092/MDC Submitted 30 Jul 2026 0m away

    99% historically approved · decision due ~24 Sep

    Submission of details of Anti-Vibration Memo and Emergency Backup Power Supply pursuant to conditions 8 and 11 of Planning Permission 24/00737/FULL dated 19.03.2025.

    Awaiting decision 4 docs
  • Atlas House 1 - 7 King Street London EC2V 8AU

    26/00438/LDC Submitted 26 Mar 2026 26m away

    100% historically approved · decision due ~21 May

    Submission of details of lighting strategy pursuant to condition 2(l) of Listed Building Consent 24/00738/LBC dated 19.03.2025.

    Awaiting decision Lawful development 12 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications