Planning application
Atlas House 1 - 7 King Street London EC2V 8AU
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of Atlas House from offices (Class E) to hotel and ancillary uses (Class C1), together with associated alterations including replacement windows, creation of new level access and back of house doors, reinstatement of colonnade arch on Cheapside, new plant at roof level and other works
As published by the council, reference 24/00737/FULL
Application record
- Reference
- 24/00737/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approved
- Received
- 11 Jul 2024
- Validated
- 18 Jul 2024
- Decided
- 19 Mar 2025
- Ward
- Cheap
- Decision by
- Delegated Decision
- Postcode
- EC2V 8AU
Timeline
Dates from the published record
-
11 Jul 2024
Received by City of London
-
18 Jul 2024
Validated
Checked as complete and ready for consideration.
-
19 Mar 2025
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
89 applications on PlanIndex · across 15 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
121 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Atlas House 1 - 7 King Street London EC2V 8AU
Internal and external alterations including replacement windows, creation of new level access and back of house doors, reinstatement of colonnade arch on Cheapside, new plant at roof level and other works in assocation with change of use of Atlas House from offices (Class E) to hotel and ancillary uses (Class C1)
Granted Heritage and listed buildings Windows or glazing 113 docs -
Atlas House 1 - 7 King Street London EC2V 8AU
100% historically approved · decision due ~4 Jul
Submission of details pursuant to discharge of condition 4 of planning permission 24/00737/FULL dated 19.03.2025.
Awaiting decision Conditions 3 docs -
Atlas House 1 - 7 King Street London EC2V 8AU
100% historically approved · decision due ~3 Jul
Submission of details pursuant to discharge of condition 3 of planning permission 24/00737/FULL dated 19.03.2025.
Awaiting decision Conditions 4 docs -
Atlas House 1 - 7 King Street London EC2V 8AU
100% historically approved · decision due ~3 Jul
Submission of details pursuant to discharge of condition 5 of planning permission 24/00737/FULL dated 19.03.2025.
Awaiting decision Conditions 4 docs -
Atlas House 1 - 7 King Street London EC2V 8AU
99% historically approved · decision due ~24 Sep
Submission of details of Anti-Vibration Memo and Emergency Backup Power Supply pursuant to conditions 8 and 11 of Planning Permission 24/00737/FULL dated 19.03.2025.
Awaiting decision 4 docs -
Atlas House 1 - 7 King Street London EC2V 8AU
100% historically approved · decision due ~21 May
Submission of details of lighting strategy pursuant to condition 2(l) of Listed Building Consent 24/00738/LBC dated 19.03.2025.
Awaiting decision Lawful development 12 docs
Other full applications applications
In City of London
-
26/00041/FULL Granted
The Aldgate School St James's Passage London EC3A 5DE
Refurbishment of existing commercial kitchen and new extract ventilation ductwork
-
26/00659/FULL Granted
30 Gresham Street London EC2V 7PG
Creation of a new entrance on Gresham Street and enhancement of existing main entrance.
-
26/00539/FULL Granted
Basement Pair North 6 King's Bench Walk London EC4Y 7DR
External installation of a new free-standing condenser and associated services within rear lightwell.
-
26/01207/FULL Awaiting decision
25 Gresham Street London EC2V 7HN
Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.
-
26/01202/FULL Awaiting decision
2 Moorgate London EC2R 6AG
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.