Skip to content
PlanIndex Get alerts
Menu

Planning application

23/00185/LBC

Guildhall School of Music And Drama Silk Street London EC2Y 8DT

Granted City of London Listed Building Consent

Proposal

Removal of modern tile surfaces to cafe walls with original tiles below to be retained, and the addition of new tiles over original tiles.

As published by the council, reference 23/00185/LBC

Timeline

Dates from the published record

  1. 20 Feb 2023

    Received by City of London

  2. 29 Mar 2023

    Decision issued: Approved

  3. 31 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • 26/00695/MDC Granted

    Guildhall School of Music And Drama Silk Street London EC2Y 8DT

    Submission of details of plant noise, installation and maintenance pursuant to condition 2 of planning permission 25/01010/FULL dated 23/03/2026.

    13 May 2026 0m away Conditions
  • 26/00791/LDC Granted

    Guildhall School of Music And Drama Silk Street London EC2Y 8DT

    Submission of details pursuant to conditions 3 and 4 of planning permission 25/01011/LBC dated 23/03/2026.

    13 May 2026 0m away Lawful development
  • 25/01010/FULL Granted

    Guildhall School of Music And Drama Silk Street London EC2Y 8DT

    Installation of four air conditioning units within a plant enclosure at podium roof level.

    29 Jul 2025 0m away Full applications
  • 25/01011/LBC Granted

    Guildhall School of Music And Drama Silk Street London EC2Y 8DT

    (i) Installation of internal air handling units and four associated external air conditioning units within a plant enclosure at podium roof level; (ii) internal alterations at second floor level associated with the installation of freestanding studio spaces, including removal of glazed corridor partition and replacement with solid plasterboard wall and doors.

    29 Jul 2025 0m away Heritage and listed buildings
  • 26/00737/LBC Granted

    Guildhall School of Music And Drama Silk Street London EC2Y 8DT

    Replacement of internal fire doors across all floors

    20 May 2026 0m away Heritage and listed buildings
  • 26/00155/FULL Granted

    Guildhall School of Music And Drama Silk Street London EC2Y 8DT

    Alterations to the external area adjacent to Silk Street and to the main entrance to include new lighting, replacement of cycle parking with planters, and new entrance doors.

    2 Feb 2026 0m away Full applications

In City of London

  • 26/00746/LBC Granted

    Offices 4 Moorgate London EC2R 6DA

    Internal refurbishment works to communal areas of existing office building at basement and ground levels and stair and lift cores, including removal and replacement of existing glazed secondary entrance door on Moorgate; refurbishment of existing external entrances on Moorgate and King Arms Yard Entrance; installation of a condenser unit in the basement lightwell; and retrospective consent for replacement of two passenger lifts.

    21 May 2026 Heritage and listed buildings
  • 26/00490/LBC Granted

    312 Cromwell Tower Barbican London EC2Y 8NB

    Refurbishment of the existing bathroom and separate shower/WC, including replacement sanitary ware, finishes, and fittings, together with the installation of new full-height internal doors to both rooms.

    2 Apr 2026 Heritage and listed buildings
  • 26/00785/LBC Granted

    5 St Michael's Alley London EC3V 9DS

    Internal alterations at basement level of Jamaica Wine House associated with refurbishment of customer bar areas and toilets.

    29 May 2026 Heritage and listed buildings
  • 26/00621/LBC Granted

    89 Speed House Barbican London EC2Y 8AU

    Internal alterations to a fifth-floor flat within Speed House, including the partial removal of the existing non-structural outer kitchen partition wall to create open-plan between the kitchen and living room.

    28 Apr 2026 Heritage and listed buildings
  • 26/00522/LBC Granted

    The Irish Chamber 1 Guildhall Yard London EC2V 5AE

    Alterations to a Listed Building including: (i) upgrades to mechanical heating systems, (ii) upgrade to and provision of new ground floor W/C's, (iii) upgrades to electrical wiring, lighting, alarm systems, (iv) installation of L.E.D lighting to replace existing on all floor levels, (v) installation of floor boxes on Ground and First floor levels, (vi) sustainability improvements including sealant to windows (viii) installation of a replacement kitchen alongside retained existing cupboards, (ix) installation of carpet, and; (x) associated minor repairs, redecorating and removal of redundant wiring.

    13 Apr 2026 Heritage and listed buildings