Skip to content
PlanIndex Get alerts
Menu

Planning application

43 - 45 Eastcheap London EC3M 1JA

Granted City of London 23/00074/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retention of retractable canopy.

As published by the council, reference 23/00074/FULL

Application record

Reference
23/00074/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
25 Jan 2023
Validated
22 Feb 2023
Decided
28 Apr 2023
Ward
Billingsgate
Decision by
Delegated Decision
Postcode
EC3M 1JA

Timeline

Dates from the published record

  1. 25 Jan 2023

    Received by City of London

  2. 22 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 28 Apr 2023

    Decision issued: Approved

  4. 10 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in London

10 applications on PlanIndex · across 6 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 43 - 45 Eastcheap London EC3M 1JA

    23/00135/LBC Submitted 6 Feb 2023 0m away

    Application for Listed Building Consent for the retention of fixed signs to fascia, hanging sign and internally illuminated sign within window.

    Granted Heritage and listed buildings Windows or glazing 18 docs
  • 43 - 45 Eastcheap London EC3M 1JA

    24/00747/FULL Submitted 15 Jul 2024 0m away

    Installation of a kitchen extract duct within the rear lightwell to extend from ground floor level to the roof of the building.

    Granted Full applications 16 docs
  • 43 - 45 Eastcheap London EC3M 1JA

    23/00075/ADVT Submitted 25 Jan 2023 0m away

    Retention of four non-illuminated fascia signs measuring (i) (ii) 0.22m in height and 1.65m in width at a height above ground of 3.32m and (iii) (iv) 0.4m in height and 0.65m in width with a height above ground of 2.595m; one projecting non-illuminated projecting sign measuring 0.4m in height and 0.45m in width at a height above ground of 3.4m; one non-illuminated other sign located on retractable fabric canopy measuring 0.15m in height and 5.05m in width with a height above ground of 3.28m.

    Granted Advertising 20 docs
  • 43 - 45 Eastcheap London EC3M 1JA

    24/00158/ADVT Submitted 16 Feb 2024 5m away

    Installation and display of non-illuminated fascia signs measuring 1330mm in width by 125mm in height at 3320mm above ground level; the display of two logos measuring 585mm in width by 340mm in height at 2780mm above ground level; and display of non-illuminated hanging sign measuring 600mm in width by 350mm in height at 2945mm above ground level.

    Granted Advertising 17 docs
  • 43 - 45 Eastcheap London EC3M 1JA

    24/00159/LBC Submitted 16 Feb 2024 5m away

    Replacement of fixed fascia signs, hanging sign and internally illuminated sign within window.

    Granted Heritage and listed buildings Windows or glazing 10 docs
  • 51 Eastcheap London EC3M 1JA

    25/01777/MDC Submitted 17 Dec 2025 24m away

    Submission of details of plant installation (Noise Control/Hours of Work/Pollution); and details relating to mounting of mechanical plant to minimise transmission of structure borne sound or vibration( Noise from mechanical system) pursuant to conditions 6 (part b) and 7 of planning permission 17/01221/FULL dated 15/03/2018.

    Granted Conditions 5 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications