Planning application

City Tower And City Place House 40 - 55 Basinghall Street London EC2V

Granted City of London 22/01197/PODC Planning Obligations

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Submission of documents relating to the New Bridge Structure pursuant to Schedule 3 Paragraph 17.1 of the Section 106 Agreement dated 29 September 2021 (Planning Application Reference 21/00116/FULMAJ).

As published by the council, reference 22/01197/PODC

Application record

Reference
22/01197/PODC
Type
Planning Obligations
Status
Decided
Decision
Granted As published: Approved
Received
6 Dec 2022
Validated
6 Dec 2022
Decided
6 Jan 2023
Ward
Bassishaw
Decision by
Delegated Decision

Site history

Applications at this address on the City of London register

This site has had 7 applications since 2022: 6 approved, 0 refused.

  • 25/01040/MDC Granted

    City Tower And City Place House 40 - 55 Basinghall Street London EC2V

    Submission of SUDs Maintenance Requirements and Cost Schedule pursuant to the discharge of condition 16 of planning application 21/00116/FULL dated 29.09.2021.

    Decided 3 Dec 2025 Conditions
  • 25/00813/ADVT Granted

    City Tower And City Place House 40 - 55 Basinghall Street London EC2V

    Installation of no.8 externally illuminated projecting signs measuring 600mm x 600mm x 10mm.

    Decided 19 Jan 2026 Advertising
  • 23/00945/NMA Granted

    City Tower And City Place House 40 - 55 Basinghall Street London EC2V

    Non-material amendment under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission dated 29 September 2021 (Reference 21/00116/FULMAJ.) to amend condition 55 (approved drawings and particulars) to allow for (i) design development and adjustment of internal layouts, (ii) adjustment of basement extent, (iii) petal shape refinement, (iv) additional of green wall, (v) adjustment of façade line to improve public realm circulation, (vi) replacement of doors on Aldermanbury Square and 40 Basinghall Street elevations, (vii) adjustment of landscape and public realm design, levels, extent and cycle stands location, (viii) amendments to roof composition and screening (iv) revisions to consented floorspace (increase in GIA and decrease in GEA) and to amend condition 54 in order to reflect the revised floor areas.

    Decided 30 Jan 2024 Amendments
  • 23/00280/PODC Granted

    City Tower And City Place House 40 - 55 Basinghall Street London EC2V

    Submission of details for the provision and phasing of temporary routes through the Site (during the demolition and construction phases) pursuant to Schedule 3 Paragraphs 21.1 and 21.2 of the Section 106 Agreement dated 29 September 2021 (Planning Application Reference 21/00116/FULMAJ).

    Decided 23 May 2023
  • 22/01098/MDC Granted

    City Tower And City Place House 40 - 55 Basinghall Street London EC2V

    Submission of a lighting strategy pursuant to the discharge of condition 20 of planning permission 21/00116/FULMAJ dated 29 September 2021.

    Decided 28 Feb 2023 Conditions
  • 22/00804/MDC Withdrawn

    City Tower And City Place House 40 - 55 Basinghall Street London EC2V

    Submission of details of SUDs components and measures to prevent flooding pursuant to condition 15 of planning permission 21/00116/FULMAJ dated 29 September 2021.

    Decided 16 Jul 2024 Conditions

Timeline

Dates from the published record

  1. 6 Dec 2022

    Received by City of London

  2. 6 Jan 2023

    Decision issued: Approved

  3. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 6 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on City of London's portal will say. Our guide explains the common types.