Planning application
60 Victoria Embankment London EC4Y 0JP
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
The removal, refurbishment, and reinstatement of existing bronze entrance gates (including temporary means of enclosure).
As published by the council, reference 22/01147/FULL
Application record
- Reference
- 22/01147/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approved
- Received
- 29 Nov 2022
- Validated
- 29 Nov 2022
- Decided
- 24 Jan 2023
- Ward
- Castle Baynard
- Decision by
- Delegated Decision
- Postcode
- EC4Y 0JP
Site history
Applications at this address on the City of London register
This site has had 4 applications since 2022: 3 approved, 0 refused.
-
26/00645/FULL Awaiting decision
60 Victoria Embankment London EC4Y 0JP
Installation of bird protection netting.
-
25/01764/FULL Granted
60 Victoria Embankment London EC4Y 0JP
Installation of security screens at ground floor level on the western elevation.
-
22/01148/LBC Granted
60 Victoria Embankment London EC4Y 0JP
The removal, refurbishment, and reinstatement of existing bronze entrance gates (including temporary means of enclosure).
Timeline
Dates from the published record
-
29 Nov 2022
Received by City of London
-
24 Jan 2023
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Tonbridge
6 applications on PlanIndex · across 4 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 24 January 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
60 Victoria Embankment London EC4Y 0JP
The removal, refurbishment, and reinstatement of existing bronze entrance gates (including temporary means of enclosure).
Granted Heritage and listed buildings 10 docs -
60 Victoria Embankment London EC4Y 0JP
99% historically approved · decision due ~26 Jun
Installation of bird protection netting.
Awaiting decision Full applications 12 docs -
60 Victoria Embankment London EC4Y 0JP
Installation of security screens at ground floor level on the western elevation.
Granted Full applications 18 docs -
9 Carmelite Street London EC4Y 0DR
Retrospective consent for alterations to include: installation of magnetic lock system to internal lobby doors; installation of acoustic ceiling baffles to seminar room; and installation of internally mounted window blinds throughout.
Granted Heritage and listed buildings Windows or glazing 18 docs -
Tideway Working Area Blackfriars Bridge Foreshore Victoria Embankment London EC4Y 0DR
Partial discharge of Schedule 3 requirements relating to approval of details for raising the lion head piers and the retention of the lion head moorings pursuant to BLABF 11 and BLABF 12 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
Granted 11 docs -
Tideway Working Area Blackfriars Bridge Foreshore London Victoria Embankment EC4Y 0DR
Partial discharge of Schedule 3 requirements relating to approval of details for the installation of ducts within the service subway for new utilities pursuant to BLABF 11 and BLABF 24 of the Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 as amended.
Granted 9 docs
Other full applications
In City of London
-
26/00041/FULL Granted
The Aldgate School St James's Passage London EC3A 5DE
Refurbishment of existing commercial kitchen and new extract ventilation ductwork
-
26/00659/FULL Granted
30 Gresham Street London EC2V 7PG
Creation of a new entrance on Gresham Street and enhancement of existing main entrance.
-
26/00539/FULL Granted
Basement Pair North 6 King's Bench Walk London EC4Y 7DR
External installation of a new free-standing condenser and associated services within rear lightwell.
-
26/01207/FULL Awaiting decision
25 Gresham Street London EC2V 7HN
Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.
-
26/01202/FULL Awaiting decision
2 Moorgate London EC2R 6AG
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.