Skip to content
PlanIndex Get alerts
Menu

Planning application

St Andrews House 145 - 146 Leadenhall Street London EC3V 4QT

Granted City of London 22/01135/FULL Full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Removal of three small windows to create one single window at the lower ground floor to the northern elevation of the building.

As published by the council, reference 22/01135/FULL

Application record

Reference
22/01135/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
25 Nov 2022
Validated
25 Nov 2022
Decided
12 Jan 2023
Ward
Lime Street
Decision by
Delegated Decision
Postcode
EC3V 4QT

Timeline

Dates from the published record

  1. 25 Nov 2022

    Received by City of London

  2. 12 Jan 2023

    Decision issued: Approved

  3. 10 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 6-8 Bishopsgate & 150 Leadenhall Street London EC3V 4QT

    22/00881/NMA Submitted 14 Sep 2022 0m away

    Non-material amendment under Section 96A of the Town and Country Planning Act to planning permission dated 13 September 2018 (17/00447/FULEIA) to amend Condition 57 to improve the design and functionality of the building including introduction of louvres at Level 25, addition of two doors located at level 9 terrace and development of cafe design at ground floor level layout.

    Granted Amendments 20 docs
  • 6-8 Bishopsgate & 150 Leadenhall Street London EC3V 4QT

    22/00684/MDC Submitted 28 Jul 2022 0m away

    Submission of details of all ground level surfaces including materials to be used pursuant to condition 23 (g) in part of planning permission 17/00447/FULEIA dated 13 September 2018.

    Granted Conditions 8 docs
  • 6-8 Bishopsgate & 150 Leadenhall Street London EC3V 4QT

    22/00683/MDC Submitted 28 Jul 2022 0m away

    Submission of details of external surfaces within the site boundary including hard and soft landscaping pursuant to condition 23 (h) in part of planning permission 17/00447/FULEIA dated 13 September 2018.

    Granted Conditions 10 docs
  • 6-8 Bishopsgate & 150 Leadenhall Street London EC3V 4QT

    26/00805/PODC Submitted 1 Jun 2026 0m away

    99% historically approved · decision due ~27 Jul

    Submission of the Second Annual Review of the Travel Plan pursuant to Schedule 3 Paragraphs 9.5 of the Section 106 Agreement dated 13 September 2018 (Planning Application Ref: 17/00447/FULEIA).

    Decided 3 docs
  • 140 Leadenhall Street London EC3V 4QT

    26/01214/MDC Submitted 26 Aug 2026 0m away

    99% historically approved · decision due ~21 Oct

    Submission of Noise Impact Assessment pursuant to Conditions 5 & 6 of planning permission 26/00314/FULL dated 18.05.2026.

    Awaiting decision 3 docs
  • 140 Leadenhall Street London EC3V 4QT

    26/01213/MDC Submitted 26 Aug 2026 0m away

    99% historically approved · decision due ~21 Oct

    Submission of Noise Impact Assessment pursuant to Conditions 4 & 5 of planning permission 25/00955/FULL dated 05.12.2025.

    Awaiting decision 3 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications