Planning application

3 Moorgate Place London EC2R 6EA

Granted City of London 22/01049/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application under Section 73 of the Town and Country Planning Act 1990 (as amended) for the removal of condition 4 of planning permission dated 13.08.2020 (Reference 20/00385/FULL).

As published by the council, reference 22/01049/FULL

Application record

Reference
22/01049/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
3 Nov 2022
Validated
3 Nov 2022
Decided
20 Apr 2023
Ward
Coleman Street
Decision by
Delegated Decision
Postcode
EC2R 6EA

Site history

Applications at this address on the City of London register

This site has had 2 applications since 2021: 2 approved, 0 refused.

  • 21/00153/MDC Granted

    3 Moorgate Place London EC2R 6EA

    Submission of particulars and samples of the materials to be used on the proposed balustrade and plant screen pursuant to condition 8 (a) of planning permission 20/00385/FULL dated 13 August 2020.

    Decided 2 Sep 2021 Conditions

Timeline

Dates from the published record

  1. 3 Nov 2022

    Received by City of London

  2. 20 Apr 2023

    Decision issued: Approved

  3. 28 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

61 applications on PlanIndex · across 14 councils · 98% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

City of London granted permission on 20 April 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 3 Moorgate Place London EC2R 6EA

    21/00153/MDC Submitted 3 Mar 2021 0m away

    Submission of particulars and samples of the materials to be used on the proposed balustrade and plant screen pursuant to condition 8 (a) of planning permission 20/00385/FULL dated 13 August 2020.

    Granted Conditions 7 docs
  • Chartered Accountants Hall Moorgate Place London EC2R 6EA

    26/00922/MDC Submitted 29 Jun 2026 13m away

    99% historically approved · decision due ~24 Aug

    Submission of details of decorative stone repairs and reinstatement pursuant to partial discharge of Condition 4 of planning permission 24/00916/FULL dated 19.11.2024.

    Decided 5 docs
  • Chartered Accountants Hall Moorgate Place London EC2R 6EA

    26/00921/LDC Submitted 29 Jun 2026 13m away

    100% historically approved · decision due ~24 Aug

    Submission of details of decorative stone repairs and reinstatement pursuant to partial discharge of Condition 4 of listed building consent 24/00917/LBC dated 19.11.2024.

    Decided Lawful development 5 docs
  • 46 Moorgate London EC2R 6EL

    21/00598/FULL Submitted 12 Jul 2021 16m away

    Internal refurbish and re-arrangement of the existing building associated with a proposed change of use from office accommodation (Class E-g) to a hotel (C1) on levels 2 to 7, with a ground floor entry/lobby and separate restaurant/bar (Class E-b) on the basement levels, ground and first floor of the building; The existing level 8 plant room removed and replaced with the upper part of a duplex hotel suite with associated external alterations (rendering, new windows, infilling of existing window openings, and installation of black metal railings); Installation of new PV Panels on the roof level; and other associated works.

    Refused Full applications Windows or glazing 68 docs
  • 48 - 54 Moorgate London EC2R 6EJ

    25/00989/FULL Submitted 25 Jul 2025 27m away

    Installation of new plant to be installed on existing concrete slab at upper ground floor roof level.

    Granted Full applications 11 docs
  • 48 - 54 Moorgate London EC2R 6EJ

    25/00988/FULL Submitted 25 Jul 2025 27m away

    Shopfront alterations including: (i) Installation of bi-parting automatic doors and (ii) new shopfront glazing and frames.

    Granted Full applications Windows or glazing 11 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications