Planning application
100, 106 & 107 Leadenhall Street London EC3A 3BP
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application under Section 73 of the Town and Country Planning Act 1990 to vary condition: Condition 60 (Plans and particulars) of planning permission reference 18/00152/FULEIA and Conditions 62 (floor areas) and 63 (use restrictions) (of non-material amendment reference 22/00373/NMA) to enable minor material amendments to the approved scheme including: (i) alterations to structural, mechanical and ventilation systems; (ii) reconfigured ground floor to provide new access routes; (iii) increase in retail provision; (iv) new restaurant on upper levels and (v) associated alterations to facade and basement configuration.
As published by the council, reference 22/00790/FULEIA
Application record
- Reference
- 22/00790/FULEIA
- Type
- Full Planning Permission with EIA
- Status
- Decided
- Decision
- Approved
- Received
- 19 Aug 2022
- Validated
- 19 Aug 2022
- Decided
- 24 May 2023
- Ward
- Aldgate
- Decision by
- Delegated Decision
- Postcode
- EC3A 3BP
Site history
Applications at this address on the City of London register
This site has had 2 applications since 2022: 2 approved, 0 refused.
-
23/00851/CLOPD Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Certificate of Lawful Development (Proposed) for confirmation that works including the demolition of the enclosure of part of the existing lift motor room at roof level of the site constitutes a material operation for the purposes of s.56(4) of the Town and Country Planning Act 1990 (as amended), pursuant to condition 1 (time limit) of planning permission 18/00152/FULEIA (dated 27.03.2019).
Timeline
Dates from the published record
-
19 Aug 2022
Received by City of London
-
24 May 2023
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
24/00049/MDC Awaiting decision
100 Leadenhall Street London EC3A 3BP
Submission of details; no works except demolition to basement slab level shall take place until the developer has secured the implementation of a programme of archaeological work to be carried out in accordance with a written scheme of investigation pursuant to condition 5 of planning permission 22/00790/FULEIA dated 24/05/2023.
Who's behind it
Company information only, from the register and Companies House
Agent on file
2,025 applications on PlanIndex · across 33 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
80 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 24 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
100 Leadenhall Street London EC3A 3BP
100% historically approved · decision due ~14 Mar
Submission of details; no works except demolition to basement slab level shall take place until the developer has secured the implementation of a programme of archaeological work to be carried out in accordance with a written scheme of investigation pursuant to condition 5 of planning permission 22/00790/FULEIA dated 24/05/2023.
Awaiting decision Conditions Demolition 4 docs -
88 Leadenhall Street London EC3A 3BP
99% historically approved · decision due ~9 May
Installation of 12no. antennas, 4no. 300mm satellite dishes, 6no. equipment cabinets and ancillary development at roof level.
Awaiting decision Full applications 15 docs -
100, 106 & 107 Leadenhall Street London EC3A 3BP
Certificate of Lawful Development (Proposed) for confirmation that works including the demolition of the enclosure of part of the existing lift motor room at roof level of the site constitutes a material operation for the purposes of s.56(4) of the Town and Country Planning Act 1990 (as amended), pursuant to condition 1 (time limit) of planning permission 18/00152/FULEIA (dated 27.03.2019).
Granted Lawful development Demolition 10 docs -
Outside 40 Leadenhall Street London EC3A 2BJ
Temporary installation of two sculptures - 'Untitled' & 'Untitled' by Daniel Silver - for a period of up to 2 years, to be taken down on or before 20th July 2026.
Granted Full applications 8 docs -
Cunard Place London EC3A 3BP
Temporary installation of an artwork composed of four sculptures for a period of up to two years to be taken down on or before 29 May 2023: Reactivity by Regitze Engelsborg Karlsen.
Granted Full applications 10 docs -
52 - 56 Leadenhall Street London EC3A 2BJ
NOTIFICATION UNDER THE ELECTRONIC COMMUNICATIONS CODE (CONDITIONS AND RESTRICTIONS) REGULATIONS 2003 (AS AMENDED) TO UTILISE PERMITTED DEVELOPMENT RIGHTS AT CTIL_306137_00, 52-56 LEADENHALL STREET, ALDGATE, LONDON, EC3A 2BJ (NGR: 533383, 181111)
Withdrawn 6 docs
Other full applications
In City of London
-
26/00041/FULL Granted
The Aldgate School St James's Passage London EC3A 5DE
Refurbishment of existing commercial kitchen and new extract ventilation ductwork
-
26/00659/FULL Granted
30 Gresham Street London EC2V 7PG
Creation of a new entrance on Gresham Street and enhancement of existing main entrance.
-
26/00539/FULL Granted
Basement Pair North 6 King's Bench Walk London EC4Y 7DR
External installation of a new free-standing condenser and associated services within rear lightwell.
-
26/01207/FULL Awaiting decision
25 Gresham Street London EC2V 7HN
Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.
-
26/01202/FULL Awaiting decision
2 Moorgate London EC2R 6AG
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.