Planning application
100, 106 & 107 Leadenhall Street London EC3A 3BP
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Application under Section 73 of the Town and Country Planning Act 1990 to vary condition: Condition 60 (Plans and particulars) of planning permission reference 18/00152/FULEIA and Conditions 62 (floor areas) and 63 (use restrictions) (of non-material amendment reference 22/00373/NMA) to enable minor material amendments to the approved scheme including: (i) alterations to structural, mechanical and ventilation systems; (ii) reconfigured ground floor to provide new access routes; (iii) increase in retail provision; (iv) new restaurant on upper levels and (v) associated alterations to facade and basement configuration.
As published by the council, reference 22/00790/FULEIA
Application record
- Reference
- 22/00790/FULEIA
- Type
- Full Planning Permission with EIA
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 19 Aug 2022
- Validated
- 19 Aug 2022
- Decided
- 24 May 2023
- Ward
- Aldgate
- Decision by
- Delegated Decision
- Postcode
- EC3A 3BP
Site history
Applications at this address on the City of London register
This site has had 9 applications since 2022: 8 approved, 0 refused.
-
23/01154/MDC Withdrawn
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of: District Heating Network Connection Opportunities report and Consultation with NATS reports pursuant to conditions 16 & 20 respectively of planning permission 22/00790/FULEIA dated 24.05.2023.
-
23/01049/PODC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Development Programme pursuant to Schedule 3, Paragraph 8.4 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
-
23/01050/PODC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Local Training Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3, Paragraph 3.1 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
-
23/01048/PODC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of details of utility connections pursuant to Schedule 3, Paragraph 14.1 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
-
23/01047/PODC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Highway Schedule of Condition Survey pursuant to Schedule 3, Paragraph 8.1 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
-
23/00851/CLOPD Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Certificate of Lawful Development (Proposed) for confirmation that works including the demolition of the enclosure of part of the existing lift motor room at roof level of the site constitutes a material operation for the purposes of s.56(4) of the Town and Country Planning Act 1990 (as amended), pursuant to condition 1 (time limit) of planning permission 18/00152/FULEIA (dated 27.03.2019).
-
23/00816/MDC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Deconstruction Logistics Plan pursuant to condition 2, Noise Dust Protection Scheme pursuant to condition 6 and Non-Road Mobile Machinery Guide pursuant to condition 7 of planning permission 22/00790/FULEIA dated 24.05.2023.
-
23/00796/MDC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of details for (i) a detailed site investigation to establish if the site is contaminated and to determine the potential for pollution of the water environment pursuant to condition 12; (ii) a Base-Line Terrestrial Television and Radio Interference Study to assess terrestrial television and radio reception to residential properties in the vicinity of the site pursuant to condition 14; and (iii) full details of the pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy Statement, that demonstrates that the development is designed to meet the relevant targets set out in the GLA Circular Economy Statement Guidance pursuant to condition 21(a) of planning permission 22/00790/FULEIA dated 24/05/2023.
Timeline
Dates from the published record
-
19 Aug 2022
Received by City of London
-
24 May 2023
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
9 later applications on the register refer to this one:
-
24/00049/MDC Awaiting decision
100 Leadenhall Street London EC3A 3BP
Submission of details; no works except demolition to basement slab level shall take place until the developer has secured the implementation of a programme of archaeological work to be carried out in accordance with a written scheme of investigation pursuant to condition 5 of planning permission 22/00790/FULEIA dated 24/05/2023.
-
23/01154/MDC Withdrawn
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of: District Heating Network Connection Opportunities report and Consultation with NATS reports pursuant to conditions 16 & 20 respectively of planning permission 22/00790/FULEIA dated 24.05.2023.
-
23/01030/MDC Granted
100 Leadenhall Street London EC3A 3BP
Submission of a site survey and survey of highway and other land at the perimeter of the site indicating the proposed finished floor levels at basement and ground floor levels in relation to the existing Ordnance Datum levels of the adjoining streets and open spaces pursuant to condition 11 of planning permission 22/00790/FULEIA dated 24/05/2023.
-
23/01049/PODC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Development Programme pursuant to Schedule 3, Paragraph 8.4 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
-
23/01050/PODC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Local Training Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3, Paragraph 3.1 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
-
23/01048/PODC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of details of utility connections pursuant to Schedule 3, Paragraph 14.1 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
-
23/01047/PODC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Highway Schedule of Condition Survey pursuant to Schedule 3, Paragraph 8.1 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
-
23/00816/MDC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Deconstruction Logistics Plan pursuant to condition 2, Noise Dust Protection Scheme pursuant to condition 6 and Non-Road Mobile Machinery Guide pursuant to condition 7 of planning permission 22/00790/FULEIA dated 24.05.2023.
-
23/00796/MDC Granted
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of details for (i) a detailed site investigation to establish if the site is contaminated and to determine the potential for pollution of the water environment pursuant to condition 12; (ii) a Base-Line Terrestrial Television and Radio Interference Study to assess terrestrial television and radio reception to residential properties in the vicinity of the site pursuant to condition 14; and (iii) full details of the pre-demolition audit in accordance with section 4.6 of the GLA's adopted Circular Economy Statement, that demonstrates that the development is designed to meet the relevant targets set out in the GLA Circular Economy Statement Guidance pursuant to condition 21(a) of planning permission 22/00790/FULEIA dated 24/05/2023.
Who's behind it
Company information only, from the register and Companies House
DP9 Ltd Agent
Active · incorporated 2004
2,604 applications on PlanIndex · across 36 councils · 98% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
80 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 24 May 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
100 Leadenhall Street London EC3A 3BP
Submission of a site survey and survey of highway and other land at the perimeter of the site indicating the proposed finished floor levels at basement and ground floor levels in relation to the existing Ordnance Datum levels of the adjoining streets and open spaces pursuant to condition 11 of planning permission 22/00790/FULEIA dated 24/05/2023.
Granted Conditions 6 docs -
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Development Programme pursuant to Schedule 3, Paragraph 8.4 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
Granted 3 docs -
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Local Training Skills and Job Brokerage Strategy (Demolition) pursuant to Schedule 3, Paragraph 3.1 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
Granted Demolition 4 docs -
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of details of utility connections pursuant to Schedule 3, Paragraph 14.1 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
Granted 4 docs -
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of a Highway Schedule of Condition Survey pursuant to Schedule 3, Paragraph 8.1 of the S106 Agreement dated 27 March 2019 (planning ref: 18/00152/FULEIA) as amended by the Deed of Variation dated 11 May 2023 (planning ref: 22/00790/FULEIA).
Granted 4 docs -
100, 106 & 107 Leadenhall Street London EC3A 3BP
Submission of: District Heating Network Connection Opportunities report and Consultation with NATS reports pursuant to conditions 16 & 20 respectively of planning permission 22/00790/FULEIA dated 24.05.2023.
Withdrawn Conditions 7 docs
Other full applications
In City of London
-
25/01794/FULL Granted
50 Cannon Street London EC4N 6JJ
Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.
-
26/00865/FULL Granted
9 Newbury Street London EC1A 7HU
Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.
-
26/01110/FULL Granted
200 Aldersgate Street London EC1A 4HD
Retrospective application for the installation of 2no. condenser units to fifth floor roof.
-
26/01109/FULL Granted
100 Bishopsgate London EC2N 4AA
Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.
-
26/01053/FULL Granted
49 Cheapside London EC2V 6AT
Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass