100 Fetter Lane London EC4A 1ES

Granted City of London 21/00534/FULMAJ Full Major Application

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of 100 Fetter Lane and construction of a new building for office use (Class E) and a flexible commercial unit (Class E(a)(b)(c)(d)), comprising a basement level, ground, mezzanine and 12 upper storeys plus roof plant level, creation of a new pedestrian route and pocket square at ground level, ancillary cycle parking, servicing, plant and enabling works.

As published by the council, reference 21/00534/FULMAJ

Application record

Reference
21/00534/FULMAJ
Type
Full Major Application
Status
Decided
Decision
Granted As published: Approved
Received
18 Jun 2021
Validated
21 Jun 2021
Decided
29 Sep 2021
Ward
Farringdon Without
Decision by
Committee Decision
Postcode
EC4A 1ES

Site history

Applications at this address on the City of London register

This site has had 7 applications since 2021: 7 approved, 0 refused.

  • 25/00890/ADVT Granted

    100 Fetter Lane London EC4A 1ES

    Installation and display of one illuminated fascia signage measuring 2441mm wide and 304mm high and one illuminated projecting signage measuring 600mm wide and 820mm high.

    Decided 17 Feb 2026 Advertising
  • 25/00414/MDC Granted

    100 Fetter Lane London EC4A 1ES

    Submission of details pursuant to discharge of condition 32 of planning permission ref.21/00454/FULMAJ dated 29.09.2021.

    Decided 5 Jun 2025 Conditions
  • 25/00273/MDC Granted

    100 Fetter Lane London EC4A 1ES

    Submission of Whole Life Carbon Assessment and Circular Economy Statement pursuant to condition 24 and 27 of planning permission ref. 21/00454/FULMAJ dated 29.09.2021.

    Decided 29 Jul 2025 Conditions
  • 25/00264/PODC Granted

    100 Fetter Lane London EC4A 1ES

    Submission of notice of completion of the Public Route and Sunken Garden pursuant to Schedule 3, Paragraph 11.2.5 and Schedule 3, Paragraph 12.2 of the Section 106 agreement dated 29th September 2021 (planning ref. 21/00454/FULMAJ).

    Decided 26 Feb 2025
  • 24/01333/MDC Granted

    100 Fetter Lane London EC4A 1ES

    Submission of details of Operational Management Plan of the public house pursuant to condition 30 of planning permission 21/00454/FULMAJ dated 29.09.2021.

    Decided 27 Feb 2025 Conditions
  • 22/00484/MDC Granted

    100 Fetter Lane London EC4A 1ES

    Submission of particulars and samples of the materials to be used on all external faces of the building including external ground and upper-level surfaces pursuant to condition 22 part a of planning permission ref 21/00454/FULMAJ dated 29th September 2021.

    Decided 20 Dec 2022 Conditions

Timeline

Dates from the published record

  1. 18 Jun 2021

    Received by City of London

  2. 21 Jun 2021

    Validated

    Checked as complete and ready for consideration.

  3. 29 Sep 2021

    Decision issued: Approved

  4. 29 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

181 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of London granted permission on 29 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 100 And 108 Fetter Lane London EC4A 1ES

    22/01231/PODC Submitted 15 Dec 2022 50 yards away

    Submission of the Local Procurement Strategy and Local Training Skills and Job Brokerage Strategy for Construction, pursuant to schedule 3 paragraph 2.6 and 3.5 of the S106 agreement dated 29 September 2021 planning application reference 21/00454/FULMAJ.

    Granted 4 docs
  • 100 And 108 Fetter Lane London EC4A 1ES

    25/00651/MDC Submitted 15 May 2025 50 yards away

    100% historically approved · decision due ~10 Jul

    Submission of WELL Report pursuant to discharge of condition 25 of planning permission 21/00454/FULMAJ dated 29.09.2021.

    Awaiting decision Conditions 4 docs
  • 100 And 108 Fetter Lane London EC4A 1ES

    21/00454/FULMAJ Submitted 1 Jun 2021 50 yards away

    Demolition of 100 and 108 Fetter Lane and construction of a new building for office use (Class E) and a public house comprising a basement level, ground, mezzanine and 12 upper storeys plus roof plant level, creation of a new pedestrian route and pocket square at ground level, ancillary cycle parking, servicing, plant and enabling works.

    Granted Full applications Demolition 166 docs
    Major scheme
  • 100 And 108 Fetter Lane London EC4A 1ES

    22/00999/MDC Submitted 17 Oct 2022 50 yards away

    Submission of details to discharge condition (19) Green roofs and (20) irrigation and maintenance of planning permission 21/00454/FULMAJ dated 29th September 2021.

    Granted Conditions 12 docs
  • 100 And 108 Fetter Lane London EC4A 1ES

    22/01253/PODC Submitted 1 Mar 2022 50 yards away

    Submisson of a Public Route Specification And Method Statement, Public Route And Sunken Garden Management Plan and Sunken Garden Specification And Method Statement, pursuant to Schedule 3, Paragraphs 11.2.1, 11.2.2 and 11.3.1 of the Section 106 Agreement dated 29.09.2021 (planning ref. 21/00454/FULMAJ).

    Granted 6 docs
  • 100 And 108 Fetter Lane London EC4A 1ES

    22/00963/MDC Submitted 7 Oct 2022 50 yards away

    Submission of details to discharge conditions (22) (I) Ground level surfaces including materials, (22) (m) public route, (22) (h) External Terraces and to discharge Condition (21) Landscaping details of planning permission 21/00454/FULMAJ dated 29th September 2021.

    Granted Conditions 14 docs

In City of London

  • 25/01794/FULL Granted

    50 Cannon Street London EC4N 6JJ

    Refurbishment of existing office building with works including: creation of roof terraces, extension of existing lift shaft, replacement and relocation of existing rooftop plant and associated structures, changes to internal car and cycle parking arrangements, and improvements to the building's facade.

    Received 22 Dec, published by the council 24 Jul 2026 Full applications
  • 26/00865/FULL Granted

    9 Newbury Street London EC1A 7HU

    Extensions and alterations to the rear and interior of the existing office building (Use Class E) to provide (i) upgraded office space at lower ground and ground floors; (ii) conversion from office to one studio flat and one 1-bed dwelling (Use Class C3) at 1st to 3rd floors; and (iii) provision of a 1-bed dwelling within a newly created two storey roof extension at 4th and 5th floors with a roof terrace at 4th floor.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications
  • 26/01110/FULL Granted

    200 Aldersgate Street London EC1A 4HD

    Retrospective application for the installation of 2no. condenser units to fifth floor roof.

    Received 3 Aug, published by the council 20 Aug 2026 Full applications
  • 26/01109/FULL Granted

    100 Bishopsgate London EC2N 4AA

    Installation of artwork along the junction of the landscaped space and the walls of St Ethelburga's Centre of Reconciliation and Peace: Continuum by Halima Cassell.

    Received 3 Aug, published by the council 21 Aug 2026 Full applications
  • 26/01053/FULL Granted

    49 Cheapside London EC2V 6AT

    Shopfront alteration at Unit 1A to replace existing solid blanking panel with clear glass

    Received 27 Jul, published by the council 20 Sep 2026 Full applications