Planning application
65 Holborn Viaduct London EC1A 2FD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Use of the site as a temporary cultural open-air work/event space and garden (Sui Generis) along with the provision of hard and soft landscaping and associated works.
As published by the council, reference 21/00392/FULL
Application record
- Reference
- 21/00392/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approved
- Received
- 18 May 2021
- Validated
- 18 May 2021
- Decided
- 13 Jul 2021
- Ward
- Farringdon Within
- Decision by
- Delegated Decision
- Postcode
- EC1A 2FD
Site history
Applications at this address on the City of London register
This site has had 7 applications since 2021: 6 approved, 0 refused.
-
24/00824/MDC Granted
65 Holborn Viaduct London EC1A 2FD
Submission of a Whole Life Carbon Cycle Assessment pursuant to condition 15 of planning permission 21/00781/FULMAJ dated 02 September 2022.
-
24/00823/MDC Granted
65 Holborn Viaduct London EC1A 2FD
Submission of a Circular Economy Statement pursuant to condition 14 of planning permission 21/00781/FULMAJ dated 02 September 2022.
-
23/00894/MDC Granted
65 Holborn Viaduct London EC1A 2FD
Submission of details of diversion of water mains to prevent the potential for damage to subsurface potable water infrastructure pursuant to condition 7 of planning permission 21/00781/FULMAJ (dated 22.09.2022).
-
23/00723/MDC Granted
65 Holborn Viaduct London EC1A 2FD
Submission of details of the foundations and piling configuration, to include a detailed design and method statement pursuant to condition 13 of planning permission 21/00781/FULMAJ dated 02/09/2022.
-
23/00539/MDC Awaiting decision
65 Holborn Viaduct London EC1A 2FD
Submission of details pursuant to conditions 3 (sewer vents), 9 (flooding and SuDS), and 61 (SuDS maintenance) of planning permission 21/00781/FULMAJ dated 02.09.2022.
-
21/00528/ADVT Granted
65 Holborn Viaduct London EC1A 2FD
Installation and display of a non-illuminated hoarding sign measuring 2.4m high by 150.8m wide, at ground floor level.
Timeline
Dates from the published record
-
18 May 2021
Received by City of London
-
13 Jul 2021
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
2,025 applications on PlanIndex · across 33 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 13 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of a fire safety statement pursuant to conditions 5 and 6 of planning permission 21/00781/FULMAJ, dated 02.09.2022.
Granted Conditions 9 docs -
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of elevations, luminaire schedule, lighting calculations and layout pursuant to discharge of condition 42 of planning permission 22/01243/FULMAJ dated 21.09.2023.
Granted Conditions 8 docs -
61 - 65 Holborn Viaduct London EC1A 2FD
Non-material amendments under Section 96A of the Town and Country Planning Act 1990 (as amended) to planning permission 22/01243/FULMAJ dated 11 October 2023 to: amend the wording of Condition 47 to reduce minimum loading bay headroom from 4.6m to 3.8m.
Granted Amendments 5 docs -
61 - 65 Holborn Viaduct London EC1A 2FD
100% historically approved · decision due ~24 Jun
Submission of water mains plan, piling layout, Circular Economy Statement, Whole Life Cycle Carbon Assessment, Climate Change Resilience, Water contamination, Land contamination and Hostile Vehicle Mitigation Summary Strategy pursuant to Condition 7, 13, 14,15, 16, 17, 18 and 19 of planning permission 21/00781/FULMAJ dated 02.09.2022, as amended by 22/01243/FULMAJ dated 21.09.2023.
Awaiting decision Conditions 18 docs -
61 - 65 Holborn Viaduct London EC1A 2FD
Submission of a Construction Logistics Plan to manage all freight vehicle movements to and from the site during construction of the development pursuant to condition 10 of planning permission 22/01243/FULMAJ dated 03/10/2023.
Granted Conditions 5 docs -
65 Holborn Viaduct London EC1A 2FD
Submission of details of diversion of water mains to prevent the potential for damage to subsurface potable water infrastructure pursuant to condition 7 of planning permission 21/00781/FULMAJ (dated 22.09.2022).
Granted Conditions 8 docs
Other full applications
In City of London
-
26/00041/FULL Granted
The Aldgate School St James's Passage London EC3A 5DE
Refurbishment of existing commercial kitchen and new extract ventilation ductwork
-
26/00659/FULL Granted
30 Gresham Street London EC2V 7PG
Creation of a new entrance on Gresham Street and enhancement of existing main entrance.
-
26/00539/FULL Granted
Basement Pair North 6 King's Bench Walk London EC4Y 7DR
External installation of a new free-standing condenser and associated services within rear lightwell.
-
26/01207/FULL Awaiting decision
25 Gresham Street London EC2V 7HN
Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.
-
26/01202/FULL Awaiting decision
2 Moorgate London EC2R 6AG
Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.