Planning application
20 King Street London EC2V 8EG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Removal of internal walls within 1st floor office spaces.
As published by the council, reference 21/00283/LBC
Application record
- Reference
- 21/00283/LBC
- Type
- Listed Building Consent
- Status
- Decided
- Decision
- Approved
- Received
- 9 Apr 2021
- Validated
- 9 Apr 2021
- Decided
- 2 Jun 2021
- Ward
- Cheap
- Decision by
- Delegated Decision
- Postcode
- EC2V 8EG
Timeline
Dates from the published record
-
9 Apr 2021
Received by City of London
-
2 Jun 2021
Decision issued: Approved
-
10 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
City of London granted permission on 2 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
46 Gresham Street London EC2V 7AY
Installation and display of One No. 375mm high by 750mm wide externally illuminated projecting sign with 200mm wide top housing lighting at height of 3110 mm above ground level.
Granted Advertising 12 docs -
46 Gresham Street London EC2V 7AY
Repainting shopfront in dark grey colour.
Granted Lawful development Windows or glazing 10 docs -
9 King Street London EC2V 8EA
99% historically approved · decision due ~11 Jun
Installation of two condensing units at roof level.
Awaiting decision Full applications 10 docs -
13-14 King Street London EC2V 8EA
Submission of Archaeological Scheme of Investigation for discharge of condition 11 pursuant to planning permission 20/00396/FULL dated 08.09.2020.
Granted Conditions 5 docs -
14 King Street London EC2V 8EA
Submission of a Construction Logistics Plan pursuant to Condition 16 of planning permission 20/00396/FULL dated 08/09/2020.
Granted Conditions 3 docs -
13 - 14 King Street London EC2V 8EA
Submission of a scheme for protecting nearby residents and commercial occupiers from noise, dust and other environmental effects pursuant to condition 2 of planning permission 20/00396/FULL dated 08/09/2020.
Granted Conditions 6 docs
Other heritage and listed building applications
In City of London
-
26/01222/LBC Awaiting decision
Rising Sun Public House 61 Carter Lane London EC4V 5DY
Installation of 2no. eyebolt fixings to northern elevation to hold catenary wires to facilitate festive lighting and decoration displays
-
26/01212/LBC Awaiting decision
St Mary Abchurch House 123 - 127 Cannon Street London EC4N 5AU
Installation of internal secondary glazing to the existing windows at first to fifth-floor levels
-
26/00342/LBC Withdrawn
89 Speed House Barbican London EC2Y 8AU
Removal of non-structural partitions in the kitchen to create an open-plan kitchen.
-
26/01195/LBC Awaiting decision
2 Moorgate London EC2R 6AG
Alterations to a listed building including: extension at roof level and introduction of a roof terrace, upgrades to facade including entrance doorset and glazing, internal and MEP upgrades, with associated works.
-
26/00385/LBC Granted
Adelaide House London Bridge London EC4R 9HA
External repair works (part retrospective) to facade, including (i) repairs to brickwork including repointing of mortar where necessary, (ii) replacement of Portland Stone where damaged, and (iii) mortar repair works to lintels and cills throughout each facade.