Planning application

Land Bounded By Charterhouse Street, Lindsey Street, Long Lane & Hayne Street London EC1

Granted City of London 19/01135/MDC Submission of details (Planning)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Submission of details of a mechanical plant mountings pursuant to condition 21 of planning permission (appeal decision reference APP/K5030/A/15/3069991) dated 20/01/2016.

As published by the council, reference 19/01135/MDC

Application record

Reference
19/01135/MDC
Type
Submission of details (Planning)
Status
Decided
Decision
Approved
Received
28 Oct 2019
Validated
28 Oct 2019
Decided
3 Dec 2019
Ward
Farringdon Within
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 28 Oct 2019

    Received by City of London

  2. 3 Dec 2019

    Decision issued: Approved

  3. 18 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

63 applications on PlanIndex · across 15 councils · 95% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 4 Lindsey Street London EC1A 9HP

    25/01422/DPAR Submitted 15 Oct 2025 17m away

    An application for Prior Approval under Schedule 2, Part 14, Class J of the Town and Country Planning (General Permitted Development) Order 2015 (as amended) for the installation of solar PV panels on the roof of the building.

    Granted Outline 14 docs
  • Land Bounded By Charterhouse Street, Lindsey Street, Long Lane And Hayne Street London EC1

    25/01528/PODC Submitted 6 Nov 2025 17m away

    Submission of the Delivery and Servicing Management Plan pursuant to Schedule 3 Paragraph 8.3 of the Section 106 Agreement dated 07 December 2015 (Planning Application Reference 13/00605/FULEIA).

    Granted 6 docs
  • 85 Charterhouse Street London EC1M 6AG

    26/01063/OBS Submitted 28 Jul 2026 25m away

    99% historically approved · decision due ~22 Sep

    Consultation by the London Borough of Islington on application for change of Use from existing mixed use (restaurant/nightclub) Sui Generis Use Class to a Class E (Commercial) Use Class across the whole building. Additional works include the creation of a roof level terrace space and the refurbishment of an existing terrace at rear first floor level, new windows to the front and rear elevation, replacement of mechanical plant and machinery at roof level, refurbishment of façade and improvements to the existing entrance. (REASON FOR RECONSULTATION: The description of development has been updated).

    Awaiting decision Windows or glazing 3 docs
  • 18 - 19 Long Lane London EC1A 9PL

    24/00153/FULL Submitted 13 Feb 2024 36m away

    Change of use from education use (Class F1) to office use (Class E), office/retail use at ground floor (Class E) and retention of basement and ground floor retail space for cafe use (Class E), roof extensions, refurbishment, facade improvements and associated ancillary facilities including plant, refuse storage, cycle storage and all other necessary works.

    Granted Full applications Extension 53 docs
  • 33 - 37 Charterhouse Square London EC1M 6EA

    21/00057/MDC Submitted 26 Jan 2021 41m away

    Submission of details of the provision for disabled people to obtain access to the building;; a Construction and Environmental Plan, a Traffic Management and Construction Logistics Plan pursuant to conditions 2, 3 and 4 of planning permission dated 22nd August 2019 (19/00119/FULL).

    Granted Conditions 12 docs
  • 33 - 37 Charterhouse Square London EC1M 6EA

    21/00099/MDC Submitted 15 Feb 2021 41m away

    Submission of details of particulars and samples of the materials to be used on all external faces of the building; including external ground and upper level surfaces; details of the proposed glazed enclosures, fenestration and all entrances; details of the mesh barrier; details of the graphic design for the glazing and balustrade; details of any external service equipment rising above the fascia pursuant to condition 5 (parts a, c, d, e) of planning permission 20/00568/FULL dated 16.12.2020.

    Granted Conditions Windows or glazing 20 docs

In City of London

  • 26/00710/MDC Granted

    1 Exchange Square London EC2A 2JN

    Submission of ventilation details and fume extract arrangements pursuant to discharge of condition 17 of planning permission 21/00930/FULMAJ dated 14.06.2023.

    15 May 2026 Conditions
  • 25/01327/MDC Granted

    1 New Change London EC4M 9AF

    Submission of an Inclusive Access Management Plan prior to the first occupation of the development for (a) the library use (F1 use); pursuant to condition 9a of planning permission 24/00481/FULL dated 06/12/2024.

    29 Sep 2025 Conditions
  • 26/00933/MDC Granted

    122 Minories And 14 Crosswall London EC3N 1NT

    Submission of Circlular Economy Post Completion Report and Circular Economy Statements pursuant to discharge of Condition 23 of planning permission 22/00035/FULMAJ dated 09.08.2022.

    30 Jun 2026 Conditions
  • 26/00667/MDC Granted

    9A - 9B Crutched Friars London EC3N 2AU

    Submission of details of Construction Management Plan pursuant to condition 4 of Planning Permission 23/00895/FULL dated 10.05.2024.

    7 May 2026 Conditions
  • 25/01673/MDC Granted

    54 King William Street London EC4R 9AD

    Submission of details of plant noise and installation pursuant to condition 2 (part B) of planning permission 24/00504/FULL dated 03/04/2025.

    1 Dec 2025 Conditions