Skip to content
PlanIndex Get alerts
Menu

Planning application

City Point Ropemaker Street London EC2Y 9AW

Granted City of London 19/01118/FULL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Use of part of City Point Plaza for a temporary market between 3rd December to 23rd December 2019.

As published by the council, reference 19/01118/FULL

Application record

Reference
19/01118/FULL
Type
Full Planning Permission
Status
Decided
Decision
Approved
Received
22 Oct 2019
Validated
22 Oct 2019
Decided
3 Dec 2019
Ward
Coleman Street
Decision by
Delegated Decision
Postcode
EC2Y 9AW

Timeline

Dates from the published record

  1. 22 Oct 2019

    Received by City of London

  2. 3 Dec 2019

    Decision issued: Approved

  3. 18 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

2,030 applications on PlanIndex · across 33 councils · 98% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

City of London granted permission on 3 December 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 1 Ropemaker Street London EC2Y 9AW

    23/00482/FULL Submitted 11 May 2023 7m away

    Temporary installation of sculptures for a temporary period between 29th May 2023 to 31st September 2023.

    Withdrawn Full applications 11 docs
  • Tenter House 45 Moorfields London EC2Y 9AE

    26/00810/MDC Submitted 3 Jun 2026 52m away

    99% historically approved · decision due ~29 Jul

    Submission of details of Scheme for the Provision of Sewer Vents, Public Health Services Roof Drainage Layout, Public Health Services Roof Drainage Layout, Public Health Services Sanitary Drainage and New Sewer Connection Details and Section Southern Outfall pursuant to condition 8 of Planning permission 24/00209/FULMAJ dated 14.10.2025 (as amended 25/01531/NMA).

    Decided 8 docs
  • Tenter House 45 Moorfields London EC2Y 9AE

    26/00808/MDC Submitted 3 Jun 2026 52m away

    99% historically approved · decision due ~29 Jul

    Submission of details of a Piling Method Statement pursuant to conditions 73 and 75 of Planning permission 24/00209/FULMAJ dated 14.10.2025 (as amended 25/01531/NMA).

    Decided 7 docs
  • Tenter House 45 Moorfields London EC2Y 9AE

    26/00778/MDC Submitted 28 May 2026 52m away

    99% historically approved · decision due ~23 Jul

    Submission of details of stage 1 WSI for an Archaeological Evaluation and Archaeological Evaluation Report pursuant to part of condition 19 of Planning Permission 24/00209/FULMAJ dated 14.10.2025 (as amended 25/01531/NMA).

    Awaiting decision 8 docs
  • Tenter House 45 Moorfields London EC2Y 9AE

    26/00779/MDC Submitted 28 May 2026 52m away

    99% historically approved · decision due ~23 Jul

    Submission of details of Utility Connections Note, DNIA Resilient Route Map, Thames Water Point of Entry and Combined Services - Proposed Incoming Services pursuant to condition 77 of Planning Permission 24/00209/FULMAJ dated 14.10.2025 (as amended 25/01531/NMA).

    Awaiting decision 9 docs
  • Tenter House 45 Moorfields London EC2Y 9AE

    26/01028/PODC Submitted 15 Jul 2026 52m away

    99% historically approved · decision due ~23 Sep

    Submission of the utility connections pursuant to Schedule 3 Paragraph 10.1 of the S106 Agreement dated 13 October 2025 (Planning Application Reference: 24/00209/FULMAJ).

    Awaiting decision 7 docs

In City of London

  • 26/00041/FULL Granted

    The Aldgate School St James's Passage London EC3A 5DE

    Refurbishment of existing commercial kitchen and new extract ventilation ductwork

    13 Jan 2026 Full applications
  • 26/00659/FULL Granted

    30 Gresham Street London EC2V 7PG

    Creation of a new entrance on Gresham Street and enhancement of existing main entrance.

    6 May 2026 Full applications
  • 26/00539/FULL Granted

    Basement Pair North 6 King's Bench Walk London EC4Y 7DR

    External installation of a new free-standing condenser and associated services within rear lightwell.

    16 Apr 2026 Full applications
  • 26/01207/FULL Awaiting decision

    25 Gresham Street London EC2V 7HN

    Works to the ninth floor terrace comprising: (i) improvements to access, (ii) installation of planters and seating, (iii) installation of a new glazed balustrade, (iv) installation of LED lighting, and (v) other associated works.

    25 Aug 2026 Full applications
  • 26/01202/FULL Awaiting decision

    2 Moorgate London EC2R 6AG

    Refurbishment and extension of the existing office building to: introduce a roof terrace amenity space and extension at sixth level 06, upgrade rooftop plant enclosures, undertake facade improvements and internal upgrades, with other associated works.

    21 Aug 2026 Full applications