Skip to content
PlanIndex Get alerts
Menu

Planning application

25/06660/FUL

3 Academy Park Edinburgh EH6 8JL

Awaiting decision City of Edinburgh Planning Permission

Proposal

Replacement entrance lobby extension + external access ramp. Replacement blocks to rear stair with new curtain wall glazing. Replacement of 9 existing glazed smoke vent windows. Replacement sunroom window to SW gable.

As published by the council, reference 25/06660/FUL

Timeline

Dates from the published record

  1. 19 Dec 2025

    Received by City of Edinburgh

  2. 28 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25/06228/TCO Decided

    Flat 1 4 Lochend Road Lochend Edinburgh EH6 8BR

    Three cherry trees T1-T3 pruning of trees to allow access for essential roof maintenance works. Prune trees back to create 1 metre clearance from roof.

    26 Nov 2025 45m away Trees
  • 25/05779/TCO Awaiting decision

    11 Ashville Terrace Edinburgh EH6 8DD

    T1 Willow remove to ground level.

    3 Nov 2025 292m away Trees
  • 25/06679/FUL Awaiting decision

    25 Ashville Terrace Lochend Edinburgh EH6 8DD

    To install four velux roof windows, two to the front roof slope and two to the rear roof slope.

    23 Dec 2025 323m away Full applications
  • 25/06289/TCO Decided

    29 Ashville Terrace Edinburgh EH6 8DD

    Ash, remove the tree due to a current safety hazard from the roots and future problems with its location.

    1 Dec 2025 342m away Trees
  • 25/06255/CLESTL Awaiting decision

    1F2 64 Lorne Street Edinburgh EH6 8QF

    The property has been operating as a serviced accommodation /short term let.

    27 Nov 2025 372m away Lawful development
  • 25/05963/LBC Decided

    1A Wellington Place South Leith Edinburgh EH6 7EQ

    Replace existing window sashes with new double glazed units; form new extract terminals

    12 Nov 2025 378m away Heritage and listed buildings

In City of Edinburgh

  • 25/06546/FULSTL Refused

    2 Leopold Place Edinburgh EH7 5JW

    Retrospective change of use of premises to short term let accommodation.

    16 Dec 2025 Full applications
  • 25/06555/FULSTL Refused

    3F3 8 Jeffrey Street Edinburgh EH1 1DT

    Retrospective change of use of premises to short-term let accommodation.

    16 Dec 2025 Full applications
  • 26/00285/FUL Granted

    27 York Place, 29 York Place Edinburgh EH1 3HP

    Proposed change the use of No 29 York Place from Office to Hotel Use and combine with no. 27 York Place to create a hotel annex. (AS AMENDED)

    26 Jan 2026 Full applications
  • 25/06484/FUL Withdrawn

    544 Gorgie Road Edinburgh EH11 3AL

    Change of Use from Class 1A (retail unit) to Class 3 (restaurant/takeaway), install ventilation and extraction flue.

    11 Dec 2025 Full applications
  • 25/06526/FUL Granted

    29 Craigmillar Park Edinburgh EH16 5PE

    Remove existing rear extension and form new two storey rear extension to create living accommodation for owners.

    15 Dec 2025 Full applications