Proposal
Stabilisation and consolidation of the facade involves wrapping the existing facade in a light gauge stainless steel open mesh system.
As published by the council, reference 25/06565/FUL
Timeline
Dates from the published record
-
17 Dec 2025
Received by City of Edinburgh
-
22 Dec 2025
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
25/06568/LBC Awaiting decision
David Hume Tower 40 George Square Edinburgh EH8 9LL
Light gauge stainless steel mesh will be secured to the building's superstructure.
-
25/06088/CLP Refused
David Hume Tower 40 George Square Southside Edinburgh EH8 9LL
Proposals for 40 George Square with the focus shifting to stabilisation and consolidation of the facade for health & safety reasons. We are currently in early stages of exploring options for this which includes a light gauge stainless steel open mesh system offering robust protection against slate failure. This would be tension tight to the slate and windows to secure the fabric and would cover the principle elevations.
-
25/06644/FUL Awaiting decision
Appleton Tower 11 Crichton Street Edinburgh EH8 9LE
Install an enclosure around an existing generator and a replacement chiller unit.
-
26/00190/LBC Awaiting decision
58 - 60 George Square Southside Edinburgh EH8 9JU
Proposed fire rated enclosure of main switchgear and relocation of existing door to B.15.
-
25/06134/LBC Awaiting decision
30 George Square Southside Edinburgh EH8 9LJ
Alter west elevation to create louvred grilles in turn connected to internal ductwork within services areas.
-
25/05824/CLP Awaiting decision
38 Potterrow Edinburgh EH8 9BT
Proposed replacement cladding with no change to visual appearance.
Other full applications applications
In City of Edinburgh
-
25/06546/FULSTL Refused
2 Leopold Place Edinburgh EH7 5JW
Retrospective change of use of premises to short term let accommodation.
-
25/06555/FULSTL Refused
3F3 8 Jeffrey Street Edinburgh EH1 1DT
Retrospective change of use of premises to short-term let accommodation.
-
26/00285/FUL Granted
27 York Place, 29 York Place Edinburgh EH1 3HP
Proposed change the use of No 29 York Place from Office to Hotel Use and combine with no. 27 York Place to create a hotel annex. (AS AMENDED)
-
25/06484/FUL Withdrawn
544 Gorgie Road Edinburgh EH11 3AL
Change of Use from Class 1A (retail unit) to Class 3 (restaurant/takeaway), install ventilation and extraction flue.
-
25/06526/FUL Granted
29 Craigmillar Park Edinburgh EH16 5PE
Remove existing rear extension and form new two storey rear extension to create living accommodation for owners.