Skip to content
PlanIndex Get alerts
Menu

Planning application

34 Buckstone Dell Edinburgh EH10 6PG

Granted City of Edinburgh 23/03008/FUL Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of single storey porch to front entrance, single storey rear extension and internal alterations to form new bedroom at ground floor.

As published by the council, reference 23/03008/FUL

Application record

Reference
23/03008/FUL
Type
Planning Permission
Status
Application Granted
Decision
Granted
Received
12 Jul 2023
Validated
13 Jul 2023
Decided
15 Aug 2023
Ward
Colinton/Fairmilehead
Parish
Fairmilehead
Decision by
Local Delegated Decision
Postcode
EH10 6PG

Timeline

Dates from the published record

  1. 12 Jul 2023

    Received by City of Edinburgh

  2. 13 Jul 2023

    Validated

    Checked as complete and ready for consideration.

  3. 15 Aug 2023

    Decision issued: Granted

  4. 28 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 1 Buckstone Gardens Buckstone Edinburgh EH10 6QD

    25/06680/FUL Submitted 23 Dec 2025 72m away

    Replace two existing conservatories with single-storey extensions.

    Granted Full applications Extension 17 docs
    Small domestic
  • 13 Buckstone Dell Edinburgh EH10 6PG

    26/01997/CLP Submitted 8 May 2026 99m away

    77% historically approved · decision due ~3 Jul

    Proposed single storey rear extension to house.

    Awaiting decision Lawful development Extension 6 docs
    Small domestic
  • 16 Buckstone Terrace Edinburgh EH10 6PZ

    20/04929/FUL Submitted 11 Nov 2020 114m away

    Change of use from Class three (Food and Drink) to Mixed use Class three/hot food take away (sui generis).

    Granted Full applications 33 docs
  • 14 Buckstone Drive Edinburgh EH10 6PQ

    19/05188/FUL Submitted 30 Oct 2019 134m away

    Proposed single storey side extension with pitched roof to match existing house. (Resubmission relating to 19/02574/FUL).

    Granted Full applications Extension 6 docs
    Small domestic
  • 2 Buckstone Drive Edinburgh EH10 6PD

    26/0461/TPO Submitted 16 Jun 2026 186m away

    94% historically approved · decision due ~12 Aug

    3 x trees as per report - As per report

    Awaiting decision Trees 11 docs
  • 34 Buckstone Grove Edinburgh EH10 6PF

    13/02394/VARY Submitted 3 Nov 2014 225m away

    Non-material variation to 13/02394/FUL for a minor variation to the stair.

    Decided Conditions 6 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications