Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Comely Bank Edinburgh EH4 1AN

Granted City of Edinburgh 23/02717/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed internal works include relocating the existing LDU (Local Decontamination Unit) and staff room and creating a new 4th dental surgery and staff WC.

As published by the council, reference 23/02717/LBC

Application record

Reference
23/02717/LBC
Type
Listed Building Consent
Status
Application Granted
Decision
Granted
Received
23 Jun 2023
Validated
23 Jun 2023
Decided
25 Aug 2023
Ward
Inverleith
Parish
Stockbridge/Inverleith (pre 28 March 2025)
Decision by
Delegated Decision
Postcode
EH4 1AN

Timeline

Dates from the published record

  1. 23 Jun 2023

    Received by City of Edinburgh

  2. 25 Aug 2023

    Decision issued: Granted

  3. 4 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

  • Flat 1 1 Comely Bank Edinburgh EH4 1AN

    26/00006/LBC Submitted 5 Jan 2026 6m away

    89% historically approved · decision due ~2 Mar

    Replacement of 13 dilapidated sash and case (1 fixed) windows with timber, double glazed sash and case windows on a like-for-like basis.

    Awaiting decision Heritage and listed buildings Windows or glazing 8 docs
  • 5 East Fettes Avenue Edinburgh EH4 1DN

    25/06424/FUL Submitted 8 Dec 2025 76m away

    Provision of stairlift to front garden.

    Decided Full applications 9 docs
  • 17 Comely Bank Edinburgh EH4 1AL

    21/05144/FUL Submitted 30 Sep 2021 98m away

    Proposed rear extension to form family room.

    Granted Full applications Extension 8 docs
  • 17 Comely Bank Edinburgh EH4 1AL

    21/05148/LBC Submitted 30 Sep 2021 98m away

    Proposed rear extension to existing ground floor main door flat.

    Granted Heritage and listed buildings Extension 11 docs
  • 2F1 21 Comely Bank Street Stockbridge Edinburgh EH4 1AP

    25/05497/FULSTL Submitted 16 Oct 2025 101m away

    83% historically approved · decision due ~11 Dec

    Retrospective change of use of premises to short term let accommodation.

    Awaiting decision Full applications 6 docs
  • 2F1 21 Comely Bank Street Edinburgh EH4 1AP

    25/04453/FULSTL Submitted 28 Aug 2025 101m away

    Retrospective change of use of premises to short-term let accommodation.

    Withdrawn Full applications 8 docs

In City of Edinburgh

  • 26/03530/LBC Awaiting decision

    3F 87 Constitution Street Edinburgh EH6 7AE

    Replace the existing single glazed sash and case windows with double glazed upgrades. Full restoration of the original case, manufacture and install like-for-like sashes with Heritage 'Slimlite' double glazing. Careful attention will be given when manufacturing new like for like sashes. All window moulds, dimensions and features of the original sashes will be retained and replicated on the new sashes.

    1 Sep 2026 Heritage and listed buildings
  • 26/03514/LBC Awaiting decision

    8A Warrender Park Crescent Edinburgh EH9 1DX

    Formation of one new window opening in the rear elevation of the kitchen, comprising a white-painted double-glazed timber sash-and-case window with natural sandstone lintel, rybats and cill to match the existing stonework.

    31 Aug 2026 Heritage and listed buildings
  • 26/03529/LBC Awaiting decision

    1 Eyre Crescent Edinburgh EH3 5ET

    Existing timber sash and case windows to be removed and replaced with new timber double glazed sash and case windows, all proportions to remain the same to match the existing.

    31 Aug 2026 Heritage and listed buildings
  • 26/03508/LBC Awaiting decision

    2F 45 Bread Street Edinburgh EH3 9AH

    Strip wallpaper; replaster and repaint internal walls and ceilings; repaint/replace internal doors and door handles; replace carpet with new carpet/laminate; install ceiling rose in living room; replace flat front door lock; replace wall sockets, light switches, and light fixtures; strip and repaint the existing internal window shutters.

    31 Aug 2026 Heritage and listed buildings
  • 26/03500/LBC Awaiting decision

    6 St Margaret's Road Edinburgh EH9 1AZ

    Formation of en-suite shower room and fitted wardrobe within bedroom of ground floor flat. En-suite and wardrobe taken part height only, allowing cornice to remain unaltered. Fit black cast iron extract termination grille at low level on external wall.

    28 Aug 2026 Heritage and listed buildings