Planning application
1F1 7 Academy Street Edinburgh EH6 7EE
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Form new open plan kitchen living space with new bedroom to previous kitchen.
As published by the council, reference 23/02595/LBC
Application record
- Reference
- 23/02595/LBC
- Type
- Listed Building Consent
- Status
- Application Granted
- Decision
- Granted
- Received
- 14 Jun 2023
- Validated
- 14 Jun 2023
- Decided
- 15 Aug 2023
- Ward
- Leith
- Parish
- Leith Links
- Decision by
- Delegated Decision
- Postcode
- EH6 7EE
Timeline
Dates from the published record
-
14 Jun 2023
Received by City of Edinburgh
-
15 Aug 2023
Decision issued: Granted
-
28 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About heritage and listed buildings applications
How this application type works
Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.
More on heritage and listed buildings applications in our guide
Nearby applications
Within 500 metres
-
Edinburgh Hindu Mandir And Cultural Centre 2 St Andrew Place Edinburgh EH6 7EG
Fascia sign, flag.
Withdrawn Advertising 6 docs -
2 St Andrew Place Edinburgh EH6 7EG
83% historically approved · decision due ~29 Oct
Installation of flagpole, solar PV panels and air to air heat pumps.
Awaiting decision Full applications 6 docs -
1A Wellington Place South Leith Edinburgh EH6 7EQ
Replace existing window sashes with new double glazed units; form new extract terminals
Decided Heritage and listed buildings Windows or glazing 6 docs -
5A Duke Street South Leith Edinburgh EH6 6AE
Existing modern carpet tiles are lifted and a latex levelling screed is installed to provide them with a new level finish ahead of them installing their new carpet tile finish.
Decided Heritage and listed buildings 6 docs -
1F2 1 Newkirkgate Edinburgh EH6 6AA
89% historically approved · decision due ~18 Dec
Installation of double glazing by replacement of existing sashes with new custom fitted Vacuum-Sealed IGUS. All historic detail to be matched like-for-like. The original existing cases are to be retained and refurbished in situ.
Awaiting decision Heritage and listed buildings Windows or glazing 7 docs -
5 Wellington Place Edinburgh EH6 7EQ
77% historically approved · decision due ~6 May
Application for the issue of a Certificate of Lawfulness confirming its existing use as short-term let accommodation is lawful.
Awaiting decision Lawful development 6 docs
Other heritage and listed buildings applications
In City of Edinburgh
-
26/03530/LBC Awaiting decision
3F 87 Constitution Street Edinburgh EH6 7AE
Replace the existing single glazed sash and case windows with double glazed upgrades. Full restoration of the original case, manufacture and install like-for-like sashes with Heritage 'Slimlite' double glazing. Careful attention will be given when manufacturing new like for like sashes. All window moulds, dimensions and features of the original sashes will be retained and replicated on the new sashes.
-
26/03514/LBC Awaiting decision
8A Warrender Park Crescent Edinburgh EH9 1DX
Formation of one new window opening in the rear elevation of the kitchen, comprising a white-painted double-glazed timber sash-and-case window with natural sandstone lintel, rybats and cill to match the existing stonework.
-
26/03529/LBC Awaiting decision
1 Eyre Crescent Edinburgh EH3 5ET
Existing timber sash and case windows to be removed and replaced with new timber double glazed sash and case windows, all proportions to remain the same to match the existing.
-
26/03508/LBC Awaiting decision
2F 45 Bread Street Edinburgh EH3 9AH
Strip wallpaper; replaster and repaint internal walls and ceilings; repaint/replace internal doors and door handles; replace carpet with new carpet/laminate; install ceiling rose in living room; replace flat front door lock; replace wall sockets, light switches, and light fixtures; strip and repaint the existing internal window shutters.
-
26/03500/LBC Awaiting decision
6 St Margaret's Road Edinburgh EH9 1AZ
Formation of en-suite shower room and fitted wardrobe within bedroom of ground floor flat. En-suite and wardrobe taken part height only, allowing cornice to remain unaltered. Fit black cast iron extract termination grille at low level on external wall.