Planning application

44 Warriston Avenue Edinburgh EH3 5NB

Granted City of Edinburgh 21/05927/FUL Planning Permission

Works: Extension Loft or dormer Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Rear dormer window, velux windows and front porch.

As published by the council, reference 21/05927/FUL

Application record

Reference
21/05927/FUL
Type
Planning Permission
Status
Application Granted
Decision
Granted
Received
8 Nov 2021
Validated
8 Nov 2021
Decided
16 Dec 2021
Ward
Inverleith
Parish
Stockbridge/Inverleith (pre 28 March 2025)
Decision by
Local Fast Track Decision historic 12/06
Postcode
EH3 5NB

Timeline

Dates from the published record

  1. 8 Nov 2021

    Received by City of Edinburgh

  2. 16 Dec 2021

    Decision issued: Granted

  3. 28 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 42 Warriston Avenue Edinburgh EH3 5NB

    26/00990/FUL Submitted 12 Mar 2026 11m away

    Alterations to existing ground floor rear extension, extend house to side elevation, and additional window to first floor South elevation.

    Granted Full applications Extension Windows or glazing 14 docs
  • 32 Eildon Street Warriston Edinburgh EH3 5JX

    26/01126/FUL Submitted 19 Mar 2026 89m away

    83% historically approved · decision due ~14 May

    Attic conversion including rooflights and rear dormer along with alterations to form access staircase.

    Awaiting decision Full applications Loft or dormer 7 docs
  • 18 Warriston Drive Edinburgh EH3 5LY

    06/03817/FUL Submitted 15 Sep 2006 148m away

    Create a driveway forming vehicular access and off street parking

    Granted Full applications 3 docs
  • 30 Warriston Drive Edinburgh EH3 5LY

    04/01152/FUL Submitted 31 Mar 2004 148m away

    Replacement of exterior white timber windows with white UPVC windows

    Granted Full applications Windows or glazing 2 docs
  • 28 Warriston Drive Edinburgh EH3 5LY

    04/01151/FUL Submitted 30 Mar 2004 148m away

    Replacement of exterior white timber windows with white UPVC windows

    Granted Full applications Windows or glazing 2 docs
  • Treeworks Eildon Street Edinburgh

    26/0348/TPO Submitted 12 May 2026 156m away

    94% historically approved · decision due ~13 Jul

    Sycamore tree prunning about 10 branches back to boundary line. Ash tree prunning about 8 branches back to boundary line.

    Awaiting decision Trees 6 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications