Skip to content
PlanIndex Get alerts
Menu

Planning application

2F1 29 Comiston Road Edinburgh EH10 6AB

Refused City of Edinburgh 21/05403/FUL Planning Permission

Works: Loft or dormer

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Alteration and conversion of attic to form 2 No. bedrooms and bathroom, alterations to rear roof to existing ridge level, installation of conservation velux and all associated works.

As published by the council, reference 21/05403/FUL

Application record

Reference
21/05403/FUL
Type
Planning Permission
Status
Application Refused
Decision
Refused
Received
15 Oct 2021
Validated
15 Oct 2021
Decided
13 Dec 2021
Ward
Morningside
Parish
Morningside (pre 28 March 2025)
Decision by
Local Delegated Decision
Postcode
EH10 6AB

Timeline

Dates from the published record

  1. 15 Oct 2021

    Received by City of Edinburgh

  2. 13 Dec 2021

    Decision issued: Refused

  3. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21 Comiston Road Morningside Edinburgh EH10 6AA

    26/0256/TCO Submitted 9 Apr 2026 17m away

    1 cherry tree 1 conifer tree removal.

    Decided Trees 9 docs
  • 11 Comiston Road Morningside Edinburgh EH10 6AA

    26/00086/ADV Submitted 9 Jan 2026 46m away

    Advertisement of the following types: Fascia sign, box sign.

    Granted Advertising 10 docs
  • 11 Comiston Road Edinburgh EH10 6AA

    26/00115/FUL Submitted 12 Jan 2026 47m away

    New shop screens to elevations to include relocation of entrance door.

    Granted Full applications 11 docs
  • 2F1 39 Comiston Road Edinburgh EH10 6AB

    26/03355/WINPA Submitted 13 Aug 2026 54m away

    97% historically approved · decision due ~14 Oct

    Removal of existing timer sash and case windows and replacing with uPVC vertical sliding sash windows. The proposed windows will retain the existing window openings and replicate the existing configuration and proportions as closely as practicable. Including the vertical sliding opening arrangement and glazing pattern.

    Awaiting decision Prior approval Windows or glazing 6 docs
  • 9 Braid Road Braid Hills Edinburgh EH10 6AE

    26/0514/TCO Submitted 6 Jul 2026 61m away

    94% historically approved · decision due ~31 Aug

    Rowan tree removal of tree in conservation area, to be replaced by other trees.

    Awaiting decision Trees 4 docs
  • Morningside Parish Church 5 Braid Road Edinburgh EH10 6AE

    17/00100/TCO Submitted 11 Jan 2017 67m away

    Silver Birchat NE corner of church building - to be felled.

    Granted Trees 3 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications