Skip to content
PlanIndex Get alerts
Menu

Planning application

10 Drumsheugh Place Edinburgh EH3 7PT

Granted City of Edinburgh 21/04771/FUL Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed to install bike stores within the existing car park.

As published by the council, reference 21/04771/FUL

Application record

Reference
21/04771/FUL
Type
Planning Permission
Status
Application Granted
Decision
Granted
Received
13 Sep 2021
Validated
23 Sep 2021
Decided
2 Dec 2021
Ward
City Centre
Parish
West End (pre 28 March 2025)
Decision by
Local Fast Track Decision historic 12/06
Postcode
EH3 7PT

Timeline

Dates from the published record

  1. 13 Sep 2021

    Received by City of Edinburgh

  2. 23 Sep 2021

    Validated

    Checked as complete and ready for consideration.

  3. 2 Dec 2021

    Decision issued: Granted

  4. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 15 Melville Street Edinburgh EH3 7PE

    26/00181/LBC Submitted 16 Jan 2026 45m away

    Alter shower room to form access stair to roof. Fit top hinged conservation rooflight.

    Granted Heritage and listed buildings Loft or dormer 18 docs
  • 15 Melville Street New Town Edinburgh EH3 7PE

    25/05423/LBC Submitted 13 Oct 2025 45m away

    89% historically approved · decision due ~8 Dec

    Alter shower room to form access stair to roof. Fit top hinged conservation roof lights and duck boards across valley gutter to facilitate roof access for maintenance purposes.

    Awaiting decision Heritage and listed buildings Loft or dormer 14 docs
  • 19 Melville Street Edinburgh EH3 7PE

    26/03223/FUL Submitted 5 Aug 2026 61m away

    83% historically approved · decision due ~6 Oct

    Re-clad and new windows to lower ground extension. reinstatement of dummy window.

    Awaiting decision Full applications Extension Windows or glazing 24 docs
  • 19 Melville Street Edinburgh EH3 7PE

    26/03280/LBC Submitted 10 Aug 2026 61m away

    89% historically approved · decision due ~5 Oct

    Minor internal alterations including relocation of internal partition, reinstatement of dummy window and internal reconfiguration of lower ground floor. Re-clad and new windows to lower ground floor.

    Awaiting decision Heritage and listed buildings Windows or glazing 21 docs
  • 17 Melville Street Lane Edinburgh EH3 7QB

    23/02806/FUL Submitted 29 Jun 2023 66m away

    Proposed erection of a mews structure for two dwellings and a garage. (as amended)

    Granted Full applications 15 docs
    Several homes
  • 18 Randolph Crescent Edinburgh

    21/06044/TCO Submitted 15 Nov 2021 76m away

    Elm - remove low hanging branch. Elm (417) - remove low hanging branch. Wheatley Elm (415) - remove low hanging branch. Ash (405) - fell and remove poor quality overcrowded tree.

    Decided Trees 6 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications