Planning application
Land Adjacent To 82 Dalkeith Road Edinburgh
Works: New dwelling Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Development of 2 x three storey semi-detached dwelling houses with associated landscaping works; formation of enlarged opening through stone boundary wall to front of site and alter existing pedestrian access opening to form a vehicular access (as amended).
As published by the council, reference 21/04702/FUL
Application record
- Reference
- 21/04702/FUL
- Type
- Planning Permission
- Status
- Application Granted
- Decision
- Granted
- Received
- 7 Sep 2021
- Validated
- 8 Sep 2021
- Decided
- 6 Dec 2021
- Ward
- Southside/Newington
- Parish
- Grange/Prestonfield
- Decision by
- Local Delegated Decision
Timeline
Dates from the published record
-
7 Sep 2021
Received by City of Edinburgh
-
8 Sep 2021
Validated
Checked as complete and ready for consideration.
-
6 Dec 2021
Decision issued: Granted
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
35 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
74 Dalkeith Road Edinburgh EH16 5AE
To replace the Scotch roof slate with Spanish Cupa H3 slates.
Decided Heritage and listed buildings 8 docs -
1 Blacket Place Edinburgh EH9 1RW
89% historically approved · decision due ~13 Oct
Replacement windows (double glazing upgrade).
Awaiting decision Heritage and listed buildings Windows or glazing 10 docs -
4 Dryden Place Edinburgh EH9 1RP
proposed roof light
Granted Lawful development Loft or dormer 7 docs -
8 Alfred Place Newington Edinburgh EH9 1RX
T1 Oak reduce the height from 12m to 10m spread from 14m to 11m.
Decided Trees 4 docs -
9 Alfred Place Newington Edinburgh EH9 1RX
94% historically approved · decision due ~5 Aug
T! Beech - Reduce overhang.
Awaiting decision Trees 1 doc -
7 Alfred Place Edinburgh EH9 1RX
83% historically approved · decision due ~30 Jun
Remove and replace the existing timber garden shed with new timber garden shed and timber bike shed.
Awaiting decision Full applications 9 docsSmall domestic
Other full applications applications
In City of Edinburgh
-
26/03535/FUL Awaiting decision
33 Briggers Wynd South Queensferry EH30 9DS
Erect garden room ancillary to main dwelling.
-
26/03515/FULSTL Awaiting decision
Flat 1 2 King's Stables Road Edinburgh EH1 2JY
Change of use of residential dwelling to a short-term let (in retrospect).
-
26/03522/FUL Awaiting decision
10 Esplanade Terrace Edinburgh EH15 2ES
Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.
-
26/03516/FUL Awaiting decision
Flat 1 67 Lochend Drive Edinburgh EH7 6DH
Cut-down existing window to form new door opening and step construction.
-
26/03510/FULSTL Awaiting decision
3F5 168 Albert Street Edinburgh EH7 5NA
Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.