Planning application
20/03099/VARY
3 Redhall View Hailes Edinburgh EH14 2NA
Proposal
In existing building. Omit first floor bathroom window removal and new window opening from proposals and retain existing window. In new extension. Omit new first floor bathroom window and relocate to rear elevation. Provide a second rooflight to same specification as per the approved.
As published by the council, reference 20/03099/VARY
Timeline
Dates from the published record
-
29 Dec 2025
Received by City of Edinburgh
-
7 Jan 2026
Validated
Checked as complete and ready for consideration.
-
28 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with City of Edinburgh for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
25/06170/TPO Awaiting decision
Flat 1 2 Inglis Green Rigg Kingsknowe Edinburgh EH14 2LF
Ash tree to rear of block 2 by rear boundary wall. Suffering from ash dieback, mainly on rear stem remove large diameter deadwood on rear stem, crown lift to 3m over grass & remove basal Ivy.
-
19/03380/VARY Awaiting decision
35 Lanark Road Edinburgh EH14 1TL
Non-material variation to 19/03380/FUL - Dimensional Adjustments. External Elevation Adjustments. Internal Layout Changes. Accommodation Schedule. Additional Lower Ground Floor.
-
26/00076/FUL Awaiting decision
Proposed Substation 10 Metres East Of 35 Lanark Road Kingsknowe Edinburgh
The installation of a new substation and generator as essential infrastructure for the adjacent student accommodation. The substation and generator are necessary to meet fire safety legislation and Scottish Power Energy Network's (SPEN) capacity requirements.
-
25/05851/TPO Awaiting decision
48 Craiglockhart Dell Road Edinburgh EH14 1JP
T1 Chestnut reduction. T2 - G1 group of 3 cedar reduction.
-
25/05921/FUL Awaiting decision
94 Redhall Drive Edinburgh EH14 2DS
Single storey mono-pitch extension to side of property.
Other conditions applications
In City of Edinburgh
-
25/00712/VARY Decided
29 Joppa Road Edinburgh EH15 2HA
Non Material Variation.
-
24/04239/VARY Decided
4 Muir Wood Grove Currie Edinburgh EH14 5HA
Non Material Variation - Change the finish of the extension walls from the approved beige silicone render finish on cement board to an anthracite grey fibre-cement horizontal cladding board.
-
22/00030/VAR2 Decided
11 - 13 York Lane Broughton Edinburgh EH1 3HY
Non-Material Variation - changes to external materials.
-
24/04802/VARY Decided
265 Morningside Road Edinburgh EH10 4RD
Non-material variation application for 24/04802/FUL. We propose a number of variations to the consented drawings for the reasons explained below and within the appended architectural package. The changes have been illustrated on the elevation drawings, ground floor plan and level 03 plan.
-
23/03109/VARY Decided
73 - 75 George Street New Town Edinburgh EH2 3EE
Non Material Variation - Change of cladding finish to the rear elevation. refer to drawing pl42 and pl43.