Skip to content
PlanIndex Get alerts
Menu

Planning application

32 Almondbank Terrace Edinburgh EH11 1SS

Granted City of Edinburgh 20/00399/FUL Planning Permission

Works: Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed front dormer forming shower room.

As published by the council, reference 20/00399/FUL

Application record

Reference
20/00399/FUL
Type
Planning Permission
Status
Application Granted
Decision
Granted
Received
28 Jan 2020
Validated
28 Jan 2020
Decided
6 May 2020
Ward
Fountainbridge/Craiglockhart
Parish
Merchiston (pre 28 March 2025)
Decision by
Local Fast Track Decision historic 12/06
Postcode
EH11 1SS

Timeline

Dates from the published record

  1. 28 Jan 2020

    Received by City of Edinburgh

  2. 6 May 2020

    Decision issued: Granted

  3. 4 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26 Almondbank Terrace Edinburgh EH11 1SS

    26/03369/FUL Submitted 18 Aug 2026 24m away

    83% historically approved · decision due ~15 Oct

    Alterations to existing window and doorway. Alter existing window to form a double door and remove existing door to create window.

    Awaiting decision Full applications Windows or glazing 5 docs
  • 52 Hollybank Terrace Edinburgh EH11 1SW

    26/02576/FUL Submitted 17 Jun 2026 81m away

    83% historically approved · decision due ~12 Aug

    Knock down of cill below window to form a new rear door with top hopper above. Removal of existing rear door and installation of a fixed light window.

    Awaiting decision Full applications Windows or glazing 7 docs
  • 30 Alderbank Terrace Edinburgh EH11 1TA

    25/06525/TCO Submitted 15 Dec 2025 87m away

    Sycamore, remove sycamore, cut to low stump. Holly, remove holly, cut to low stump.

    Decided Trees 3 docs
  • 11 Alderbank Terrace Polwarth Edinburgh EH11 1SX

    26/01299/WINPA Submitted 27 Mar 2026 95m away

    97% historically approved · decision due ~24 May

    Existing white softwood single glazed sash and case windows are to be replaced with white uPvc double glazed sash and case windows.

    Awaiting decision Prior approval Windows or glazing 6 docs
  • 11 Alderbank Terrace Polwarth Edinburgh EH11 1SX

    26/00592/WINPA Submitted 16 Feb 2026 95m away

    97% historically approved · decision due ~13 Apr

    Existing white softwood single glazed sash and case windows are to be replaced with white uPvc double glazed casement windows.

    Awaiting decision Prior approval Windows or glazing 6 docs
  • 27 Shandon Crescent Polwarth Edinburgh EH11 1QF

    26/00652/FUL Submitted 20 Feb 2026 107m away

    Formation of new doorway at window to rear and infilling of existing door.

    Granted Full applications Windows or glazing 6 docs

In City of Edinburgh

  • 26/03535/FUL Awaiting decision

    33 Briggers Wynd South Queensferry EH30 9DS

    Erect garden room ancillary to main dwelling.

    1 Sep 2026 Full applications
  • 26/03515/FULSTL Awaiting decision

    Flat 1 2 King's Stables Road Edinburgh EH1 2JY

    Change of use of residential dwelling to a short-term let (in retrospect).

    31 Aug 2026 Full applications
  • 26/03522/FUL Awaiting decision

    10 Esplanade Terrace Edinburgh EH15 2ES

    Proposed alterations to an existing dwelling including; removal of existing conservatory. proposed singles to the extension to rear of building. replacement of existing garage door and access to from access road.

    31 Aug 2026 Full applications
  • 26/03516/FUL Awaiting decision

    Flat 1 67 Lochend Drive Edinburgh EH7 6DH

    Cut-down existing window to form new door opening and step construction.

    31 Aug 2026 Full applications
  • 26/03510/FULSTL Awaiting decision

    3F5 168 Albert Street Edinburgh EH7 5NA

    Retrospective change of use from residential dwelling to short-term let accommodation for up to 3 guests, with no structural alterations to the property.

    31 Aug 2026 Full applications