Skip to content
PlanIndex Get alerts
Menu

Planning application

Main Building Waverley Station 4 Waverley Bridge Edinburgh EH1 1BB

Granted City of Edinburgh 16/02257/LBC Listed Building Consent

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Internal alterations to project rooms 60, 61 and the Union Room on the first floor of the southern side of the Station buildings.

As published by the council, reference 16/02257/LBC

Application record

Reference
16/02257/LBC
Type
Listed Building Consent
Status
Permission Is Not Required
Decision
Granted As published: Permission is not required
Received
4 May 2016
Validated
4 May 2016
Decided
24 May 2016
Ward
City Centre (Pre May 2017)
Parish
Old Town
Decision by
Fast Track Decision
Postcode
EH1 1BB

Site history

Applications at this address on the City of Edinburgh register

This site has had 4 applications since 2016: 2 approved, 1 refused.

  • 26/03805/LBC Awaiting decision

    Main Building Waverley Station 4 Waverley Bridge Edinburgh EH1 1BB

    installation of replacement digital advertisement display screen (Transvision screen)

    Submitted 21 Sep 2026 Heritage and listed buildings
  • 16/05177/LBC Granted

    Main Building Waverley Station 4 Waverley Bridge Edinburgh EH1 1BB

    Install new ticket gate and barriers.

    Decided 12 Dec 2016 Heritage and listed buildings
  • 16/03621/LBC Refused

    Main Building Waverley Station 4 Waverley Bridge Edinburgh EH1 1BB

    Installation of replacement gates at north and south ramps.

    Decided 29 Nov 2016 Heritage and listed buildings

Timeline

Dates from the published record

  1. 4 May 2016

    Received by City of Edinburgh

  2. 24 May 2016

    Decision issued: Permission is not required

  3. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

City of Edinburgh granted permission on 24 May 2016, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In City of Edinburgh

  • 26/04014/LBC Awaiting decision

    3F1 320 Leith Walk Edinburgh EH6 5BU

    Increase opening between kitchen and cupboard, and to create opening between cupboard and living room.

    Received 6 Oct, published by the council 9 Oct 2026 Heritage and listed buildings
  • 26/03855/LBC Granted

    21 Ravelston Garden Ravelston Edinburgh EH4 3LE

    Internal alterations to property, including formation of shower room, removal of masonry store in Kitchen, installation of w.c with toilet and all associated works.

    Received 24 Sep, published by the council 9 Oct 2026 Heritage and listed buildings
  • 26/03988/LBC Awaiting decision

    BF, GF1, GF2, GF3 13 Great King Street New Town Edinburgh EH3 6QW

    Internal reconfiguration, extension to rear and removal of a small section of boundary wall.

    Received 5 Oct, published by the council 9 Oct 2026 Heritage and listed buildings
  • 26/03989/LBC Awaiting decision

    BF 18 Coates Crescent New Town Edinburgh EH3 7AF

    Proposed alteration of existing window to create new doorway.

    Received 5 Oct, published by the council 9 Oct 2026 Heritage and listed buildings
  • 26/03967/LBC Awaiting decision

    Camilla House 19 Grange Terrace Grange Edinburgh EH9 2LF

    Erect a partition between the opening between lounge and dining room and erect a privacy partiton.

    Received 2 Oct, published by the council 9 Oct 2026 Heritage and listed buildings