Planning application
22 + 22B Royal Crescent Edinburgh EH3 6QA
Works: New dwelling
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Sub-division to form studio flats at 22B and reinstate remainder of flat into house above (22), internal alterations
As published by the council, reference 04/01357/LBC
Application record
- Reference
- 04/01357/LBC
- Type
- Listed Building Consent
- Status
- Application Granted
- Decision
- Granted
- Received
- 14 Apr 2004
- Validated
- 14 Apr 2004
- Decided
- 28 Jul 2004
- Ward
- New Town (Pre 17 Nov 06)
- Decision by
- Delegated Decision
- Postcode
- EH3 6QA
Timeline
Dates from the published record
-
14 Apr 2004
Received by City of Edinburgh
-
28 Jul 2004
Decision issued: Granted
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About heritage and listed buildings applications
How this application type works
Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.
More on heritage and listed buildings applications in our guide
Nearby applications
Within 500 metres
-
18 Royal Crescent Broughton Edinburgh EH3 6QA
83% historically approved · decision due ~12 Jan
New rear French doors being proposed with new Juliette balconies to match the rear of 16 royal crescent.
Awaiting decision Full applications Windows or glazing 5 docs -
18 Royal Crescent Broughton Edinburgh EH3 6QA
89% historically approved · decision due ~12 Jan
New French doors and Juliette balcony is being proposed to be added to the rear of the property in replacement of the existing windows. proposed balcony to match existing balcony of 16 royal crescent.
Awaiting decision Heritage and listed buildings Windows or glazing 4 docs -
18 Royal Crescent Edinburgh EH3 6QA
Change of use from HMO to dwellinghouse.
Decided Full applications 8 docsDomestic -
18 Royal Crescent Edinburgh EH3 6QA
89% historically approved · decision due ~14 Oct
Alterations to upgrade the existing front and rear windows using new slimline double glazing.
Awaiting decision Heritage and listed buildings Windows or glazing 4 docs -
1F3 15 Royal Crescent Broughton Edinburgh EH3 6QA
94% historically approved · decision due ~14 Nov
One Elm - Removal of the elm tree located in the communal garden at 15 Royal Crescent.
Awaiting decision Trees 3 docs -
1F2 11 Dundonald Street Edinburgh EH3 6RZ
Remove two existing , single-glazed, timber, sash and case windows, one to the front and one to the rear, and replace with double-glazed, timber, sash and case windows to match the existing in both design and appearance. Windows to have white painted finish and sand mastic pointing.
Granted Heritage and listed buildings Windows or glazing 12 docs
Other heritage and listed buildings applications
In City of Edinburgh
-
26/03530/LBC Awaiting decision
3F 87 Constitution Street Edinburgh EH6 7AE
Replace the existing single glazed sash and case windows with double glazed upgrades. Full restoration of the original case, manufacture and install like-for-like sashes with Heritage 'Slimlite' double glazing. Careful attention will be given when manufacturing new like for like sashes. All window moulds, dimensions and features of the original sashes will be retained and replicated on the new sashes.
-
26/03514/LBC Awaiting decision
8A Warrender Park Crescent Edinburgh EH9 1DX
Formation of one new window opening in the rear elevation of the kitchen, comprising a white-painted double-glazed timber sash-and-case window with natural sandstone lintel, rybats and cill to match the existing stonework.
-
26/03529/LBC Awaiting decision
1 Eyre Crescent Edinburgh EH3 5ET
Existing timber sash and case windows to be removed and replaced with new timber double glazed sash and case windows, all proportions to remain the same to match the existing.
-
26/03508/LBC Awaiting decision
2F 45 Bread Street Edinburgh EH3 9AH
Strip wallpaper; replaster and repaint internal walls and ceilings; repaint/replace internal doors and door handles; replace carpet with new carpet/laminate; install ceiling rose in living room; replace flat front door lock; replace wall sockets, light switches, and light fixtures; strip and repaint the existing internal window shutters.
-
26/03500/LBC Awaiting decision
6 St Margaret's Road Edinburgh EH9 1AZ
Formation of en-suite shower room and fitted wardrobe within bedroom of ground floor flat. En-suite and wardrobe taken part height only, allowing cornice to remain unaltered. Fit black cast iron extract termination grille at low level on external wall.