Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00310/FUL

Waggon Farm Wigan Lane Heath Charnock Chorley PR7 4DA

Granted Chorley Full Planning

Proposal

Erection of 1no. detached dwelling (following demolition of existing stables)

As published by the council, reference 26/00310/FUL

Timeline

Dates from the published record

  1. 6 Apr 2026

    Received by Chorley

  2. 16 Jul 2026

    Decision issued: Permit Full Planning Permission

  3. 21 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 23/00156/MNMA Decided

    Glyndale Wigan Lane Heath Charnock Chorley PR7 4DA

    Minor non-material amendment to planning permission ref: 22/00206/FULHH (Two storey side extension, single storey front extension and single storey rear extension) to amend the positions of windows and doors in the side elevation

    21 Feb 2023 77m away Amendments
  • 24/00799/DIS Decided

    Farnworth House Farm Grundys Lane Chorley PR7 4BZ

    Application to discharge conditions 5 (lighting design strategy), 8 (biodiversity enhancement), 11 (tree protection plan & arboricultural method statement), 14 (coal mining risk assessment) and 15 (landscaping scheme) of planning permission ref: 23/00759/FUL (Erection of 1no. single storey dwelling and detached car port)

    21 Sep 2024 415m away Conditions
  • 22/01152/FUL Refused

    Land Adjacent To 123 Rawlinson Lane Heath Charnock

    Erection of stable block (following demolition of existing stable block)

    2 Nov 2022 483m away Full applications

In Chorley

  • 25/00670/FUL Refused

    Land Off Higher House Lane Heapey

    Erection of tourism glamping pods and associated works

    18 Jul 2025 Full applications
  • 25/01055/FUL Granted

    Th'owd Barn Hall Lane Mawdesley Ormskirk L40 2QY

    Construction of a new dwelling and detached single garage within the domestic curtilage of the existing dwelling, together with associated external works.

    3 Nov 2025 Full applications
  • 26/00480/FUL Granted

    NatWest 46 - 48 Market Street Chorley PR7 2SE

    Relocation and replacement of ATM, relocation of letterbox and new ramp, steps, upstand wall, landing and handrail (following removal of existing ramp, steps, upstand wall and handrail)

    2 Jun 2026 Full applications
  • 26/00462/FUL Granted

    59 Gorsey Lane Mawdesley Ormskirk L40 3TE

    Section 73 application to vary condition 4 (approved plans) of planning permission ref: 25/00789/FUL (Erection of 1no. self-build dwelling along with driveway and parking alterations and associated landscaping (following demolition of existing buildings) in order to alter the design of the dwelling including changes to windows, doors and rooflights and an increase to the depth of the rear elevation

    27 May 2026 Full applications
  • 26/00642/FUL Awaiting decision

    6 The Beeches Clayton-le-woods Chorley PR6 8RA

    Application for technical details consent for the erection of one detached dwelling pursuant to permission in principle 25/01175/PIP

    21 Jul 2026 Full applications