Land To East Of Finnington Lane Feniscowles Withnell

Refused Chorley 24/00847/OUTMAJ Major Outline Planning

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Hybrid Planning Application seeking: Part A Detailed planning permission for ground remodelling and associated earthworks to form a development platform, site drainage including diversion of watercourses, ecological mitigation, new means of access to A674 via a 3-arm traffic controlled junction (including widening and realignment of the main carriageway), internal access road and related structures, utilities diversion, landscaping and associated works; and Part B Outline planning permission (with all matters reserved except for means of access and layout) to erect two warehouse and distribution units (Use Class B8) including ancillary offices and staff welfare facilities, with a combined floorspace of up to 120,780 sqm (GEA), service yards and associated infrastructure, car and cycle parking, internal circulation roads, footpaths and cycle routes, internal landscaping and associated ancillary works.

As published by the council, reference 24/00847/OUTMAJ

Application record

Reference
24/00847/OUTMAJ
Type
Major Outline Planning
Status
Refused
Decision
Refused
Received
9 Oct 2024
Validated
7 Nov 2024
Ward
Chorley North East
Parish
Withnell

Timeline

Dates from the published record

  1. 9 Oct 2024

    Received by Chorley

  2. 7 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 24 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 22/00948/SCOPE (Granted)

Who's behind it

Company information only, from the register and Companies House

Plan Red Ltd Agent, registered in Manchester

Active · incorporated 2021 · Manchester

34 applications on PlanIndex · across 8 councils · 80% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

FI Real Estate Management Ltd Applicant, registered in Chorley

Active · incorporated 2011 · Chorley

4 applications on PlanIndex · across 4 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

484 documents on file for this application

  • DECISION - REFUSAL OF OUTLINE PP Decision · 17 Jun 2026
  • SIR LINDSAY HOYLE MP Objection Comment · 15 Jun 2026
  • ONLINE COMMENT Public Comment · 13 Jun 2026
  • FINNINGTON ARGUMENTS AGAINST CHORLEY PLANNING Objection Comment · 12 Jun 2026
  • FINNINGTON ARGUMENTS AGAINST CHORLEY PLANNING. Objection Comment · 12 Jun 2026
  • THE COUNTRYSIDE CHARITY CPRE. Objection Comment · 11 Jun 2026
  • PART 1 11060 LAND EAST OF FINNINGTON LANDSCAPE STATEMENT V3 Objection Comment · 02 Mar 2026
  • PART 2 11060 LAND EAST OF FINNINGTON LANDSCAPE STATEMENT V3 Objection Comment · 02 Mar 2026
  • FOF HERITAGE IMPACT ASSESSMENT_V.5. Objection Comment · 01 Mar 2026
  • ONLINE COMMENT Public Comment · 12 Feb 2026
  • 20260126 BIODIVERSITY METRIC (V4) - STANWORTH LAND, CHIPPING Report · 26 Jan 2026
  • 20260126 UES DRAFT BIODIVERSITY GAIN PLAN - STANWORTH LAND - REPORT ONLY Report · 26 Jan 2026
  • 20260126 UES DRAFT HABITAT MANAGEMENT & MONITORING PLAN - STANWORTH LAND, CHIPPI Report · 26 Jan 2026
  • APPENDIX 1 - UKHAB CLASSIFICATION PLAN Report · 26 Jan 2026
  • APPENDIX 10 - OFFSITE COMPENSATION AREA 1 - BASELINE Report · 26 Jan 2026
  • APPENDIX 11 - OFFSITE COMPENSATION AREA 1 - PARCEL 3 QUADRAT DATA (ACID GRASSLAN Report · 26 Jan 2026
  • APPENDIX 11 - OFFSITE COMPENSATION AREA 1 - PARCEL 3 QUADRAT DATA (MODIFIED GRAS Report · 26 Jan 2026
  • APPENDIX 11 - OFFSITE COMPENSATION AREA 1 - PARCEL 3 QUADRAT DATA (OTHER NEUTRAL Report · 26 Jan 2026
  • APPENDIX 12 - OFFSITE COMPENSATION AREA 1 - PHOTOGRAPHS. Report · 26 Jan 2026
  • APPENDIX 13 - OFFSITE COMPENSATION AREA 1 - ENHANCEMENT UKHAB PLAN. Report · 26 Jan 2026
  • APPENDIX 14 - OFFSITE COMPENSATION AREA 2 - BASELINE UKHAB PLAN Report · 26 Jan 2026
  • APPENDIX 15 - OFFSITE COMPENSATION AREA 2 - OFFSITE ENHANCEMENT UKHAB PLAN. Report · 26 Jan 2026
  • APPENDIX 2 - UKHAB BNG BASELINE PLAN Report · 26 Jan 2026
  • APPENDIX 3 - ONSITE CONDITION ASSESSMENT DATA Report · 26 Jan 2026
  • APPENDIX 4 - ONSITE TREE CONDITION ASSESSMENT AATA Report · 26 Jan 2026
  • APPENDIX 5 - ONSITE QUADRAT DATA & SPECIES LISTS Report · 26 Jan 2026
  • APPENDIX 6 - ONSITE QUADRAT PLAN Report · 26 Jan 2026
  • APPENDIX 7 - ONSITE PHOTOGRAPHS. Report · 26 Jan 2026
  • APPENDIX 8 - ONSITE POST-DEVELOPMENT UKHAB PLAN Report · 26 Jan 2026
  • APPENDIX 9 - OFFSITE COMPENSATION AREA 1 - LOCATION PLAN. Report · 26 Jan 2026
  • LVIA REBUTTAL DOC 5 STANWORTH WA SLR LVIA RESPONSE Report · 18 Dec 2025
  • JLL DOC 1 STANWORTH EMPLOYMENT LAND STATEMENT 01.08.25 Report · 18 Dec 2025
  • HERITAGE REBUTTAL DOC 3 STANWORTH WA SLR HERITAGE RESPONSE_2 Report · 18 Dec 2025
  • HERITAGE REBUTTAL DOC 2 STANWORTH WA SLR HERITAGE RESPONSE_2 Report · 18 Dec 2025
  • PHOTO MONTAGE- GM13703-FIGURE 11.31 DRAFT VIEWPOINT 14 PROPOSED VIEW Planning File · 18 Dec 2025
  • PHOTO MONTAGE- GM13703-FIGURE 11.30 VIEWPOINT 14 BASELINE PANORAMA Planning File · 18 Dec 2025
  • PHOTO MONTAGE- GM13703-FIGURE 11.29 DRAFT VIEWPOINT 11 PROPOSED VIEW. Planning File · 18 Dec 2025
  • PHOTO MONTAGE- GM13703-FIGURE 11.28 VIEWPOINT 11 BASELINE PANORAMA Planning File · 18 Dec 2025
  • PHOTO MONTAGE-GM13703-FIGURE 11.27 DRAFT VIEWPOINT 10 PROPOSED VIEW. Planning File · 18 Dec 2025
  • PHOTO MONTAGE- GM13703-FIGURE 11.26 VIEWPOINT 10 BASELINE PANORAMA Planning File · 18 Dec 2025
  • PHOTO MONTAGE- GM13703-FIGURE 11.25 DRAFT VIEWPOINT 1 PROPOSED VIEW Planning File · 18 Dec 2025
  • PHOTO MONTAGE- GM13703-FIGURE 11.24 VIEWPOINT 1 BASELINE PANORAMA Planning File · 18 Dec 2025
  • 20251104 UES BAT GLTA, ATA & PA REPORT - STANWORTH Planning Application (inc initial correspondence) · 15 Dec 2025
  • 20250807 UES BNG BIODIVERSITY STATEMENT (V3) -STANWORTH LAND Planning Application (inc initial correspondence) · 15 Dec 2025
  • 20250807 UES BIODIVERSITY NET GAIN ASSESSMENT STATUTORY METRIC (V3) -STANWORTH L Planning Application (inc initial correspondence) · 15 Dec 2025
  • 20250704 UES OFFSITE BIODIVERSITY NET GAIN COMPENSATION AREAS ASSESSMENT - STANW Planning Application (inc initial correspondence) · 15 Dec 2025
  • ECOLOGY Consultee Response · 11 Dec 2025
  • LCC HIGHWAYS 28.11.25 Consultee Response · 28 Nov 2025
  • SITE NOTICE - PLANNING APPLICATIONS Correspondence · 27 Nov 2025
  • P22026-202C VISIBILITY TO SIGNAL HEADS Consultee Comment · 27 Nov 2025
  • P22026-201E OLD TOLL BAR SIGNALS Consultee Comment · 27 Nov 2025
  • P22026-004D Consultee Comment · 27 Nov 2025
  • P22026-003Q - PROPOSED FINNINGTON LANE ACCESS Consultee Comment · 27 Nov 2025
  • NATIONAL HIGHWAYS Consultee Comment · 27 Nov 2025
  • SITE NOTICE - PLANNING APPLICATIONS Correspondence · 27 Nov 2025
  • UNITED UTILITIES Consultee Response · 20 Nov 2025
  • CRT Consultee Response · 19 Nov 2025
  • ONLINE COMMENT Public Comment · 12 Nov 2025
  • ONLINE COMMENT Public Comment · 12 Nov 2025
  • ONLINE COMMENT Public Comment · 12 Nov 2025
  • ONLINE COMMENT Public Comment · 12 Nov 2025
  • LLFA RESPONSE Consultee Response · 12 Nov 2025
  • ONLINE COMMENT Public Comment · 12 Nov 2025
  • ONLINE COMMENT Public Comment · 12 Nov 2025
  • ONLINE COMMENT Public Comment · 12 Nov 2025
  • BWD CONSULTATION RESPONSE NOV 2025 Consultee Comment · 12 Nov 2025
  • ENVIRONMENT AGENCY Consultee Response · 11 Nov 2025
  • THE HISTORIC ENVIRONMENT TEAM'S Consultee Response · 06 Nov 2025
  • NATURAL ENGLAND Consultee Response · 05 Nov 2025
  • HEALTH AND SAFETY EXECUTIVE Consultee Response · 30 Oct 2025
  • CADENT HOLDING OBJECTION Consultee Response · 28 Oct 2025
  • FRIENDS OF FINNINGTON GROUP Objection Comment · 27 Oct 2025
  • FRIENDS OF FINNINGTON LEGAL OPINION Objection Comment · 27 Oct 2025
  • FRIENDS OF FINNINGTON HERITAGE IMPACT ASSESSMENT V2 Objection Comment · 27 Oct 2025
  • FRIENDS OF FINNINGTON LANDSCAPE STATEMENT V2 Objection Comment · 27 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • CONSULTATION LETTER Correspondence · 22 Oct 2025
  • STANWORTH LAND ES ADDENDUM_9 Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_8 Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_7 Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_6. Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_5 Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_4 Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_3 Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_2 Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_14. Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_13 Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_12. Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_11. Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_10. Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_1 Amended Plans · 17 Oct 2025
  • STANWORTH LAND ES ADDENDUM_0. Amended Plans · 17 Oct 2025
  • NON-TECHNICAL SUMMARY ADDENDUM. Report · 17 Oct 2025
  • ENVIRONMENTAL STATEMENT ADDENDUM. Report · 17 Oct 2025
  • ENVIRONMENTAL STATEMENT ADDENDUM - SUBMISSION CHECKLIST Report · 17 Oct 2025
  • APPENDIX A.9.9 OFFSITE COMPENSATION AREA BNG ASSESSMENT. Report · 17 Oct 2025
  • APPENDIX A.9.8 2025 GCN EDNA RESULTS. Report · 17 Oct 2025
  • APPENDIX A.9.7 BIODIVERSITY PHOTOGRAPHS. Report · 17 Oct 2025
  • APPENDIX A.9.6 GRASSLAND QUADRAT LOCATION PLAN. Site Location Plan · 17 Oct 2025
  • APPENDIX A.9.5 CONDITION ASSESSMENT QUADRAT DATA SPECIES Report · 17 Oct 2025
  • APPENDIX A.9.4 BNG BASELINE TREES ASSESSMENT CONDITION Report · 17 Oct 2025
  • APPENDIX A.9.3 BNG BASELINE ASSESSMENT CONDITION Report · 17 Oct 2025
  • APPENDIX A.9.2 BNG BASELINE ASSESSMENT UKHAB PLAN Report · 17 Oct 2025
  • APPENDIX A.9.10 BIODIVERSITY STATEMENT Report · 17 Oct 2025
  • APPENDIX A.9.1 UKHAB CLASSIFICATION PLAN Report · 17 Oct 2025
  • APPENDIX A.8.1 FLOOD RISK ASSESSMENT Report · 17 Oct 2025
  • APPENDIX A.7.2 - AGRICULTURAL LAND CLASSIFICATION. Report · 17 Oct 2025
  • APPENDIX A.7.1 AGRICULTURAL LAND CLASSIFICATION REPORT. Report · 17 Oct 2025
  • APPENDIX A.4.2 - DETAILED SITES ASSESSMENT UPDATE. Report · 17 Oct 2025
  • APPENDIX A.4.1 - ALTERNATIVE SITES ASSESSMENT UPDATE. Report · 17 Oct 2025
  • APPENDIX A.3.1 OUTLINE CEMP. Report · 17 Oct 2025
  • APPENDIX A.17.5 REGULATION 19 REPRESENTATIONS. Report · 17 Oct 2025
  • APPENDIX A.17.4 EMPLOYMENT LAND STATEMENT. Report · 17 Oct 2025
  • APPENDIX A.17.3 STUDY AREA DATA Report · 17 Oct 2025
  • APPENDIX A.17.2 EMPLOYMENT LAND REPORT. Report · 17 Oct 2025
  • APPENDIX A.17.1 SOCIO-ECONOMICS STATEMENT UPDATE. Report · 17 Oct 2025
  • APPENDIX A.14.1 - NOISE AND VIBRATION DRAWINGS 14.1 - 14.7. Report · 17 Oct 2025
  • APPENDIX A.13.1 - SENSITIVITY ANALYSIS RESULTS. Report · 17 Oct 2025
  • APPENDIX A.12.1 TRANSPORT ASSESSMENT ADDENDUM. Report · 17 Oct 2025
  • APPENDIX A.1.5 STATEMENT OF EXPERTISE ADDENDUM Report · 17 Oct 2025
  • APPENDIX A.1.3 PROPOSED ILLUSTRATIVE MASTERPLAN. Report · 17 Oct 2025
  • APPENDIX A.1.2 GENERAL ARRANGEMENT MSE WALL PLAN SECTIONS. Report · 17 Oct 2025
  • GMD662~1.PDF Planning File · 17 Oct 2025
  • GMD2A9~1.PDF Planning File · 17 Oct 2025
  • GMCFD4~1.PDF Planning File · 17 Oct 2025
  • GMC1CF~1.PDF Planning File · 17 Oct 2025
  • GMB36A~1.PDF Planning File · 17 Oct 2025
  • GMB299~1.PDF Planning File · 17 Oct 2025
  • GM9A51~1.PDF Planning File · 17 Oct 2025
  • GM8054~1.PDF Planning File · 17 Oct 2025
  • GM716A~1.PDF Planning File · 17 Oct 2025
  • GM6C9C~1.PDF Planning File · 17 Oct 2025
  • GM63C9~1.PDF Planning File · 17 Oct 2025
  • GM5389~1.PDF Planning File · 17 Oct 2025
  • GM3220~1.PDF Planning File · 17 Oct 2025
  • GM2A57~1.PDF Planning File · 17 Oct 2025
  • GM1370~4.PDF Planning File · 17 Oct 2025
  • GM1370~3.PDF Planning File · 17 Oct 2025
  • GM1370~2.PDF Planning File · 17 Oct 2025
  • GM1370~1.PDF Planning File · 17 Oct 2025
  • GM105A~1.PDF Planning File · 17 Oct 2025
  • GM0443~1.PDF Planning File · 17 Oct 2025
  • 3845-D~4.PDF Amended Plans · 17 Oct 2025
  • 3845-D~3.PDF Amended Plans · 17 Oct 2025
  • 3845-D~2.PDF Amended Plans · 17 Oct 2025
  • 3845-D~1.PDF Amended Plans · 17 Oct 2025
  • CONSULTATION LETTER Correspondence · 16 Oct 2025
  • STA2311_PP01.19_P6_PLANTING PLAN SHEET 19 Site Elevations, Building Plans etc. · 30 Sep 2025
  • STA2311_PP01.12_P6_PLANTING PLAN SHEET 12 Site Elevations, Building Plans etc. · 30 Sep 2025
  • STA2311_PP01.00_P6_PLANTING PLAN SCHEDULE AND SPECIFICATION Site Elevations, Building Plans etc. · 30 Sep 2025
  • JLL STANWORTH EMPLOYMENT LAND STATEMENT 01.08.25 Report · 29 Sep 2025
  • FI011 10 R02 UPDATED GREY BELT ASSESSMENT. Report · 29 Sep 2025
  • FI011 003 V7 DEVELOPMENT SCHEDULE Report · 29 Sep 2025
  • FI011 001 R01 STANWORTH REPLACEMENT PLANNING STATEMENT WAPP1 Planning File · 29 Sep 2025
  • 3845_LAND CONTROLLED BY APPLICANT SITE PLAN_1-2500 AT A1 Site Elevations, Building Plans etc. · 29 Sep 2025
  • 3845-DMWR-XX-00-DR-A-009 REV E - PROPOSED CONSTRAINTS PLAN GAS PIPES. Site Elevations, Building Plans etc. · 29 Sep 2025
  • 3845-DMWR-XX-00-DR-A-008 REV E - PROPOSED CONSTRAINTS PLAN ELECTRIC. Site Elevations, Building Plans etc. · 29 Sep 2025
  • 3845-DMWR-XX-00-DR-A-007 REV D - PROPOSED LANDSCAPE PLAN. Site Elevations, Building Plans etc. · 29 Sep 2025
  • 3845-DMWR-XX-00-DR-A-006 REV F - PROPOSED PARAMETER PLAN. Site Elevations, Building Plans etc. · 29 Sep 2025
  • 3845-DMWR-XX-00-DR-A-005 REV E - PROPOSED CONSTRAINTS PLAN. Site Elevations, Building Plans etc. · 29 Sep 2025
  • 3845-DMWR-XX-00-DR-A-004 REV E - PROPOSED LANDSCAPE PARAMETER PLAN Site Elevations, Building Plans etc. · 29 Sep 2025
  • 3845-DMWR-XX-00-DR-A-003 REV F - PROPOSED ILLUSTRATIVE MASTERPLAN Site Elevations, Building Plans etc. · 29 Sep 2025
  • P22026-202A VISIBILITY TO SIGNAL HEADS Site Elevations, Building Plans etc. · 29 Sep 2025
  • P22026-201C OLD TOLL BAR SIGNALS Site Elevations, Building Plans etc. · 29 Sep 2025
  • P22026-004D PROPOSED PED CYCLE IMPROVEMENT Site Elevations, Building Plans etc. · 29 Sep 2025
  • P22026-003P PROPOSED FINNINGTON LANE ACCESS Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.29_P5_PLANTING PLAN SHEET 29. Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.28_P5_PLANTING PLAN SHEET 28. Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.27_P5_PLANTING PLAN SHEET 27 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.26_P5_PLANTING PLAN SHEET 26 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.25_P5_PLANTING PLAN SHEET 25 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.24_P5_PLANTING PLAN SHEET 24 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.23_P5_PLANTING PLAN SHEET 23 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.22_P5_PLANTING PLAN SHEET 22. Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.21_P5_PLANTING PLAN SHEET 21. Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.20_P5_PLANTING PLAN SHEET 20. Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.18_P5_PLANTING PLAN SHEET 18. Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.17_P5_PLANTING PLAN SHEET 17 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.16_P5_PLANTING PLAN SHEET 16 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.15_P5_PLANTING PLAN SHEET 15 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.14_P5_PLANTING PLAN SHEET 14 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.13_P5_PLANTING PLAN SHEET 13 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.11_P5_PLANTING PLAN SHEET 11 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.10_P5_PLANTING PLAN SHEET 10. Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.09_P5_PLANTING PLAN SHEET 9 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.08_P5_PLANTING PLAN SHEET 8 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.07_P5_PLANTING PLAN SHEET 7 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.06_P5_PLANTING PLAN SHEET 6 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.05_P5_PLANTING PLAN SHEET 5 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.04_P5_PLANTING PLAN SHEET 4 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.03_P5_PLANTING PLAN SHEET 3 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.02_P5_PLANTING PLAN SHEET 2 Site Elevations, Building Plans etc. · 29 Sep 2025
  • STA2311_PP01.01_P5_PLANTING PLAN SHEET 1 Site Elevations, Building Plans etc. · 29 Sep 2025
  • NH RESPONSE NOTICE - FINNINGTON LANE BUSINESS PARK HOLD SEPT 25.PDF Consultee Response · 17 Sep 2025
  • ACTIVE TRAVEL ENGLAND Consultee Comment · 22 Jul 2025
  • HSE LUP ADVICE - CHORLEY COUNCIL - 24-00847-OUTMAJ - P2602 - 15 JULY 2025.PDF Consultee Comment · 15 Jul 2025
  • NATIONAL HIGHWAYS| Consultee Response · 09 Jul 2025
  • STANWORTH GREY BELT ASSESSMENT FI011_10 Planning Application (inc initial correspondence) · 12 Jun 2025
  • CANAL SOCIETY Consultee Response · 17 Apr 2025
  • NATIONAL HIGHWAYS Consultee Response · 09 Apr 2025
  • VPI POWER LTD - OBJECTION Consultee Comment · 31 Mar 2025
  • SITE NOTICE - PLANNING APPLICATIONS Correspondence · 26 Mar 2025
  • CONSULTATION LETTER Correspondence · 24 Mar 2025
  • HEALTH SAFETY EXECUTIVE Consultee Response · 20 Jan 2025
  • CONSULTATION LETTER Correspondence · 14 Jan 2025
  • CONSULTATION LETTER Correspondence · 14 Jan 2025
  • NATIONAL HIGHWAYS Consultee Comment · 07 Jan 2025
  • CLLR MCGOVERN Objection Comment · 26 Dec 2024
  • BRINDLE PARISH COUNCIL Consultee Response · 20 Dec 2024
  • EA RESPONSE Consultee Response · 16 Dec 2024
  • CANAL & RIVER TRUST Consultee Response · 11 Dec 2024
  • UU RESPONSE Consultee Response · 11 Dec 2024
  • SITE NOTICE - PLANNING APPLICATIONS Correspondence · 10 Dec 2024
  • LIVESEY PARISH COUNCIL Consultee Comment · 09 Dec 2024
  • LAND TO EAST OF FINNINGTON LANE - BWD CONSULTATION RESPONSE DEC 2024.PDF Consultee Response · 06 Dec 2024
  • NATIONAL HIGHWAYS Consultee Comment · 03 Dec 2024
  • 24-00847-OUTMAJ - LLFA RESPONSE.PDF Consultee Response · 02 Dec 2024
  • LCC - HISTORIC ENVIRONMENT TEAM'S ADVICE Consultee Response · 02 Dec 2024
  • UES BIODIVERSITY NET GAIN ASSESSMENT STATUTORY METRIC Planning Application (inc initial correspondence) · 27 Nov 2024
  • DISPATCHED - 24 00847 OUTMAJ - TCA RESPONSE.PDF Consultee Response · 27 Nov 2024
  • NATURAL ENGLAND RESPONSE Consultee Response · 27 Nov 2024
  • CADENT RESPONSE Consultee Response · 19 Nov 2024
  • CADENT RESPONSE Consultee Response · 12 Nov 2024
  • ACKNOWLEDGEMENT LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • CONSULTATION LETTER Correspondence · 11 Nov 2024
  • NEIGHBOUR LETTER - INITIAL CONSULTATION Correspondence · 11 Nov 2024
  • COVER LETTER V2 7.10.24 Planning Application (inc initial correspondence) · 06 Nov 2024
  • APPLICATION FORM V2 Planning Application (inc initial correspondence) · 06 Nov 2024
  • INVALID LETTER Correspondence · 05 Nov 2024
  • REV B SITE LOCATION PLAN Site Location Plan · 09 Oct 2024
  • GA SECTIONS Site Elevations, Building Plans etc. · 09 Oct 2024
  • CUT & FILL Site Elevations, Building Plans etc. · 09 Oct 2024
  • REV B EXISTING SITE PLAN Site Elevations, Building Plans etc. · 09 Oct 2024
  • UNIT 1 GROUND FLOOR PLAN REV B Site Elevations, Building Plans etc. · 09 Oct 2024
  • UNIT 2 GROUND FLOOR PLAN REV B Site Elevations, Building Plans etc. · 09 Oct 2024
  • UNIT 1 ROOF PLAN REV A Site Elevations, Building Plans etc. · 09 Oct 2024
  • UNIT 2 ROOF PLAN REV A Site Elevations, Building Plans etc. · 09 Oct 2024
  • UNIT 1 NORTH-EAST ELEVATIONS REV A Site Elevations, Building Plans etc. · 09 Oct 2024
  • UNIT 1 SOUTH-WEST ELEVATIONS REV A Site Elevations, Building Plans etc. · 09 Oct 2024
  • UNIT 2 SOUTH-WEST ELEVATIONS REV A Site Elevations, Building Plans etc. · 09 Oct 2024
  • UNIT 2 NORTH-EAST ELEVATIONS REV A Site Elevations, Building Plans etc. · 09 Oct 2024
  • AGRICULTURAL LAND CLASSIFICATION JULY 2024 UPDATE Site Elevations, Building Plans etc. · 09 Oct 2024
  • AGRICULTURAL LAND CLASSIFICATION Site Elevations, Building Plans etc. · 09 Oct 2024
  • APPENDIX 1.1 SITE LOCATION PLAN Site Location Plan · 09 Oct 2024
  • APPENDIX 3.1 PARAMETER PLAN Site Elevations, Building Plans etc. · 09 Oct 2024
  • APPENDIX 3.2 ILLUSTRATIVE MASTERPLAN Site Elevations, Building Plans etc. · 09 Oct 2024
  • APPENDIX 3.3 LANDSCAPE PARAMETER PLAN Site Elevations, Building Plans etc. · 09 Oct 2024
  • APPENDIX 3.4 CONSTRAINTS PLAN Site Elevations, Building Plans etc. · 09 Oct 2024
  • APPENDIX 3.5 INDICATIVE LANDSCAPE STRATEGY PLAN Site Elevations, Building Plans etc. · 09 Oct 2024
  • APPENDIX 3.6 CUT AND FILL PLAN Site Elevations, Building Plans etc. · 09 Oct 2024
  • APPENDIX 3.7 OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN Site Elevations, Building Plans etc. · 09 Oct 2024
  • APPENDIX 3.8 OUTLINE LANDSCAPE AND ECOLOGICAL MANAGEMENT PLAN Site Elevations, Building Plans etc. · 09 Oct 2024
  • APPENDIX 4.1 ALTERNATIVE SITES ASSESSMENT Site Elevations, Building Plans etc. · 09 Oct 2024
  • APPENDIX 4.2 DETAILED SITES ASSESSMENTS Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 5.1 SCOPING REPORT (1 OF 2) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 5.1 SCOPING REPORT (2 OF 2) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 5.2 SCOPING OPINION Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 6.1 PHASE 1 GEO-ENVIRONMENTAL DESK STUDY (1 OF 5) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 6.1 PHASE 1 GEO-ENVIRONMENTAL DESK STUDY (2 OF 5) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 6.1 PHASE 1 GEO-ENVIRONMENTAL DESK STUDY (3 OF 5) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 6.1 PHASE 1 GEO-ENVIRONMENTAL DESK STUDY (4 OF 5) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 6.1 PHASE 1 GEO-ENVIRONMENTAL DESK STUDY (5 OF 5) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 6.2 GROUND CONDITIONS ASSESSMENT METHODOLOGY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 6.3 SIGNIFICANCE CRITERIA Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 7.1 AGRICULTURAL LAND CLASSIFICATION Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 7.2 AGRICULTURAL LAND CLASSIFICATION - JULY 2024 UPDATE Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 8.1 FLOOD RISK ASSESSMENT (1 OF 2) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 8.1 FLOOD RISK ASSESSMENT (2 OF 2) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 8.2 LEGISLATION AND POLICY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 8.3 CONSULTATION Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 8.4 SUMMARY OF GEOLOGICAL BOREHOLE LOGS Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 8.5 WATER FRAMEWORK DIRECTIVE ASSESSMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.9 BIODIVERSITY IMPACT ASSESSMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.8 BROWN HARE AND HEDGEHOG PRECAUTIONARY WORKING METHOD STATEMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.7 OTTER SURVEY REPORT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.6 WINTERING BIRD SURVEY REPORT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.5 BREEDING BIRD SURVEY REPORT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.4 WHITE CLAWED CRAYFISH SURVEY REPORT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.3 BAT SURVEY REPORT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.2 PRELIMINARY ECOLOGICAL APPRAISAL REPORT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.12 ECOLOGICAL WALKOVER Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.11 HISTORIC MAP REGRESSION FOR ECOLOGY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.10 ARBORICULTURAL IMPACT ASSESSMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 9.1 LEGISLATION POLICY AND GUIDANCE Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 10.1 LEGISLATION AND POLICY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 10.2 ARCHAEOLOGY AND HERITAGE STATEMENT (1 OF 2) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 10.2 ARCHAEOLOGY AND HERITAGE STATEMENT (2 OF 2) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 10.3 ASSESSMENT METHODOLOGY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.1 METHODOLOGY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.2 VISUAL ASSESSMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (1 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (10 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (2 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (3 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (4 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (5 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (6 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (7 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (8 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (9 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (11 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (12 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (13 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (14 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (15 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (16 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (17 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (18 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (19 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (20 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (21 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 11.3 FIGURES (22 OF 22) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 12.1 TRANSPORT ASSESSMENT (1 OF 3) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 12.1 TRANSPORT ASSESSMENT (2 OF 3) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 12.1 TRANSPORT ASSESSMENT (3 OF 3) Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 12.2 INTERIM TRAVEL PLAN Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 12.3 SENSITIVE RECEPTOR LOCATION PLAN Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 13.1 LEGISLATION POLICY AND GUIDANCE Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 13.2 ASSESSMENT METHODOLOGY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 13.3 SENSITIVITY ANALYSIS RESULTS Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 13.4 FIGURES Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 14.1 LEGISLATION POLICY AND GUIDANCE Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 14.2 CONSULTATION Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 14.3 NOISE MONITORING DATA Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 14.4 BS4142 ASSESSMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 14.5 FIGURES Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 15.1 LEGISLATION POLICY AND GUIDANCE Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 15.2 WASTE STRATEGY AND SITE WASTE MANAGEMENT PLAN Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 16.1 LEGISLATION AND POLICY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 17.1 SOCIO ECONOMIC STATEMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 17.2 EMPLOYMENT LAND REPORT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 17.3 STUDY AREA DATA Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 19.1 RISK TABLE Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 18.1 RAPID HEALTH IMPACT ASSESSMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 18.2 EIA HEALTH ASSESSMENT METHODOLOGY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 18.3 CHORLEY LOCAL AUTHORITY HEALTH PROFILE Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 18.4 BLACKBURN WITH DARWEN LOCAL AUTHORITY HEALTH PROFILE Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 18.5 CHORLEY NORTH EAST WARD LOCAL HEALTH SUMMARY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 18.6 CLAYTON EAST BRINDLE AND HOGHTON WARD LOCAL HEALTH SUMMARY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 18.7 LIVESEY WITH PLEASINGTON WARD LOCAL HEALTH SUMMARY Planning Application (inc initial correspondence) · 09 Oct 2024
  • APPENDIX 18.8 DARWEN WEST WARD LOCAL HEALTH SUMMARY Planning Application (inc initial correspondence) · 09 Oct 2024
  • ARBORICULTURAL IMPACT ASSESSMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • ARCHAEOLOGY AND HERITAGE STATEMENT (1 OF 2) Planning Application (inc initial correspondence) · 09 Oct 2024
  • ARCHAEOLOGY AND HERITAGE STATEMENT (2 OF 2) Planning Application (inc initial correspondence) · 09 Oct 2024
  • BAT SURVEY REPORT Planning Application (inc initial correspondence) · 09 Oct 2024
  • BIODIVERSITY ADDENDUM APPENDIX 1 UKAB PLAN Planning Application (inc initial correspondence) · 09 Oct 2024
  • BIODIVERSITY ADDENDUM APPENDIX 2 BNG BASELINE ASSESS UKHAB Planning Application (inc initial correspondence) · 09 Oct 2024
  • BIODIVERSITY ADDENDUM APPENDIX 3 BNG BASELINE ASSESS COND Planning Application (inc initial correspondence) · 09 Oct 2024
  • BIODIVERSITY ADDENDUM APPENDIX 4 BNG BASELINE TREES ASSESS Planning Application (inc initial correspondence) · 09 Oct 2024
  • BIODIVERSITY ADDENDUM APPENDIX 5 CONDITION ASSESSMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • BIODIVERSITY ADDENDUM APPENDIX 6 GRASSLAND QUADRAT PLAN Planning Application (inc initial correspondence) · 09 Oct 2024
  • BIODIVERSITY ADDENDUM APPENDIX 7 PHOTOS Planning Application (inc initial correspondence) · 09 Oct 2024
  • BIODIVERSITY ADDENDUM APPENDIX 8 BIODIVERSITY STATEMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • BIODIVERSITY ADDENDUM CHAPTER 9 REPORT UES SEP24 Planning Application (inc initial correspondence) · 09 Oct 2024
  • BIODIVERSITY IMPACT ASSESSMENT GM12251-011 MAY 24 Planning Application (inc initial correspondence) · 09 Oct 2024
  • BIODIVERSITY NET GAIN - BIODIVERSITY STATEMENT UES04220-06 SEPT24 Planning Application (inc initial correspondence) · 09 Oct 2024
  • BREEDING BIRD SURVEY REPORT GM12251-001 Planning Application (inc initial correspondence) · 09 Oct 2024
  • BROWN HARE AND HEDGEHOG PRECAUTIONARY WMS GM12251-016 Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 1 INTRODUCTION Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 10 ARCHAEOLOGY AND HERITAGE Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 2 SITE DESCRIPTION Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 3 DEVELOPMENT DESCRIPTION Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 4 CONSIDERATION OF ALTERNATIVES Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 5 APPROACH TO ENVIRONMENTAL IMPACT ASSESSMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 6 GROUND CONDITIONS Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 7 AGRICULTURAL LAND Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 8 WATER RESOURCES Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 9 BIODIVERSITY - WA JUL24 Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 11 LANDSCAPE AND VISUAL Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 12 TRAFFIC AND TRANSPORT Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 13 AIR QUALITY Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 14 NOISE AND VIBRATION Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 15 MATERIALS AND WASTE Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 16 CLIMATE CHANGE Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 17 SOCIO-ECONOMICS Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 18 HEALTH Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 19 VULNERABILITY TO MAJOR ACCIDENTS AND DISASTERS Planning Application (inc initial correspondence) · 09 Oct 2024
  • CHAPTER 20 SUMMARY OF RESIDUAL AND CUMULATIVE EFFECTS Planning Application (inc initial correspondence) · 09 Oct 2024
  • DESIGN & ACCESS STATEMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • DEVELOPMENT SCHEDULE Planning Application (inc initial correspondence) · 09 Oct 2024
  • EMPLOYMENT LAND NEEDS ASSESSMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • EMPLOYMENT LAND REPORT UPDATE JUL 24 INC APPENDICES Planning Application (inc initial correspondence) · 09 Oct 2024
  • FLOOD RISK ASSESSMENT GM12251-013 (1 OF 2) Planning Application (inc initial correspondence) · 09 Oct 2024
  • FLOOD RISK ASSESSMENT GM12251-013 (2 OF 2) Planning Application (inc initial correspondence) · 09 Oct 2024
  • INTERIM TRAVEL PLAN P22025-TP Planning Application (inc initial correspondence) · 09 Oct 2024
  • MINERAL RESOURCE ASSESSMENT GM12251-012 Planning Application (inc initial correspondence) · 09 Oct 2024
  • OTTER SURVEY REPORT GM12258-019 Planning Application (inc initial correspondence) · 09 Oct 2024
  • OUTLINE CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN GM12251-017 Planning Application (inc initial correspondence) · 09 Oct 2024
  • OUTLINE LANDSCAPE AND ECOLOGICAL MANAGEMENT PLAN GM12251-020 Planning Application (inc initial correspondence) · 09 Oct 2024
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY GM12251-001 (1 OF 5) Planning Application (inc initial correspondence) · 09 Oct 2024
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY GM12251-001 (2 OF 5) Planning Application (inc initial correspondence) · 09 Oct 2024
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY GM12251-001 (3 OF 5) Planning Application (inc initial correspondence) · 09 Oct 2024
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY GM12251-001 (4 OF 5) Planning Application (inc initial correspondence) · 09 Oct 2024
  • PHASE 1 GEO-ENVIRONMENTAL DESK STUDY GM12251-001 (5 OF 5) Planning Application (inc initial correspondence) · 09 Oct 2024
  • PLANNING STATEMENT STANWORTH FI011 Planning Application (inc initial correspondence) · 09 Oct 2024
  • PRELIMINARY ECOLOGICAL APPRAISAL REPORT GM12258-001 Planning Application (inc initial correspondence) · 09 Oct 2024
  • RAPID HEALTH IMPACT ASSESSMENT Planning Application (inc initial correspondence) · 09 Oct 2024
  • REP-022 NON-TECHNICAL SUMMARY Planning Application (inc initial correspondence) · 09 Oct 2024
  • SOCIO-ECONOMIC STATEMENT FI011-004 Planning Application (inc initial correspondence) · 09 Oct 2024
  • PLANTING PLAN SHEET 1 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 2 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 3 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 4 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 5 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 6 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 7 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 8 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 9 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 10 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 11 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 12 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 13 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 14 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 15 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 16 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 17 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 18 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 19 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 20 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 21 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 22 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 23 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 24 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 25 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 26 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 27 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SHEET 28 Site Elevations, Building Plans etc. · 09 Oct 2024
  • PLANTING PLAN SCHEDULE AND SPECIFICATION Site Elevations, Building Plans etc. · 09 Oct 2024
  • STANWORTH LAND VALIDATION CHECKLIST 1 - DOCUMENTS Planning Application (inc initial correspondence) · 09 Oct 2024
  • STANWORTH LAND VALIDATION CHECKLIST 2 - DRAWINGS Planning Application (inc initial correspondence) · 09 Oct 2024
  • STANWORTH LAND VALIDATION CHECKLIST 3 - EIA Planning Application (inc initial correspondence) · 09 Oct 2024
  • TRANSPORT ASSESSMENT P22026_TA (1 OF 3) Planning Application (inc initial correspondence) · 09 Oct 2024
  • TRANSPORT ASSESSMENT P22026_TA (2 OF 3) Planning Application (inc initial correspondence) · 09 Oct 2024
  • TRANSPORT ASSESSMENT P22026_TA (3 OF 3) Planning Application (inc initial correspondence) · 09 Oct 2024
  • VOLUME I COVERS AND CONTENTS Planning Application (inc initial correspondence) · 09 Oct 2024
  • VOLUME I GLOSSARY Planning Application (inc initial correspondence) · 09 Oct 2024
  • VOLUME I NEXT STEPS Planning Application (inc initial correspondence) · 09 Oct 2024
  • VOLUME I REFERENCE LIST Planning Application (inc initial correspondence) · 09 Oct 2024
  • VOLUME I STATEMENT OF EXPERTISE Planning Application (inc initial correspondence) · 09 Oct 2024
  • VOLUME II APPENDICES FLYSHEETS Planning Application (inc initial correspondence) · 09 Oct 2024
  • VOLUME II COVERS AND CONTENTS Planning Application (inc initial correspondence) · 09 Oct 2024
  • WASTE STRATEGY AND SITE WASTE MANAGEMENT PLAN GM12251-0001 Planning Application (inc initial correspondence) · 09 Oct 2024
  • WHITE-CLAWED CRAYFISH SURVEY REPORT GM12258-006 Planning Application (inc initial correspondence) · 09 Oct 2024
  • WINTERING BIRD SURVEY REPORT GM12258-015 Planning Application (inc initial correspondence) · 09 Oct 2024
  • 241008 STANWORTH LAND STATEMENT OF COMMUNITY INVOLVEMENT Planning Application (inc initial correspondence) · 09 Oct 2024

Watch members (£5 a month) open the document list from here.

Open the documents

What this refusal means

Chorley refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Chorley

  • 26/00177/PIP Granted

    Land At Orchard Heys Farm Park Road Coppull Chorley PR7 5AH

    Application for Permission in Principle for up to 6no. dwellinghouses

    Received 20 Feb, published by the council 21 Jul 2026 Outline
  • 26/00012/PIP Granted

    37 Preston Road Coppull Chorley PR7 5HS

    Permission in principle application for the erection of four dwellinghouses

    Received 7 Jan, published by the council 21 Jul 2026 Outline
  • 26/00699/PIP Awaiting decision

    Land Adjacent To Moorglen Sandy Lane Mawdesley Ormskirk L40 2QB

    Permission in principle application for the construction of one dwelling

    Received 7 Aug, published by the council 11 Aug 2026 Outline
  • 26/00690/PIP Awaiting decision

    Rigby House Farm The Common Adlington Chorley PR7 4DS

    Permission in principle application for 1 Dwelling

    Received 5 Aug, published by the council 11 Aug 2026 Outline
  • 26/00682/PIP Awaiting decision

    Land And Building Adjoining Carr Lane, Croston, PR26 9RE

    Permission in principle application for the erection of 1 dwelling and the formation of a residents parking area, following demolition of existing buildings.

    Received 3 Aug, published by the council 11 Aug 2026 Outline