Planning application
Strathyre Jenny Lane Higher Wheelton Chorley PR6 8JE
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Notification of a proposed single storey rear extension measuring 5.17m in depth, with eaves height of 2.85m, and a maximum height of 2.85m
As published by the council, reference 23/00157/PDE
Application record
- Reference
- 23/00157/PDE
- Type
- General Permitted Dev - Extensions
- Status
- Other decision
- Decision
- Granted As published: Prior Approval Not Required
- Received
- 10 Feb 2023
- Validated
- 10 Feb 2023
- Decided
- 22 Mar 2023
- Ward
- Chorley North East
- Parish
- Wheelton
- Decision by
- Delegated Decision
- Postcode
- PR6 8JE
Site history
Applications at this address on the Chorley register
This site has had 2 applications since 2023: 2 approved, 0 refused.
-
23/00129/CLPUD Granted
Strathyre Jenny Lane Higher Wheelton Chorley PR6 8JE
Application for a certificate of lawfulness for a proposed rear dormer
Timeline
Dates from the published record
-
10 Feb 2023
Received by Chorley
-
22 Mar 2023
Decision issued: Prior Approval Not Required
-
30 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Ronson Building Design Ltd Agent, a design practice registered in Bolton
Active · incorporated 2016 · Bolton
137 applications on PlanIndex · across 14 councils · 90% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
The council's own list, drawings first
7 documents on file for this application
Drawings (3)
- Proposed plans elevations
- Location site plan
- Existing plans elevations
Everything on file (7)
- DECISION - PRIOR APPROVAL NOT REQUIRED
- ACKNOWLEDGEMENT LETTER
- NEIGHBOUR LETTER - PERMITTED DEVELOPMENT
- APPLICATIONFORMREDACTED.
- LOCATION SITE PLAN.
- PROPOSED PLANS ELEVATIONS.
- EXISTING PLANS ELEVATIONS
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What this grant of permission means
Chorley granted permission on 22 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Chorley's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Strathyre Jenny Lane Higher Wheelton Chorley PR6 8JE
Application for a certificate of lawfulness for a proposed rear dormer
-
Flashgreen Farm Cottage Jenny Lane Higher Wheelton Chorley PR6 8JE
98% historically approved · decision due ~20 Oct
Single storey side extension and first floor rear extension (over existing ground floor rear extension) with associated alterations following demolition of existing side porch.
Awaiting decision Householder Extension DemolitionSmall domestic -
Flash Green Farm Jenny Lane Higher Wheelton Chorley PR6 8JE
Single storey rear extension following removal of the existing timber porch
Small domestic -
Flash Green Farm Jenny Lane Higher Wheelton Chorley PR6 8JE
Listed building consent for single storey rear extension following removal of the existing timber porch
Small domestic -
Flashgreen Farm Cottage Jenny Lane Higher Wheelton Chorley PR6 8JE
98% historically approved · decision due ~20 Oct
Single storey side extension and first floor rear extension (over existing ground floor rear extension) with associated alterations following demolition of existing side porch.
Small domestic -
Highfield 20 Bett Lane Higher Wheelton Chorley PR6 8JH
Change of use of a parcel of land from agricultural use to residential garden land incidental to 20 Bett Lane. No buildings, structures or engineering operations are proposed. The site is enclosed by post and rail fencing, installed in accordance with the agreed boundary treatment.