Skip to content
PlanIndex Get alerts
Menu

Planning application

Town Lane Farm Town Lane Heskin Chorley PR7 5QA

Granted Chorley 22/00316/FUL Full Planning

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Relocation of lawful agricultural building

As published by the council, reference 22/00316/FUL

Application record

Reference
22/00316/FUL
Type
Full Planning
Status
Granted
Decision
Permit Full Planning Permission
Received
16 Mar 2022
Validated
16 Mar 2022
Decided
16 Mar 2023
Ward
Eccleston, Heskin And Charnock Richard
Parish
Heskin
Decision by
Delegated Decision
Postcode
PR7 5QA

Site history

Applications at this address on the Chorley register

This site has had 2 applications since 2022: 1 approved, 0 refused.

  • 22/01283/MNMA Decided

    Town Lane Farm Town Lane Heskin Chorley PR7 5QA

    Minor non-material amendment to planning permission ref:17/00599/FUL (Erection of one detached dormer bungalow) to change the orientation of the bungalow to face eastwards

    Decided 9 Feb 2023 Amendments

Timeline

Dates from the published record

  1. 16 Mar 2022

    Received by Chorley

  2. 16 Mar 2023

    Decision issued: Permit Full Planning Permission

  3. 21 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

CW Planning Solutions Ltd Agent, a planning consultancy

50 applications on PlanIndex · across 8 councils · 72% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Chorley granted permission on 16 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Town Lane Farm Town Lane Heskin Chorley PR7 5QA

    22/01283/MNMA Submitted 14 Dec 2022 20m away

    Minor non-material amendment to planning permission ref:17/00599/FUL (Erection of one detached dormer bungalow) to change the orientation of the bungalow to face eastwards

    Decided Amendments Loft or dormer 5 docs
  • Walmsleys Barn Wood Lane Heskin Chorley PR7 5NP

    26/00019/DIS Submitted 9 Jan 2026 64m away

    Application to discharge condition no. 9 (Construction Management Plan) of planning permission ref: 24/01114/FUL (Erection of 3no. self-build dwellings (following demolition of existing outbuildings and equestrian stables building) along with landscaping and access alterations)

    Granted Conditions New dwelling Demolition 16 docs
  • Walmsleys Barn Wood Lane Heskin Chorley PR7 5NP

    26/00444/PDE Submitted 20 May 2026 158m away

    92% historically approved · decision due ~15 Jul

    Notification of a proposed single storey rear extension measuring 8m in depth with eaves height of 2.25m and a maximum height of 4m

    Awaiting decision Extension 16 docs
    Small domestic
  • Walmsleys Barn Wood Lane Heskin Chorley PR7 5NP

    26/00545/DIS Submitted 20 Jun 2026 158m away

    Application to discharge condition numbers 6 (surface water drainage scheme), 11 (management and maintenance of streets), 13 (landscape design plan) and 15 (finished floor levels) of planning permission ref: 26/00147/FUL (Section 73 application to amend condition 4 (approved plans) of planning permission ref: 24/01114/FUL (Erection of 3no. self-build dwellings (following demolition of existing outbuildings and equestrian stables building) along with landscaping and access alterations) in order to alter the position of plots 3 and 4 and the design of plot 3)

    Granted New dwelling Demolition 20 docs
  • 4 The Meadows Heskin Chorley PR7 5NR

    21/00612/FULHH Submitted 17 May 2021 182m away

    Single storey rear extension

    Granted Householder Extension 10 docs
    Small domestic
  • 168 Wood Lane Heskin Chorley PR7 5NP

    23/00261/PDE Submitted 20 Mar 2023 190m away

    Notification of a proposed single storey rear extension measuring 5.1m in depth, with eaves height of 2.6m, and a maximum height of 4m

    Granted Extension 5 docs
    Small domestic

In Chorley

  • 26/00824/FUL Awaiting decision

    Plot 2 Old Withnell Stables Trigg Lane Heapey Chorley PR6 9BZ

    Application for technical details consent for the erection of 1no. self build dwelling pursuant to permission in principle 25/00224/PIP

    14 Sep 2026 Full applications
  • 26/00813/FUL Awaiting decision

    The Bungalow Ridley Lane Mawdesley Ormskirk L40 2RE

    Conversion of existing garage to create 1no. residential dwelling including roof alterations involving the raising of the ridge and eaves height to create a first floor, two storey side extension, new access, off road car parking, and associated landscape works

    10 Sep 2026 Full applications
  • 26/00809/FUL Awaiting decision

    Scrap Yard Town Lane Charnock Richard Chorley PR7 5HQ

    Installation of water tank (retrospective)

    9 Sep 2026 Full applications
  • 26/00798/FUL Awaiting decision

    Land Next To Rose Cottage Sandy Lane Mawdesley Chorley L40 2QB

    Creation of a wildlife pond

    8 Sep 2026 Full applications
  • 26/00792/FUL Awaiting decision

    Golden Acres Ltd Plocks Farm Liverpool Road Bretherton Leyland PR26 9AX

    Section 73 application to vary condition 4 (approved plans) attached to planning permission 20/00449/FULMAJ (Demolition of existing building and erection of new packing hall (with administration facilities) and new canopy over service yard) to reduce demolition with plant / infrastructure contained within the existing building.

    7 Sep 2026 Full applications