Planning application
2 Oak Drive Chorley PR6 7BY
Works: New dwelling Demolition Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of two storey building comprising 8no. apartments with associated parking and infrastructure following demolition of existing building (resubmission of planning application ref: 19/00339/FULMAJ)
As published by the council, reference 21/00734/FUL
Application record
- Reference
- 21/00734/FUL
- Type
- Full Planning
- Status
- Granted
- Decision
- Permit Full Planning Permission
- Received
- 10 Jun 2021
- Validated
- 10 Jun 2021
- Decided
- 9 Sep 2021
- Ward
- Chorley North And Astley
- Parish
- Chorley
- Decision by
- Committee Decision
- Postcode
- PR6 7BY
Timeline
Dates from the published record
-
10 Jun 2021
Received by Chorley
-
9 Sep 2021
Decision issued: Permit Full Planning Permission
-
4 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
22 applications on PlanIndex · across 5 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
37 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Small domestic
-
130 Preston Road Chorley PR6 7AU
Application for a certificate of lawfulness for an existing rear dormer
Granted Lawful development Loft or dormer 8 docs -
Hartwood Green Farmhouse 194 Preston Road Chorley PR6 7AZ
91% historically approved · decision due ~29 Oct
Listed Building Consent for the replacement of existing windows
Awaiting decision Heritage and listed buildings Windows or glazing 17 docs -
10 Hazel Grove Chorley PR6 7BB
Change of use of the dwellinghouse (Use Class C3) to a young persons home (Use Class C2) for a maximum of three young persons with up to four staff members on site, including a manager 9am-5pm Monday to Friday and conversion of garage to habitable accommodation.
Refused Full applications 43 docsDomestic -
18 Linden Grove Chorley PR6 7BN
Application for a certificate of lawfulness for proposed dormers to the west and east roof slopes
Refused Lawful development Loft or dormer 5 docs -
Waterloo Lodge School 173 Preston Road Chorley PR6 7AX
91% historically approved · decision due ~12 Oct
Application to discharge conditions numbered 2 (Method Statement) of application reference 26/00278/LBC (Listed Building Consent for the installation of 3no. air source heat pump units to serve the main teaching block and 1no. air source heat pump to serve the Coach House (Reception). Works to include alterations and the installation of new 2.1m high weld mesh fencing sited to the north west facing elevation of the teaching block.)
Awaiting decision 9 docs
Other full applications applications
In Chorley
-
26/00778/FUL Awaiting decision
405 Preston Road Clayton-le-woods Chorley PR6 7JA
Section 73 application to vary condition no. 2 (the approved plans) of application 24/00272/FULHH (Two storey side/rear extension to northern and western elevation and single storey side extension to southern elevation) to increase the scale of the two storey element and to amend the design of the overall proposal.
-
26/00776/FUL Awaiting decision
The Glen Gib Lane Hoghton Preston PR5 0RU
Section 73 application to vary condition no. 2 (the approved plans) of application 26/00202/FULHH (First floor extension over existing, detached garage) to amend the elevations and increase the roof ridge height
-
26/00769/FUL Awaiting decision
1-3 Clifford Street Chorley PR7 1AQ
Change of use of numbers 1 to 3 Clifford Street across the first and second floors to 2no. one bedroom apartments (Use Class C3) and the replacement of window frames and doors
-
26/00764/FUL Awaiting decision
Boardman Heights Farm Bury Lane Withnell Chorley PR6 8SD
Change of use and conversion of an existing agricultural building to a farm shop
-
26/00750/FUL Awaiting decision
Brinscall Post Office 50 - 54 School Lane Brinscall Chorley PR6 8QP
Change of use of 50 - 54 School Lane to a shop across the ground floor and 2no. residential apartments across the first floor